Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Strong Acid Leaching and Filtration of Lead/Silver ResidueBy Adams R. W
A commercial scale strong acid leaching plant was commissioned at the Risdon plant of the Electrolytic Zinc Company of Australasia Limited, a member of the Pasminco group of companies, in February
Jan 1, 1989
-
George Fisher Mine - Feasibility and ConstructionBy G S. B Karunatillake
Following a pre-feasibility study, Mount Isa Mines commenced a feasibility study on the deposit of the George Fisher Mine in May 1997. Board approval was granted in May 1998 to construct a 2.5 million
Jan 1, 2000
-
Preliminary Safety Analysis for the Connection of a Thermal Oxidiser to a Working Coal MineBy D Cork, R Peet
"Methane is a signifi cant greenhouse gas. Methane is released from coal seams during the mining process, both in surface and underground operations. This uncontrolled release is termed æfugitive emis
Jun 1, 2012
-
Development – Back to BasicsBy I T. Ross
In the last 50 years there have been tremendous improvements in equipment used in development on underground mines. Compressed air powered jacklegs have been replaced by high powered electro-hydraulic
Mar 24, 2014
-
Optimisation of cemented rock fill strength for open stope supportBy J Player, R de Vries, E Villaescusa, H Saw, R Hassell
The use of cemented rock fill (CRF) for support of open stope walls has increased in the Australian underground mines operations over the last five years due in part to its low capital cost. In open s
Oct 16, 2017
-
The effect of vane shear rotation speed on the estimation of tailings undrained strengthBy B Wentzinger, Y Keulemans
This paper presents the results of a field study designed to assess the impact of vane rotation speed on the estimated undrained strength for two Australian bauxite tailings storage facilities. The va
Jul 1, 2021
-
Integrated Expert Control System for Grinding and FlotationBy Jarvensivu M, Ylinen R, Jamsa-Jounela S-L
The paper presents a new integrated system for control of concentration processes. The system is based on cluster-based modelling taking the ore quality into account and a new on-line particle size
Jan 1, 1993
-
Application of RISKGATE to Coal Mine Tailings DamsBy M Gasparon, J Harris, T Baumgartl, D J. Williams, M Edraki, P A. Kirsch, D Rowe
RISKGATE, an Australian Coal Association Research Program-funded (ACARP) initiative, has been designed to assist the Australian coal mining industry in improving minimum standards for safety performan
Jul 16, 2014
-
Understanding Mineralisation Controls – A Case Study of the Chesney DepositBy J Channell, G Phillips
"The Chesney deposit, located 4 km south-east of Cobar consists of three copper-gold rich shoots that lie within a larger, copper dominant lode. A fourth gold rich shoot is located adjacent to the mai
Aug 18, 2014
-
Characterising Rock Mass Properties for Fragmentation ModellingBy A Scott, I Onederra
A great deal of technical and research effort has been applied to the development of models to predict fragmentation from rock blasting. A number of quite useful empirical or engineering models are cu
Aug 24, 2015
-
The Use of Ammonium Nitrate-Fuel Oil Blasting Agent at Great Boulder MineTo enable ammonium nitrate-fuel oil (AN-FO) to be used on an equal weight basis with nitroglycerine explosives, smaller diameter bore holes became necessary with consequent modifications to drill stee
Jan 1, 1965
-
Copper Scalping at ValeÆs Matte Separation PlantBy S Girard, L Rowland, V Lawson, Y Shields
Since 1948, ValeÆs Matte Separation Plant has been successfully using magnetic separation and froth flotation to separate the copper sulfide, nickel sulfide and Ni-Cu metallic alloy contained in Besse
Oct 29, 2012
-
Fine Coal Dewatering by Compaction in Bins Exhibiting Reliable DischargeThis paper firstly reviews the requirements for container and hopper design for reliable discharge. Discussion is then directed to the evaluation of the consolidation stresses acting in both in both t
Jan 1, 1998
-
Modelling multi-seam interactions for longwall miningBy A Lines
This paper addresses a gap in longwall multi-seam interactions and their predictions, providing a case study for future multi-seam operations for both anticipated conditions and a method for understan
Nov 30, 2018
-
Predictive Groundwater Solute-Transport Models and the Permitting Process for Mine Waste Facilities in Wisconsin, USA ù A Case Study From a Proposed Site Near CrandonBy D T. Feinstein, M B. Gotkowitz
In Wisconsin, state laws and regulations governing metallic mine permitting stipulate that protection of groundwater quality be assured indefinitely through all phases of the mining project, including
Jan 1, 2003
-
Quantifying economic and environmental impacts of preconcentrationBy E Amini, M Scott
Grade Engineering® involves the planning, integration and operation of coarse preconcentration techniques to reject uneconomic material as early as possible in the mining value chain to improve the qu
Nov 10, 2020
-
Copper Metallurgy and the SOx Problem in JapanAs a result of the rapid economic growth in Japan, environmental problems have become a national concern in the latter half of the In 1967, the Basic Lair for Environmental Pollution Control was en
Jan 1, 1980
-
Understanding What Constitutes the Mining Industry's 'Social Licence to Operate' in AustraliaSocietal expectations about how the industry operates and treats its people will be a key driver in the development of the Australian mining industry over the next 20 - 30 years (Moffat, Mason and Lit
Jun 1, 2010
-
Environmental Auditing as a Driver for Continuous Improvement in Environmental Performance (ede55e7e-c054-4fc6-ae90-dd762e66d692)Continuous improvement in environmental management assists in the achievement of sustainability goals for the mining and processing of minerals. The use of regular internal environmental audits (score
Jan 1, 2004
-
Risk management for minesite closure planning and execution – start now! Lessons from the closure of the Leigh Creek Coalfield, South AustraliaBy A Querzoli, B Williams
In late 2014 the Flinders Power Management Team was executing business improvement plans to ensure continued electricity generation until 2028 and beyond. Six months later, in June 2015, the Board ann
Jul 25, 2018