Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Upgrade of the Ore Haulage Facilities at Z.C. Mines, Broken Hill

    A Feasibility Study to determine the future of ZC Mines was completed in mid 1987. Early in this study, which lasted two years, it was identified that significant reductions in treatment costs would r

    Jan 1, 1988

  • AUSIMM
    How innovation trumps isolation, one mine at a time

    By J Pearce, R Ramanathan

    hortly after the World Health Organization declared COVID-19 a pandemic, the words ‘social distancing’ entered the global lexicon. The effects on the public of social distancing, lockdowns and travel

    Jun 22, 2022

  • AUSIMM
    Near field blast vibration monitoring for slot or winze blast analysis

    By E Wargem

    The optimum mining of an orebody in an underground mining operation is fundamental to the mine’s ability to operate both sustainably and efficiently. The effective mining of an open stope or a cave is

    Mar 29, 2023

  • AUSIMM
    Fluxing Requirements for Copper Smelting Slag

    Silica and limestone fluxing levels in copper smelting slags were studied. Copper concentrates with flux additions were smelted to matte (55.5 per cent Cu) and slag in a pilot scale submerged combusti

    Jan 1, 1985

  • AUSIMM
    Recent advances in understanding phosphorus in oxygen steelmaking

    By G Brooks

    The control of phosphorus in steelmaking is one of the famous challenges of pyrometallurgy. It is well established that highly basic slags, the presence of FeO in the slag and lower temperatures (less

    Jun 19, 2024

  • AUSIMM
    Paper No. 189. The Great Reefton Gold Belt.

    If a straight line should be drawn on the map (Fig 1) through the northern half of the South Island of New Zealand, from Mt. Domett in the north to Arthur's Pass in the south, and another line dr

    Jan 1, 1911

  • AUSIMM
    Will Firedamp Emission Stop Progress in Longwall Production?

    When lying over 200-250m depth, many seams and surrounding strata are gassy enough to create mining difficulties , particularly in highly productive longwalls as well as in their development headin

    Jan 1, 1988

  • AUSIMM
    Measurement and Prediction of PbO Activities in Industrial Lead Smelting Slags

    Pbo activities have been measured in conventional blast furnace and direct smelting type slags at 1200¦C. Much higher activity coefficients than previously measured have been obtained and attribut

    Jan 1, 1984

  • AUSIMM
    Development in Plant Practice for the Recovery of Gold in South Africa

    The introduction of new technology into thegold-mining industry has been encouraged in recent years by increases in the price of gold andthe necessity for costs to be contained.At most new gold mines,

    Jan 1, 1984

  • AUSIMM
    Material handling testing and control system requirements for dry stack tailings

    By R Stefansen, T Wisdom, A Nicholson, K Rahal

    The challenges of increasingly scarce water resources and the risk of dam failures has seen the mining industry turn to sustainable tailings management solutions such as dewatering and dry stacking. F

    Jul 23, 2018

  • AUSIMM
    Cover System Performance Monitoring for Tailings – Are We Doing It Correctly?

    By R Barritt, P Scott

    Across the globe, it is a common scenario that tailings storage facilities (TSFs) are being decommissioned; however, their subsequent impact on the local environment and landscape can often be overloo

    Jul 27, 2015

  • AUSIMM
    Tectonic Setting of Stratiform Ore Deposits Buried in Sedimentary Cover of the Pacific Ocean (eece31d4-d7c8-4f9f-bcdd-cfd6e05da18c)

    Five types of mineral resource were known in the sedimentary cover of the oceans and seas floors prior to the 1980's :1) hydrocarbon fields including some very large zones of oil and gas accumul

    Jan 1, 1995

  • AUSIMM
    Traceability of native seed for mine rehabilitation

    By A Grant, H Thomas, C Clarke, B Fuller

    Native seed and plants are often a core input into the rehabilitation process of mine closure. Native plant establishment rate and performance is a function of many input elements including seed quali

    Aug 2, 2023

  • AUSIMM
    Application of Block Caving System in the Tongkuangyu Copper Mine

    By Song Yongxue

    During the design and operation stages of a block caving project, a large amount of research and development work has been undertaken in the Tongkuangyu Copper Mine. This paper presents the research a

    Jan 1, 2000

  • AUSIMM
    Plate Tectonics and the Precambrian-Phanerozoic Evolution of Australia (4c13f387-6abd-4480-92ff-9b1043445f21)

    Australian continental crust has accreted and consolidated by thirds: 1/3 during Archean time, 1/3 during Early to mid- Proterozoic time, and 1/3 during latest Precambrian to mostly Paleozoic time. Th

    Jan 1, 1995

  • AUSIMM
    Exploration of the Porgera Gold Deposit

    The Porgera gold deposit in the Papua New Guinea highlands contains about 387 tonnes of gold. The results of its exploration show the benefits of persistence and commitment to this difficult depos

    Jan 1, 1987

  • AUSIMM
    Revenue Maximisation of Base Metal Mines

    By Walton M. C

    A combination of flotation and smelting technologies is proposed as a cost-effective means to maximise the revenue of base metal operations. The proposed treatment route breaks the grade - recovery

    Jan 1, 1992

  • AUSIMM
    Creating optimised drill programs that add real value, and integrate with mine planning

    By N Anderson

    With traditional grade control processes, geological models are created by geologists at the completion of the data collection stage and wireframe construction is closed off at a set date to allow for

    Mar 22, 2022

  • AUSIMM
    Impact of Blast Fragmentation on Hydraulic Excavator Dig Time

    By D Thornton, R Hodson, D Sprott

    Blast fragmentation size distribution and thus blast design have been found to have a direct impact on the load and haul cycle through excavator dig time and bucket payload. Previous studies have demo

    Jan 1, 2003

  • AUSIMM
    Resource Estimation and Three-Dimensional Modelling of Gold Mineralisation at Mt Leyshon Gold Mine, NE Queensland

    Geostatistical analysis, resource estimation and three-dimensional modelling of the gold grade distribution was undertaken using exploration drillhole data taken from the Mt Leyshon gold mine. The mai

    Jan 1, 1993