Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Comparison of Rebar and Spiral Bolts using Laboratory Pull-Out Tests

    This study is to compare reinforcement of rebar and spiral bolts using laboratory pull-out test. For this purpose, the pull-out test was performed in laboratory for a curing period of 7- and 28-days.

    Dec 6, 2010

  • AUSIMM
    How progressive waste rejection should transform your mining business

    By M Pyle, R Ch, T Vizcarra, ramohan, G Lane, G Ballantyne

    Preconcentration, through gravity separation (Wallace et al, 2015), magnetic separation and particle size (Clout, 2013), has been used in many historical projects to convert low grade material into or

    Nov 10, 2020

  • AUSIMM
    Are we there yet? Where the minerals industry is at, and where we are going with gender diversity, equity and inclusion

    By L H. G McClean

    Diversity, equity and inclusion are often cited as ‘important priorities’ by mining companies and industry organisations in their public presentations and reports, but is the minerals industry really

    Sep 1, 2024

  • AUSIMM
    AGL Energy, Loy Yang and GHD – a Further Case Study in Alliancing: Ten Years on

    By J Missen, P Currie, J Bohan, D Clark

    AGL is one of Australia’s leading integrated energy companies and the largest ASX listed owner, operator and developer of renewable energy and thermal generation in the country. AGL owns and operates

    Jun 22, 2016

  • AUSIMM
    Inception and Evolution of Cenozoic Arc-Type Volcanism in Northern New Zealand (886f7b72-4afb-4be4-a759-bffd9f4c1d50)

    By Black PM, Itaya T

    Arc-type volcanic activity has been a major feature of the late Cenozoic geological evolution of the Pacific-Australian plate boundary in the northern New Zealand region. The timelspace distribution

    Jan 1, 1995

  • AUSIMM
    Mining for Water - Partnering for Sustainable Water Use in Semi-Arid Regions

    By N Lefebvre, M Jakeman, R Aseervatham

    Semi-arid regions suffer from two afflictions; evaporation may exceed precipitation by multiples of two or more and variations in precipitation can be both extreme and difficult to predict. Many Austr

    Jan 1, 2006

  • AUSIMM
    Mineralogical and Chemical Profile of a Gold Roaster

    By Aylmore M. G

    Samples have been taken from a two-stage industrial gold roaster treating a pyrite/pyrthotite/arsenopyrite concentrate, in order to describe the mineral- ogy, composition and surface area of the calc

    Jan 1, 1991

  • AUSIMM
    Submarine deposits of base and precious metals in Papua New Guinea

    The deep seafloor in Papua New Guinea's proposed Exclusive Economic Zone appears to be a gold-rich province in the same sense as the territory above sea level. Two significant sites with polymeta

    Jan 1, 1994

  • AUSIMM
    Mining Practice in the South Alligator Valley

    This paper outlines mining practice in the South Alligator valley between 1954 and 1964. The valley is situated in the Northern Territory 130 miles south east of Darwin and trends north west. The ce

    Jan 1, 1968

  • AUSIMM
    Managing high volume water inflows of 300 L/s in the planning and development of a large scale underground Gold Mine – the Didipio story

    By J P. Evert

    Didipio gold-copper mine operation is situated in the island of Luzon, approximately 270 km north of Manila in the Philippines, in an area of high seasonal rainfall. The hydrogeological water flow mod

    Mar 29, 2023

  • AUSIMM
    The Effect of Grinding Media on Copper and Gold Flotation in the Presence of Clay Minerals

    By R Wei, Y Peng, D Seaman

    This study addresses a widespread problem confronting the mining industry: the deleterious effect of clay minerals in flotation. This problem is seemingly exacerbated by the presence of iron contamina

    Sep 26, 2013

  • AUSIMM
    The Bottle Creek Au/Ag Deposit Ore Resource Calculation Procedures

    By Moeller T

    The Bottle Creek mine, when opened next month, will consist of three open cuts, Emu, VB and Boags, feeding ore to a central mill. The open cuts cover a strike length of 4.5 kilometres which forms pa

    Jan 1, 1987

  • AUSIMM
    The Design, Construction and Operation of the Boddington Gold Mine Supergene-Basement Plant

    By Hill G

    The Boddington Gold Mine (BGM) is managed by Worsley Alumina Pty Ltd (Worsley) and is located 110 km south-east of Perth, Western Australia. The gold mine, which has operated since mid-1987, was origi

    Jan 1, 1992

  • AUSIMM
    The Engel Model-A Simulator for Optimizing Exploration Effort

    By Rowlands N. J, Zimmermann D. O

    The Engel Model search simulator is described with particular emphasis on preparation of input parameters. The computer has a "black box" role in the same way a telephone or radio is a "black box"

    Jan 1, 1974

  • AUSIMM
    AEROPHINE® 3418A Promoter as a Secondary Collector to Boost Nickel Recovery at Forrestania Nickel Operations

    By C Munro, S Emery, M Flynn, K Tan

    "AEROPHINE® 3418A Promoter is a well-known and widely used collector and is an industry standard for its excellent selectivity and efficacy in the processing of complex polymetallic sulfide ores,

    Oct 10, 2016

  • AUSIMM
    Landform Design for Pilbara Mine Site – Why Plan and Design Waste Rock Dumps for Closure Based on Site-specific Conditions?

    By G Hancock, A Kemp, I Taylor

    The mine site is situated south east of Port Hedland in the Pilbara region of Western Australia. A detailed engineering design was undertaken for six irregularly shaped waste rock dumps at the site. T

    Jul 16, 2014

  • AUSIMM
    Shaft Sinking and Drifting with Special Reference to Coal Mining in the Southern District of New South Wales

    Since the discovery of coal of the Southern coalfield (Illawarra 1797, Burragorang 1806) coal mining has grown progressively to the thriving industry of today. Early shallow escarpment mining requ

    Jan 1, 1976

  • AUSIMM
    A More Holistic View of Mill Liner Management

    By N Weerasekara, M Bird, M Yahyaei, M M. Hilden, M S. Powell, J Franke, P Toor

    The combination of new tools with a more rigorous approach to understanding the interaction of mill liners with overall mill performance and economics, forms the basis of an integrated approach to lin

    Oct 29, 2012

  • AUSIMM
    Supervisory Control of Bass Strait Oil and Gas Production

    Esso-BHP have installed a Production Supervisory Control System that is presently controlling the offshore oil and gas facilities on the Barracouta and Marlin platforms from an onshore master station

    Jan 1, 1970

  • AUSIMM
    The Broken Hill Proprietary Company Limited (Iron and Steel Works)

    By Kirkhouse C. B

    Soon after the Broken Hill Limited started operations at their Iron and Steel Works at Newcastle, NSW, it was found necessary to install a mill for rolling small merchant bars, rounds, etc.An arrangem

    Jan 1, 1935