Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Patron's AddressI was delighted to be invited to be patron of this Joint Conference, but the challenging task you have set yourselves, and your speakers' depth of expertise, deny anyone, even the patron, the
Jan 1, 1978
-
Analysis and Adaptability of Belt Filter Presses and Other Technologies for Tailings Dewatering over a Range of Mineral Processes, Plant Designs, Conditions, Regions and Operating PhilosophiesBy M S. Fenzel
Increased environmental regulations and pressures have created changing and new demands for tailings management strategies in a variety of mining applications. Critical among these items is the dispos
Jul 27, 2015
-
Role of Environmental Ore Deposit Models in Resources DevelopmentBy Y T. J Kwong
With the recent emphasis worldwide on environmental protection and sustainable development, finding an enriched mineral deposit no longer guarantees mining development. Only if the identified resource
Aug 22, 2011
-
Fast, Safe and Fully Mechanised Installation of High-Tensile Chain-Link Mesh for Underground SupportBy V Louchnikov
Ever increasing depth of mineral extraction presents a challenging environment for hard rock underground mines. High in situ stresses and associated seismicity with potential rock burst hazards are th
Mar 21, 2011
-
An Evolving Understanding of the Controls of the Trident Gold Deposit, Higginsville, Western AustraliaBy C F. Stokes
The Trident Gold Deposit has been successfully developed by Alacer Gold (formerly Avoca Resources Limited) into a 1.3 Mt/a operation in the space of four years from discovery to first gold pour (2008)
Aug 22, 2011
-
Rock Fall Protection Barrier at Mill Area of PT Freeport Indonesia - ABSTRACT ONLYThe mill area of PT Freeport Indonesia is located in a valley surrounded by steep natural slope, characterised by extreme topography with mountains rising to above 4500 m within 100 km from the seasho
Nov 25, 2010
-
Design and Construction for the Widening of the M2 Norfolk Twin TunnelsBy A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys
The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o
Sep 17, 2014
-
Relationship of Joint Orientation with Hole Spacing Parameter in Multihole BlastingBy Badal R
Rock Discontinuities ("joints") affect blasting results. An investigation was carried out to understand if blast parameter such as spacing needs to be altered with the change in joint direction. Sma
Jan 1, 1990
-
Integrated Planning, Mining and Rehabilitation for Effective Results and Sustainable Land Use - A Western United States PerspectiveBy V Pfannenstiel
The United States (US) coal mining industry has been working under comprehensive planning, operating and rehabilitation regulatory requirements for nearly 35 years. The public desire for environmental
Jul 10, 2012
-
Defying Gravity – Brownfield Continuous ImprovementBy J Robinson, L D’Uva
"The Gold Fields group and Gekko Systems have successfully worked together on multiple projects, including at the St Ives, Agnew and Granny Smith operations in Western Australia, and the Damang operat
Oct 10, 2016
-
Local Resource Development Initiative - Developing a New Project Sustainability Model (Ambatovy Project Case Study)By S Novak
A world-class example of sustainable development in practice, the Local Resource Development Initiative (LRDI) grew from agreements between the Ambatovy nickel mine developers and the Government of Ma
Jan 1, 2009
-
Special Development of KHD in Communition TechnologyThe winning and upgrading of mineral raw materials necessarily includes size reduction, which serves the liberation and production of marketable products from highly valuable and bulk materials. Fo
Jan 1, 1993
-
Mine Closure Guidelines for Western Australia and Consultation ProcessBy X T. Nguyen
Western AustraliaÆs Mining Act 1978 was amended in 2010 to provide for the requirement of a mine closure plan to be submitted to the Department of Mines and Petroleum (DMP) for approval, as part of a
Jul 10, 2012
-
The Influence of Textural Variation and Gangue Mineralogy on Recovery of Copper by Flotation from Porphyry Ore - A ReviewBy A F. Cropp, D J. Bradshaw, W R. Goodall
Mineralogy and critically the texture of both the ore and gangue phases are of paramount importance in the flotation recovery of copper from porphyry ores. Mineralogy and texture will define the theor
Sep 29, 2013
-
Production and selective chloride leaching of McArthur River semi-bulk concentratesBy Yigit E, Royston D, Winborne DA
Semi-bulk concentrates of 45% zinc at 80% recovery have been produced from the McArthur River mineral deposit. Selective leaching of these concentrates to recover lead and a commercial grade zinc
Jan 1, 1986
-
Predicting Finished Product Properties in the Mining Industry from Pre-Extraction DataBy J E. Everett
An essential requirement of product quality control in the mining industry is to be able to reliably predict key quality properties of finished product from the data available before the extraction of
Sep 5, 2011
-
Jaguar Base Metals Project Case Study – Has Reality Reflected the Study?By R Jacobs
"The Jaguar project is relatively unique in that it was evaluated, financed, built and operated to completion within the last ten years, providing the opportunity to holistically review and reconcile
Mar 8, 2016
-
Managing steep seam dips and floor shears related dragline bench and lowwall instabilitiesBy J Li, J Regan, D Payne
The Caval Ridge Mine is an open cut coalmine and located within the Bowen Basin region in Central Queensland, and commenced mining and processing operations in 2014. A number of geotechnical challenge
Nov 29, 2022
-
Impacts of thrust faulting at Goonyella Riverside MineBy H S. Pescini
A material aim when feeding ore blends into a processing facility is to reduce the variability of the properties of the feed material and to maximise the output, or throughput. At the Mining Geology c
Mar 22, 2022
-
Forecasting mine seismicity – towards a more established methodologyBy A Vakili, F Harvey, H Greaves
Mine seismicity is one of the most difficult geotechnical risks to manage in seismically active mines. There are currently some established empirical and statistical methods that provide quantitative
Nov 30, 2018