Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Effect of solid particle size on the viscosity of a secondary copper smelting slagBy A Van den Bulck, K Verbeken, O Vergote, I Bellemans
Viscosity is one of the most important physicochemical properties during pyrometallurgical operations. In the sub-liquidus regime, an important factor is the presence of suspended solid particles, yet
Aug 21, 2024
-
Fingerprinting and Signatures - Tracing Mine Impacts in Complex Aquatic SystemsBy C Bonini, A Markham, P Whittle, B Pearson
"Mine-derived sedimentation in rivers can have significant impacts on the processes and features of the receiving environment and impact on communities reliant on this environment. However, identifyin
Nov 26, 2013
-
Improved Flotation Process Control at Newcrest's Telfer OperationBy S Hille, J Karageorgos
With the increased variability of todayÆs large-scale mining operations, consistent flotation performance is important to improving and sustaining overall recovery through the circuit. The Newcrest Te
Jan 1, 2007
-
Rock Bolts for Permanent Tunnel LiningBy J de Witte
When used in suitable ground conditions, rock bolts can have advantages over other permanent tunnel lining solutions. Permanent rock bolts offer flexibility in tunnelling profile and rapid rock bolt i
Mar 8, 2011
-
Competing Factors in Support Selection for the West Zone of the Beaconsfield Gold Mine, TasmaniaBy P Fuller, A R. Penney
Re-commencement of mining in the Western Zone of Beaconsfield Gold Mine following a seismically-induced rockfall fatality in April 2006 required a change of mining method involving drilling and blasti
Jan 1, 2008
-
"Comprehensive Mineralogical Characterisation at the Cerro Corona Cu-Au Porphyry Mine – the Fundamental Key for Geometallurgical Applications"By P Gomez, R Baumgartner, G Escobar
"The Cerro Corona mine consists of a Cu-Au porphyry deposit located in the Andes of northern Peru. The deposit comprises a typical Cu-Au multiphase porphyry mineralisation that has been overprinted by
Jun 15, 2016
-
The Sams Creek Peralkaline Granite Hosted Gold Deposit, Northwest Nelson, New Zealand ù A New Variant on Alkaline Intrusion-Related Gold DepositsBy K Faure
At Sams Creek a peralkaline granite porphyry dyke hosts gold-bearing sulfide-quartz-siderite veins. The granite dyke intrudes Ordovician-Silurian metapelite and quartzite, and has thin lamprophyre dyk
Jan 1, 2004
-
Is a 2.5áper cent Success Rate Good Enough? Traditional Mine Development Methods have the Tail Wagging the DogBy J Jackson, D C. Curry, A C. Keith
Australian Bureau of Statistics (ABS) data shows that since 2006 the balance of capital costs associated with mine development has become weighted greater than 75 per cent to enabling infrastructure a
Sep 29, 2013
-
Orebodies in the Mt. Charlotte-Hannan's North Area, KalgoorlieOrebodies in the Mt. Charlotte-Hannan's North area N. and E. of the town of Kalgoorlie provide a marked contrast to the pyritetelluride lodes of the Golden Mile, although both groups of orebodies
Jan 1, 1965
-
Not for the Faint-HeartedBy J Whittle
This paper describes what is involved in carrying out a comprehensive optimisation of a long-term operating schedule for a mining complex. It details the data that must be assembled and discusses the
Nov 24, 2014
-
Blast Design Parameters and Their Impact on Rock FragmentationBy B Prasad, M P. Roy, P K. Singh, C Drebenstedt
Blasting operations play a pivotal role in the overall economics of opencast mines. The blasting subsystem affects all the other associated subsystems, ie loading, transport, crushing and milling oper
Aug 24, 2015
-
Gold-Rich Porphyry Copper Deposits of the Circum-Pacific Region - an Update OverviewGold-rich porphyry copper deposits areimportant sources of gold in the circum-Pacific region: 26 major deposits contain >7000 tonnes of gold. The deposits occur in a variety of subduction-related sett
Jan 1, 1990
-
An Open Pit Multistage Mine Production Scheduling Model for Drilling, Blasting and Excavating OperationsBy S Q. Liu, E Kozan
This paper proposes a new multiresource multistage scheduling problem for optimising the open pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is
Nov 24, 2014
-
Developing Assessment Methods and Remediation Protocols for New Zealand Sites Impacted by Acid Mine DrainageBy A Black, A de Jo, J Cavanagh, J Harding
Acidic and metal-rich waters have been discharging from Sullivan Mine, West Coast, New Zealand since the closure of the mine during the early- 1990s. This has resulted in a decrease in pH from a backg
Jan 1, 2003
-
Heterogeneity, Sampling Errors and the Nugget Effect in Gold Ores - Implications for Evaluation, Exploitation and ExtractionSampling errors result from heterogeneities within the lot under study. Within a rock mass in situ heterogeneity results in the geological nugget effect, which accounts for most of the natural variabi
Aug 1, 2010
-
Limnological Processes in the Development of Acid Pit LakesLimnological processes are often overlooked when trying to assess the long-term water quality of pit lakes. It is essential to deal with these aspects, since they determine the geochemical and redox c
Jan 1, 2003
-
Stacking And Reclaiming Facilities At The Thiess Bros. PTY. LTD., South Blackwater Coal Mine From Conception To Operation (51496ec7-c204-47bc-8733-52538534c7c3)By Hoskings R
Conceptual studies of the run of mine stockpiling and reclaiming requirements com- menced in 1975. Final selection of equipment was made in 1978 and the equipment was commissioned in June, 1979. Equ
Jan 1, 1980
-
Applying control frameworks to enhance vehicle interaction technology outcomesBy P Standish
Qualitative risk assessment methods are not well suited to considering complex systems and potential interactions of new technology. As part of supporting tier one mining organisations and internation
Jun 22, 2022
-
Effective Contracting Through PartneringBy Stewart R. D, Lawrence W, Youl M. J
The trend towards contracting by major coal mining companies such as BHP Coal and MIM Ltd is examined. Reasons why this trend is occurring are discussed and the concept of partnering is examined.
Jan 1, 1997
-
Considerations and Challenges in the Design and Construction of Tunnels for Remote Hydropower ProjectsBy A G. Noble
Tunnelling for hydro-electric power projects can be a very challenging component of the overall development. In contrast to urban transportation tunnelling where the logistics for access and supply of
Mar 8, 2011