Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Burden, Spacing and Borehole Diameter at Rock Blasting

    Most text books on rock blasting claim that the relationship between burden and borehole diameter is linear. The statistical calculation presented here with real values from one hundred open pit and

    Jan 1, 1990

  • AUSIMM
    Assessment of Ground Conditions for Pre-Stripping with Bucket Wheel Excavator

    By Ellery B. I

    Field investigations recently undertaken by Utah Development Company (U.D.C.) have been developed to allow the assessment of ground conditions relevant to the use of large bucket wheel excavators f

    Jan 1, 1981

  • AUSIMM
    Optimisation of Electrowinning Operations at Girilambone Copper Mine

    By Braaksma M, Dudley K

    The Girilambone Copper Mine is located in central New South Wales and has been operational since May 1993. Girilambone is operated by the Girilambone Copper Company (GCC) which is a joint venture b

    Jan 1, 1996

  • AUSIMM
    Practical Sampling for Online Analysis and Composite Samples of Slurries - The Art of Compromises

    In practice a sampling solution is a compromise of many requirements: the sample should be representative; the sampling system should also be reliable, less than 95 per cent availability rest

    Mar 1, 2010

  • AUSIMM
    KR process-production of hot metal on the basis of non-coking coal

    By Kepplinger W

    The KR Process is a joint development by VOEST-ALPINE, Austria and its subsidiary company KORF ENGINEERING, Germany. This new technology allows production of hot metal on the basis of non-coking

    Jan 1, 1986

  • AUSIMM
    Improving the Reliability of Stream Diversion Designs in Mine Closure Plans Using a Morphological Tool

    By S Tjerry, S Szylkarski, B Willis-Jones, I Dubinski

    Achieving relinquishment of mining sites is becoming increasingly difficult, with a study by Byrne (2013) estimating that out of a set of 73 mining and metals sites around the world, less than ten per

    Jun 28, 2016

  • AUSIMM
    The Implementation of FloatStar Grade-Recovery Optimisation Control Solutions using Blue Cube Online Grade Analysers on Industrial Flotation Circuits

    By D Phillpotts, S M. Mantsho, P Strobos

    A challenge on many industrial flotation circuits is controlling concentrate mineral grades using measurements that are provided infrequently. The mineral grades in concentrate streams are a critical

    Oct 29, 2012

  • AUSIMM
    The Economic Impact of Artificial Support in Open Pit Mines

    By Fuller P. G, Dugan K. J

    Artificial support can be used to improve wall stability in open pit mines. This is examined for a particular case where the factor of safety for a slope is kept constant by using artificial support

    Jan 1, 1989

  • AUSIMM
    Effect of Tectonic Stress on the Stability of Slopes

    By Wu Y. H, Lu J. P

    Slope stability has now become a practical tool in the design and oper- ation of open pits. The stability of rock slope depends on many factors, including not only structural geology, the existence o

    Jan 1, 1989

  • AUSIMM
    The Resistance of Cyclone Underflow Material to Flow Liquefaction

    By J Boshoff, D Reid

    It has been recognised worldwide that the liquefaction risk of unconstrained tailings stacks or cyclone underflow embankments requires careful consideration. The stability of a tailings deposit where

    Jul 27, 2015

  • AUSIMM
    A new approach to logging and modelling faults at the Dugald River Pb-Zn-Ag deposit, North West Queensland

    By K George

    The Dugald River lead-zinc-silver deposit is located approximately 60 km north-west of Cloncurry and 87 km north-east of Mount Isa. The development project is expected to turn operational in 2018. The

    Sep 20, 2017

  • AUSIMM
    The Economic Feasibility of Recirculation in Underground Mines

    By Gostylla W

    The economic feasibility of controlled district cross-cut recirculation is examined in this paper with particular reference to the most important mine ventilation network parameters. An algorithm i

    Jan 1, 1988

  • AUSIMM
    Bleg: A Geochemical Tool in the Great Sandy Desert

    The BLEG (Bulk Leach Extractable Gold) technique is a semiquantitative measure of cyanide extractable gold contained in a sample. A 5kg sample is leached in cyanide solution for 24 hours and gold

    Jan 1, 1988

  • AUSIMM
    Trigger Release Mechanism for Release of Mine Water to Magela Creek

    By McGill RA

    The Ranger Uranium Mine is surrounded by a World Heritage National Park. The strict environmental controls under which the mine operates are based on scientific and social requirements. Release of n

    Jan 1, 1988

  • AUSIMM
    Making use of potentially contaminating mine waste in cover design

    By N Jamson, T K. Rohde

    The Mine is an underground zinc (Zn), lead (Pb) and silver (Ag) operation in central New South Wales (NSW). Broadly speaking the Mine has two domains that require rehabilitation, the mine industrial a

    Jul 23, 2018

  • AUSIMM
    Quantification of surface sensor representivity of primary crushed ore for bulk ore sorting

    By J Rutter, D Francois-Bongarcon, M Federov, N Odiar, M Scott

    There are two fundamental methods for metalliferous sensing of primary crushed ore available for deployment at operations. These methods can be classed as surface measurement techniques (including XRF

    Nov 10, 2020

  • AUSIMM
    Should the Blast Exclusion Zone Be Based on a Qualitative or Quantitative Analysis? A Practical Implementation Conundrum

    By K Muller, T Oosthuizen

    Blast exclusion zones are instrumental in protecting equipment and personnel. When there is no constraint in footprint, the exclusion zone can be enormous, practically eliminating the hazard of flyroc

    Aug 24, 2015

  • AUSIMM
    The risk management and cost benefits of using a total monitoring approach to managing slope instability hazards in open pit mines

    By C Jacobsen, N Harries

    Assessing and managing instability hazards is an essential activity when working with unstable natural slopes and excavated open pit mining slopes. Slope monitoring has become the standard technique f

    Nov 29, 2022

  • AUSIMM
    Improving compliance in mining through an effective geoscientific information management framework

    By S Mundell, A Atkins, S van de Water

    Geoscientific information management enables the capture, management and delivery of the original geoscientific observations and measurements of the earth’s natural resources. However, original observ

    Nov 8, 2021

  • AUSIMM
    An Expiremental Investigation on Cable Reinforcement

    By Fabjanczyk MW, Aziz NI, Hii J

    The paper presents the results of a series of pull out tests performed on roof reinforcement systems currently being adopted in mines in Australia 7mm wire, dividag bar, 15.2mm strand cable, and b

    Jan 1, 1986