Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Application of Computer Assisted Modelling to Final Wall Blast Design

    By Jones J. P, Arriagada J, Scherpenisse C. R

    A recently-developed model is used as a tool to optimise the design of blasts used to create final walls in large open pit mines. The use of this tool has allowed present blasting practice and propo

    Jan 1, 1995

  • AUSIMM
    Marine Recovery of Tunnel Boring Machine from Botany Bay

    By S Norman

    The Water Delivery Alliance (WDA) was established to design, construct and commission the pump station and desalinated water delivery pipeline to link the desalination plant on the Kurnell Peninsula (

    Mar 8, 2011

  • AUSIMM
    The Role of Cyanide in the Elution of Gold from Activated Carbon

    By Lorenzen L, Van Der P F

    It is the aim of this paper to review recent research in understanding the role of cyanide in the elution of gold. Under conditions of severe pre-treatment (high temperatures and levels of cyanide), t

    Jan 1, 1992

  • AUSIMM
    Iron Ore Grade Control for Flitch Mining – An Alternative Method for the Hope Downs Operation, Hamersley Province, Western Australia

    By A D. Caccioppoli

    Grade control systems within Rio Tinto Iron Ore have proven to be robust, when mining full benches. The Hope Downs 1 operation hosting two Marra Mamba Iron Formation deposits (North and South Deposits

    Aug 22, 2011

  • AUSIMM
    A Review of Prediction Methods for Ground-Borne Noise Due to Tunnel Construction Activities

    By D Davis

    The prediction of ground-borne noise levels from tunnel construction activities requires knowledge of the input vibration forces from the vibration source(s) into the cutting face, knowledge of the vi

    Mar 8, 2011

  • AUSIMM
    Environmental Blast Design and Effective Implementation

    By A B. Richards

    Effective control of blast vibration and flyrock requires that significant factors be identified and quantified, that the blast be designed to ensure both blasting efficiency and compliance with appli

    Jan 1, 2004

  • AUSIMM
    Quality Assurance Standards for Mine Ventilation Models and Ventilation Planning

    By D J. Brake

    Most mine ventilation engineers are involved in ventilation planning and design in some capacity. Ventilation modelling software used by a competent experienced ventilation engineer is extremely usefu

    Aug 31, 2015

  • AUSIMM
    Stratigraphic Reconstruction of the Porgera Region, Papua New Guinea.

    By Stewart R, Manson RA, Haig DW, Perembo RCB, Kruman B

    Since the advent of plate tectonic modelling, the Ramu-Markham valley has been thought the site of a classical island-arc/conti- nent collision zone. In this interpretation the units south of the Ma

    Jan 1, 1997

  • AUSIMM
    Operation at Blackwater Mine

    The Blackwater Coal Mine is a modern open cut operation using large draglines for over- :)urden removal and shovels, loaders and trucks to mine and haul coal to the crushing and coal ?reparation pla

    Jan 1, 1974

  • AUSIMM
    Effective Immersive Visualisation Systems for Mining Applications and Beyond

    By E Widzyk-Capehart, T Bednarz, O Daud, N Cutmore

    The interest of industry, in particular future mining, is pointing towards the use of novel visualisation systems to improve the operational efficiency of user interfaces. While the technologies used

    Nov 4, 2015

  • AUSIMM
    Explosive Volcanism on Bougainville Island: Ignimbrites, Calderas, and Volcanic Hazards

    By Johnson RW, Rogerson R

    New perceptions of the nature of volcanic hazards on Bougainville Island have resulted from a recent remapping of the geology of the island. Ignimbrites and calderas have been identified at six Quater

    Jan 1, 1990

  • AUSIMM
    Properties of Surface Films on Chalcopyrite and Pyrite and their Influence in Flotation

    By Chander S

    Properties of surface films on chalcopyrite and pyrite differ due to variations in the mechanism of oxidation of the two minerals. In the case of chalcopyrite the first step in the oxidation is the

    Jan 1, 1993

  • AUSIMM
    Pyrite depression at Boliden Tara using F-250 – a biopolymer

    By Y Peng, C Burns, Y Mu, R A. Lauten

    In both laboratory flotation experiments and from analysing the composition of the lead concentrate at the Boliden Tara lead-zinc mine in Ireland, it has been found that F-250 may replace cyanide as a

    Aug 29, 2018

  • AUSIMM
    Behaviour-based Safety with a Foreign-based Workforce

    By R Brown

    The Singapore Land Transport Authority Contract C917A is for the design, construction and completion of all outstanding works under the original Contract 917, including taking over the design and cons

    Sep 17, 2014

  • AUSIMM
    Surface-to-inseam (SIS) Drilling at Oaky Creek Coal Mine – SIS Design Aspects and Drilling Environment

    By E Corpuz, J Weissman, S Winter, R Evans

    The surface-to-inseam (SIS) directional drilling technique has been utilised at Oaky Creek Coal for more than a decade to predrain both the Oaky No 1 and Oaky North mining areas. The cumulative drilli

    Aug 31, 2015

  • AUSIMM
    Unlocking value in drill and blast at Olympic Dam – Lime 390 case study

    By P Vaikkattil, K Li, J Bullock

    Unlocking maximum value is essential when designing a stope and the associated drill and blast packets. This is becoming increasingly important at Olympic Dam as the operation continues to expand sout

    Mar 15, 2021

  • AUSIMM
    Iron Ore Holdings Ltd – Case Study of the Environmental Approval Challenges for an Emerging Junior

    By H Fletcher

    Iron Ore Holdings Ltd (IOH) is an emerging junior iron ore company that is actively developing projects in the Central and Western Pilbara region of Western Australia. IOH commissioned URS Australia P

    Jul 11, 2011

  • AUSIMM
    Effective Use of Mine Waste in the Design of a Residue Storage Facility, Pilbara Region, Western Australia

    By A Wanninayake, E Novello, I Gillani

    A residue storage facility (RSF) was designed to cater for Davidson Creek Area and Robertson Range Area operations under the FerrAus Pilbara iron ore development project in the Pilbara Region, Western

    Aug 12, 2013

  • AUSIMM
    Advances in Regolith Research ù A CRC LEME Perspective

    By R R. Anand

    Recent research by CRC LEME from an Australian mineral exploration perspective, has focussed on regolith architecture and mechanisms of geochemical anomaly formation, within transported regolith. Meth

    Jan 1, 2004

  • AUSIMM
    Optimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, Finland

    Optimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, Finland

    Sep 13, 2010