Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Contribution of Air-Deck Blasting to Open Pit Mining EconomicsBy T Laing, M A. Abdalla, P Hagan
Open pit operators are facing a number of challenges in the area of blasting and blasting processes, such as wall control, quality of fragmentation, explosives consumption and vibration. Remaining fin
Sep 18, 2012
-
Profitability, Sustainability and Community Development - Is There a Contradiction? A Case of Gold Fields' Driefontein Gold Mine in South AfricaSince the days of Adam Smith and Milton Friedman the discussion of corporate citizenship and sustainability has been flooded with multiple contradictions, with proponents of sustainability saying that
Jan 1, 2009
-
Simcoa's Continuous Drive Towards a Quality Organisation Through its Quality Leadership ProcessBy Brosnan J. G
Simcoa Operations is the only silicon smelter in the region and since the plant was commissioned in late-1989, has progressed from supplying silicon metal to the secondary aluminium market to the cu
Jan 1, 1995
-
Estimation of Flyrock Travel Distances: A Probabilistic ApproachBy M F. L Gibson
The issue of flyrock is very important in the operation of all mineral extraction sites that use blasting. Unlike the other environmental effects of blasting, ground vibrations and air overpressure, f
Jan 1, 2001
-
An Analysis of the Mixing of Air and Methane in the Stream Produced by the Mine Injector Station - Presenting Preliminary Results of Measurements and ModellingBy J Janus, J Krawczyk
Local accumulation of methane in workings of a longwall is one of the most common causes of mining accidents. This gas has many sources: it may leak from goaf through permeable sealings, or through ga
Jul 1, 2013
-
Maintaining the Benefit - How to Ensure Mine to Mill Continues to Work for YouBy D La Rosa, W Valery, A Jankovic, S Ese
Metso Minerals Process Technology Asia-Pacific (MMPT-AP) has been working with many mining companies worldwide performing æMine to MillÆ or Process Integration and Optimisation (PIO) studies. MMPT-AP
Jan 1, 2007
-
A Review of Gold Deposits in the Archaean Greenstone Belts of Western AustraliaBy Ho SE, Neil Phillips G, Houstoun SM
There are numerous individual gold deposits in the Archaean greenstone belts of Western Australia, but only 26 have productions and/or quoted reserves in excess of 10 tonnes Au. Most gold producti
Jan 1, 1986
-
Optimising a Mineral Supply Chain under Uncertainty with Long-term Sales ContractsBy J Zhang, R Dimitrakopoulos
A two-stage stochastic mixed integer non-linear program is formulated for a mining complex to optimise strategic and tactical plans. The objective is to find the near optimal decisions for a mineral s
Nov 24, 2014
-
Modelling of height of connective fractures during longwall miningBy D Adhikary, M Khanal, B Poulsen, H Guo
During longwall mining, the ability to reliably estimate the height of longwall mining-induced fractures is critically important in order to effectively manage mining-induced water inflows and aquifer
Nov 30, 2018
-
Dating if Ore Deposits with High Precision: Examples from the Lachlan Fold Belt, NSW, AustraliaBy McDougall I, Claoue-Long J
A combination of high precision 40Ar/39Ar and U-Pb dating has been used to determine the age of hydrothermal minerals and host rocks in a number of Lachlan Fold Belt (LFB) gold deposits in New South W
Jan 1, 1990
-
Testing and modelling of diverse iron ore slurries for pipeline friction and pump head derateBy V Matousek, A Sellgren, R Visintainer, G McCall
A 4-component model for settling slurry pipe flow has been previously described by Wilson et al (2006) and Sellgren et al (2014) to predict pipeline friction loss (hydraulic pressure gradient) over a
Nov 8, 2021
-
Safety at home – this is where mine safety startsBy K Biegaj
During the author’s 25+ year career in mine management in various parts of the world (mostly in Australia), the author has been privileged to live and work in mining towns (not FIFO) for more than 20
May 5, 2022
-
High-Resolution Pit Water Quality Model for the Highway Reward Mine, Queensland, AustraliaBy B G. Lottermoser
Field and laboratory data combined with computational modelling have been used to predict the pit water quality for the Highway Reward mine. Open pit mining of the Highway Reward copper-gold deposit h
Jan 1, 2003
-
Use of Paste for Tailings DisposalBy J Shillabeer
Paste backfill has been adopted by many underground mines in North America and a growing number elsewhere. Paste offers a number of advantages. This paper suggests wider applications of paste technolo
Jan 1, 1998
-
Calibration and Testing of a Geometallurgical Leaching Protocol for Determining Copper Mineralogical DeportmentBy N L. Turner, D J. Robinson, A J. McFarlane, N M. Chapman, L L. Kuhar, R L. Meakin, R Martin
A number of geometallurgical tests have been developed within the AMIRA P843A Geometallurgical Mapping and Mine Modelling (GeMIII) project, an interdisciplinary collaborative research project involvin
Sep 29, 2013
-
What is the Oxygen Depletion Potential of ?Water Vapour?By M A. Tuck
Atmospheric air on a moisture free volume basis consists of approximately 21 per cent oxygen. The current minimum threshold for oxygen in Australia is 19.5 per cent. Atmospheric air generally will als
Aug 31, 2015
-
Tunnel Procurement Process ù Management Issues and Risk Mitigation ù æGetting it Right from the Beginning - Policy, Management, Procurement, Risk Evaluation and Decision Methodologies for Optimal ResultsÆBy T Isaksson, J Anderson
The procurement process for underground construction contracts, in particular those contacts involving tunnel boring machines (TBMs), is subject to many complex and inter-related variables, including
Jan 1, 1999
-
21st century relining – the path to greater mine site profitabilityBy P Rubie, J Russell
This paper looks at the past, present and not too distant future of grinding mill relining.Since the adoption of autogenous grinding (AG) mills and semi-autogenous grinding (SAG) mills as the primary
Aug 29, 2018
-
Post-mining Land Use Options in the Appalachian Coal Mining Region of the USABy J Skousen, C E. Zipper
"Prior to the 1950s in the USA, surface coalmines were generally left without any reclamation. As government regulations advanced, mine operators were required to backfill the area and plant grasses o
Jul 16, 2014
-
Groundwater at the Underground Coal Gasification Site at Chinchilla, AustraliaBy S Fidler
Underground coal gasification (UCG) is a process by which coal is converted in situ to a combustible gas that can be used as a fuel or chemical feedstock. The process has been used in commercial-size
Jan 1, 2003