Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Metallurgical test work – between a rock and a hard place

    By K Fiedler, A Newell, P D. Munro

    Test work is the foundation upon which the success of projects and subsequent operations is laid, reflected in Professor Arthur Taggart’s pithy observation: ‘Make your mistakes on the small scale and

    Aug 29, 2018

  • AUSIMM
    The Effect of Weak Acid Dissociable Cyanide on Gold and Silver Flotation in Hidden Valley Mine

    By Y Peng, B Guo

    In gold processing plants, the water from the cyanidation stages is treated to detoxify cyanide species and this recycle water becomes the main part of the process water. Despite the low concentration

    Sep 26, 2013

  • AUSIMM
    Development and Testing of a Small-Scale Uranium Leach for Geometallurgical Applications

    By N L. Turner, K Ehrig, V Liebezeit, D J. Robinson, L L. Kuhar, N Francis

    Conventional industry tests used to determine leach recoveries are often fully monitored and may be time-consuming and expensive. Such tests may be limiting in geometallurgical applications where larg

    Sep 29, 2013

  • AUSIMM
    Improving Consistency of Delivery at Mt Rawdon Operation

    By M Boon, M Franklin

    This paper outlines the journey of cultural maturation and management system development at the Mt Rawdon (MRO) gold mine from its acquisition by Evolution Mining Limited (Evolution) in late 2011 to 2

    Jun 22, 2016

  • AUSIMM
    Superior Productivity and Margins Using Modern Mining Management Systems

    With commodities suffering dramatically low real prices, mining business margins are under intense scrutiny. Unfortunately, management systems developed early this century for manufacturing are drivin

    Jan 1, 1999

  • AUSIMM
    Applying Modern Heuristics to Maximising Net Present Value through Cut-off Grade Optimisation

    By C A. Myburgh, S Craig, K Deb

    In focusing on open pit mine scheduling, one of the biggest areas that a mining engineer can add value is in the area of cut-off grade optimisation. It is not atypical to add up to an extra 20 per cen

    Nov 24, 2014

  • AUSIMM
    Mining Geophysical Methods for the 21st Century

    To help meet the challenge of mine finding at the start of the 21st century, the exploration geophysicist will have at his command a powerful range of tools, some new, some improved, and some whic

    Jan 1, 1986

  • AUSIMM
    The Pima II: A New Technique for Field-based Alteration Mapping

    By Cocks T

    The 15-year long debate between the industry, Government and Aboriginal people about the rights and wrongs of Land Rights, the right of Aboriginal people to control development on their land and the

    Jan 1, 1994

  • AUSIMM
    Venturi Scrubber System for Dust Control on a Longwall Face

    By Rao S. B, Baafi E. Y

    A venturi based multi-scrubber air cleaning system has been developed for dust control along a longwall face in coal mines. The system consists of a number of scrubbers. strategically placed along the

    Jan 1, 1995

  • AUSIMM
    A Managed Approach to Project Insurance

    Historically the insurance industryÆs involvement in any project has been relatively late in the process. Often it was a case of the last item to be ticked off the checklist has been to ensure that th

    Jan 1, 2007

  • AUSIMM
    The Electronic Delay Detonator Trial at KCGM Mount Charlotte Operation

    By D Caffrey

    To demonstrate the advantages of using electronic delay detonators over pyrotechnic detonators, a trial using the DNES Dynatronic System was conducted at the KCGM Mount Charlotte operation in 1998. Th

    Jan 1, 1999

  • AUSIMM
    Bentonite and Fuller's Earth Deposits of New South Wales: I. Occurrence, Mineralogy and Physical Properties

    By See G. T

    Bentonites and fuller's earths from seven localities in N.S.W. have been analysed with respect to occurrence, mineralogy and physical properties and areas for future prospecting have been indicat

    Jan 1, 1959

  • AUSIMM
    Design of Air-Blast Plugs for a Sublevel Caving Operation

    The Telfer Underground sublevel cave (SLC) Operation is located approximately 850 m below surface. The cave was designed to propagate through an old decline which was initially used to monitor the cav

    Nov 25, 2010

  • AUSIMM
    Exploring the Use of Fibre Reinforced Shotcrete in Large Diameter Shafts

    By D J. Kilkenny, D A. O’Toole, P B. Hills, K L. Seah

    An investigation was undertaken to critically analyse the use of fibre reinforced shotcrete (FRS) for a variety of applications in large diameter shafts. Those applications included the use of FRS wit

    Nov 5, 2014

  • AUSIMM
    The Use of Unique Admixture Technologies in Mine Backfill-Technology Description and Case Histories (037359e3-5adb-49ba-a78e-a0ed2db408e1)

    By Karlson R, Rispin M

    Chemical admixtures are not commonly included in the variety of backfill mixes used in the mining industry. This may be attributed to several reasons including, but not limited to: the perceived hig

    Jan 1, 1998

  • AUSIMM
    Phanerozoic Ooidal Ironstone Deposits - Generation of Potential Exploration Targets

    By E R. Ramanaidou, M Wells

    The aim of this paper is to summarise all known Phanerozoic ooidal ironstone deposits worldwide, including Australian deposits such as the well-known channel iron deposits (CID). Nearly 400 occurrence

    Jan 1, 2009

  • AUSIMM
    The Modernisation and Upgradeáof Concentrator Operations at the Chelopech Mine, Bulgaria - Design, Installation and Operation of the 250 tonnes per hour Comminution Circuit

    By K Evtiminova, G Jobson, M Nolte, S Meik

    Chelopech Mining EAD (CMEAD) is a wholly owned subsidiary of Dundee Precious Metals Inc (DPM) and operates the Chelopech underground mine and processing facility located in Bulgaria. The final product

    Oct 29, 2012

  • AUSIMM
    Tailings regulation – a South Australian perspective

    By G B. Smith, G M. Marshall, A Querzoli

    The South Australian mining regulatory framework has adopted a performance based approach to the management of risk. This approach has been in place in South Australia for more than 10 years and is in

    Jul 23, 2018

  • AUSIMM
    Why is the Mineral Processing Field Behind in the Application of New Technology?

    Mineral processing is at the hub of the exploration-mining-metals production system. Because of the large volumes of material processed, incremental technology investments can pay off better than fo

    Jan 1, 1993

  • AUSIMM
    The Practical Implementation of Dewatering and Depressurisation in Large Open Pits

    All large open pits in Australia have been mined, or are planned to be mined well below the local water table. This raises several issues that impact on mine safety, mining costs and regulatory approv

    Jan 1, 2003