Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Evaluation of the Ernest Henry Cu-Au Deposit Mineral Resources

    By A J. Ryan

    The Ernest Henry copper-gold Mineral Resource is the major asset heldby Ernest Henry Mining Pty Ltd, comprising A$6.4 billion of containedmetal. The case history presented below describing the evoluti

    Jan 1, 1998

  • AUSIMM
    The emerging role of the operational geotechnical engineer

    By C G. Sweeney

    The underground mining industry is seeing unprecedented shortages in skilled labour. Migration to Australia being at an all-time low is a leading concern, with pandemic-induced border closures and loc

    Nov 29, 2022

  • AUSIMM
    Preliminary Design for the Rockwater Power Project, South Island, New Zealand

    By H Asche

    The proposed Rockwater Power Project is a hydropower development on the Waitaki River in the South Island of New Zealand. The proposed development will have an installed capacity of 250 MW with a peak

    Mar 8, 2011

  • AUSIMM
    The Shape of Hard Rock Mining in the 21st Century

    By McMahon DW, Schapper MA

    Hard rock underground mining has been wedded to the drill-blast method of breaking rock. Current practice and technology have focused on greater efficiencies in the blasting and handling of ore, on th

    Jan 1, 1985

  • AUSIMM
    The Application of SimulationTechnology to Enchance Operator Performance

    By Morrison RD, Peberdy NJ

    Simulator training provides a cost effective method of training operators in both the process and control aspects of a metallurgical plant. The components and requirements of a training simulator ar

    Jan 1, 1991

  • AUSIMM
    Planning for the Future – Development of Beneficial End Use from a Quarry Pit Lake, Victoria, Australia

    By C D. McCullough, M Gerner

    Rarely do opportunities arise allowing closure of a mine site to be planned as a key beneficial land use asset within a new urban growth area; particularly so well prior to cessation of mining.Pit lak

    Jul 16, 2014

  • AUSIMM
    Computerised Geological Information for Mine Planning at Mt ISA Mine

    Copper grades of diamond drill hole and development samples are determined in the core shed logging area at Mount Isa Mine using a Bulk Mineral Analyser. All geological and grade data on the copper or

    Jan 1, 1985

  • AUSIMM
    Bakelite Press for Mounting Mineral Grains and Ores

    Bakelite is fairly widely known as a suitable material for the mounting of ore specimens, concentrates and tailings for microscopical study, but has not as yet had extensive application. It is the mos

    Jan 1, 1933

  • AUSIMM
    The Design and Development of a Laboratory Scale Solvent Extraction Apparatus

    By Brady KT, Pattenden G

    A laboratory size solvent extraction apparatus has been constructed, which incorp- orates three stages of countercurrent extraction, followed by two stages of counter- current stripping. The model u

    Jan 1, 1984

  • AUSIMM
    Implementation of the BIOX® process at the Runruno Gold project

    By J A. van Niekerk, J G. Jardine, J W. Olivier

    The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-

    Sep 11, 2017

  • AUSIMM
    Continuity Risk in Narrow Reef Gold Deposits - Implications for Evaluation and Exploitation

    By I M. Platten

    Narrow reef gold deposits are generally less than 4 m in width and relatively complex geological phenomena. They often display variable geometry, attitude, continuity and internal architecture. Econom

    Jan 1, 2008

  • AUSIMM
    Novel Agglomeration Technology

    A form of wet pelletization is described where the bridging of the individual particles is achieved by a second liquid phase that pref- erentially wets the suspended solid particles. The phenomenon

    Jan 1, 1974

  • AUSIMM
    Geostatistical Analysis Of 18cc Stope Blcok, C.S.A. Mine, Cobar, N.S.W.

    By Leach B. G

    A geostatistical study was made of diamond drill hole intersections within 18CC stope block at the C.S.A. Mine, Cobar, N.S.W. The stope block is located in 18CC orebody which is a massive sulphide

    Jan 1, 1979

  • AUSIMM
    Transition of the Ernest Henry Mine from Open Pit to an Underground Sublevel Cave

    By J B Tucker, A T. McGrath

    Situated in north-west Queensland, Australia, the Ernest Henry Mine (EHM) has been producing copper and gold since 1996. Owned and operated by Glencore Xstrata, ore is currently sourced from a newly d

    Mar 24, 2014

  • AUSIMM
    New Methods for the Control of Autogenous Grinding Circuit

    By Jamsa-Jouneia SL, Lahteenmaki S

    Sophisticated control systems require sufficient and reliable information from the process to be controlled. At the Pyhasalmi concentrator two novel measurements, a particle size indicator (PSI) and

    Jan 1, 1993

  • AUSIMM
    Blasting Approaches to Increase Mine Productivity and Reduce Greenhouse Gas Emissions in Surface Coal Mining

    By T Goswami, G Brent

    In response to concerns over greenhouse gas (GHG) emissions and an imposed cost in some jurisdictions, many mining houses have committed to reductions in their GHG emissions. However, mining faces par

    Aug 24, 2015

  • AUSIMM
    Quantitative Risk Assessment Tools to Assist with Waste Management and Placement Guidelines

    By S Lehane, S Pearce

    The characterisation and assessment of waste rock has been the subject of considerable research, and many guidance documents have been published both internationally and within Australia. While these

    Jul 27, 2015

  • AUSIMM
    An Occupational Health and Safety Perspective on the Water Systems in Mining

    By J Field

    Many aspects of water use in mining are driven by the technical requirements for water. There has been little consideration given to both the safety and the health requirements. Workers in the mining

    Jan 1, 2006

  • AUSIMM
    Identify, Convert and Sustain – Resource Development in the Pilbara – The Rio Tinto Way

    By G Danckert

    The key technical theme of ‘orebody knowledge’ has been applied by Rio Tinto in the Pilbara iron ore precinct from 1966, when operations first started there. It forms the basis of present day applicat

    Jul 11, 2011

  • AUSIMM
    Towards the Implementation of Discrete Fracture Network Modelling as a Geotechnical Design Tool – Case Study of Callie Underground Mine

    By S F. Rogers, K Doumis, J H. Graaf, B J. Barsanti

    Advances in technology now allow geotechnical practitioners to better describe the properties and variability of a rock mass through advances in surface and underground mapping, borehole technology an

    Nov 5, 2014