Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Dynamic Simulation of Size Reduction Operations from Mine to Mill

    By Pate W. T

    This paper describes the development of a dynamic flowsheet simulator for comminution operations. Object oriented software design allows the handling of multiple ore types, blended into multicompone

    Jan 1, 1998

  • AUSIMM
    Leslie Bradford Golden Jubilee Oration

    LESLIE BRADFORD GOLDEN JUBILEE ORATION "Not only a metallurgist but a scientist of the highest order" Leslie Bradford and the Australian Metallurgical Industry

    Jan 1, 1987

  • AUSIMM
    Basic Considerations In Vegetating Areas Affected By Mining Activities

    In attempting to vegetate pnob!em sites some basic pn.i,ne%ptes, namely the phys.ica.e and chemi.ca2 pnope/ti;es og the problem mateni.al and the selection oU hu.itab.2e p!antts {cor pnopagati.on,

    Jan 1, 1976

  • AUSIMM
    Improving the dewatering efficiency of clay-rich tailings in saline water

    By D Liu, M Edraki, L Berry

    The presence of clay minerals slows down the settling rate and mitigates compact consolidation efficiency in tailings dewatering. The increasing use of saline water in many plants, affects the dewater

    Jul 23, 2018

  • AUSIMM
    Use of ?Tunnel Boring Machines in the Mine Environment

    By D Mather, H R. Asche

    "In the civil tunnelling field, the use of tunnel boring machines (TBM) has now overtaken the use of conventional excavation methods (drill and blast / roadheader). This is due to a number of reasons,

    Sep 17, 2014

  • AUSIMM
    Starting the Journey – Launching of the Legacy Way Open Face Tunnel Boring Machines in Mixed Face Ground Conditions

    By M Norbert, D O’Connor

    The mainline running tunnels for Legacy Way comprise two tunnel boring machine (TBM) driven tunnels. Both TBM drives commenced at the Launch Portal adjacent the Mt Coot-tha Road. Excessive surface set

    Sep 17, 2014

  • AUSIMM
    Metallurgical Accounting in the Northparkes Concentrator - A Case Study

    By R Morrison, R Dunn

    In many mineral processing operations, the reported production figures for an accounting period may not make the best use of available data. While most of the mathematical approaches, such as check-in

    Jan 1, 2007

  • AUSIMM
    Developments in Explosive SupplierûCustomer Relationships

    The original and most basic relationship between mining company and explosive supplier was a simple one of consumer and product supplier. The divide between the two was quite clear-cut with neither ta

    Jan 1, 2004

  • AUSIMM
    A Method of Predicting Open Cast Backfill Settlement as Applied to an Open Cast Coal Operation in the UK

    By Denby B

    The ever increasing demand on land use has led to large areas of land being considered for development, which because of past mining activities are covered by substantial depths of fill materials. T

    Jan 1, 1995

  • AUSIMM
    Using Life Cycle Analysis to Assess the Toxicity Impacts of Waste Streams from Metal Production Processes

    By N Haque

    Base metal ores contain low levels of toxic/hazardous elements such as arsenic, antimony, bismuth, cadmium, lead and mercury. Given the large tonnage of base metal ores mined and processed each year g

    Jan 1, 2009

  • AUSIMM
    The State of Sampling Practice in the South African Minerals Industry

    The state of sampling practice in South African minerals industry must be appreciated in the context of the changes that the country has recently lived through. These include the entrepreneurship and

    Mar 1, 2010

  • AUSIMM
    Origin of High-Grade Iron Ores at the Thabazimbi Deposit, South Africa

    By N J. Beukes, S T. Netshio, M O. de Kock

    The Thabazimbi iron ore deposit comprises a series of stratabound orebodies, on average 18 - 25 m thick that are aligned along the faulted basal contact between the Penge Iron Formation and dolostones

    Jan 1, 2005

  • AUSIMM
    Receiving Environment Monitoring Programs - Making the Most out of Biological Indicators and Direct Toxicity Assessments for Monitoring of Aquatic Ecosystems

    By L Thorburn

    In 2009, the Queensland Government developed a series of amendments to environmental authorities (EAs) for mines throughout the Fitzroy Basin in response to studies that assessed the cumulative impact

    Nov 26, 2013

  • AUSIMM
    Stakeholder Engagement and Social Sustainability in the Mining Sector

    By H Tran

    Local communities are undertaking an increased role in mine project decision making processes, associated with growing pressure and expectations from regulators, financiers and the general public. Thi

    Jan 1, 2009

  • AUSIMM
    Treasure Islands - Second Edition

    The Pacific Rim countries ofAustralia, New Zealand, Papua New Guinea, Indonesia, Fiji, Philippines and Solomon Islands will be reviewed from an equity investors perspective.   The following areas

    Jan 1, 1995

  • AUSIMM
    Production of Self-Fluxed Pellets and Improvement of Quality

    By Hanaoka K, Ikeda K

    Kakogawa Works, Kobe Steel, Ltd. has two pelletizing plants and one sintering plant, and the blast furnaces have been operated with 30 - 50% pellets. At Kakogawa Works, various improvements in pell

    Jan 1, 1980

  • AUSIMM
    Objective Geological Logging using Geochemical Multi-Element Data - Plutonic Gold Mine, Western Australia

    By M D. Taylor, G Duclaux, K Atkinson, L A. Fisher, A R. Latham, M F. Gazley, S J. de Beer, C M. Tutt

    Geological logging by mine and exploration geologists involves the application of a logging code that requires a geologist to make a subjective decision to classify a particular rock unit. This will m

    Sep 26, 2013

  • AUSIMM
    Selection of undrained shear strength parameters of residual soils and their application in stability analysis

    By Y Xu, T Rowles, B Dareeju, A Dissanayake

    Recent updates on tailings dam design guidelines require analysis of undrained (short-term) stability with the application of the SHANSEP model. The SHANSEP model, which was originally developed for a

    Jul 1, 2021

  • AUSIMM
    The Konongo Gold Project, Ghana – An Example of How Geology Makes All the Difference to a Resource Estimate

    By R Sterk, B Reid

    The Konongo Gold Project is located on the western margin of the 125 Moz Ashanti Gold Belt in Ghana, West Africa. It is situated 60 km along strike of the world-class mineral system at Obuasi and is i

    Aug 18, 2014

  • AUSIMM
    Resource Efficient Mining Processes of Tomorrow

    By P Holtham, K Duffy, W Valery, A Jankovic

    In the face of increasing energy costs, limited water resources, more stringent legislation, and lower feed grades, the mining industry is searching for more sustainable technologies and practices. Me

    Nov 4, 2015