Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Reduced Development through improved Rise and Widening Firings using Orica WebGen™ at Ernest Henry Mine

    By J Say, M Hawtin, L Carlon, P Cann

    Historically, production from sublevels of the Ernest Henry Mine (EHM) started from blind uphole rises at the end of slot drives. Where previous investigations considered removing these slot drives an

    Mar 15, 2021

  • AUSIMM
    High-pressure Fissure Grouting for Drill and Blast Tunnelling, Ambuklao, Philippines

    By C Harrison, A Bowskill

    The Ambuklao hydroelectric dam was originally constructed in the 1950s in the remote and mountainous region of the northern Philippines. Following its construction the dam has suffered heavily due to

    Sep 17, 2014

  • AUSIMM
    Closure Cost Estimation - All Things to All Men?

    By H Jones

    Closure cost estimates may be generated at any stage of a mining operationÆs life; commencing with the initial prefeasibility studies and continuing through to the final decommissioning cost estimates

    Nov 20, 2012

  • AUSIMM
    Development of Effective Rehabilitation Protocols for Mineral Sands Mining in Virginia, USA

    By W L. Daniels, C Stilson, C Zimmerman

    Mineral sands mining for ilmenite, rutile and zircon has disturbed over 1000 ha of prime farmland in Virginia (USA) since 1997 and additional areas are likely to be disturbed in Virginia and North Car

    Jul 10, 2012

  • AUSIMM
    Assessment of climate risk in the Australian mining industry

    By M Allen

    By its nature, the mining industry is energy and emissions intensive. In the future, the world will still require the outputs of mining but the industry will need to adapt to the low emissions economy

    Jul 25, 2018

  • AUSIMM
    Resue or Split Face Firing - Trial Results from Hillgrove Mine

    Resue or split face firing has the potential to separate ore and waste rock into separate muck piles within a stope. Thus split face firing has the potential to reduce dilution of the ore stream to be

    Aug 1, 2010

  • AUSIMM
    Spatial distribution of geohazards in Western Australia and Imposed risks to tailings storage facility inventory

    By J Penman, N Turner, H Liu

    This paper aims to present a snapshot of the risk profile for tailings storage facilities within Western Australia by comparing the spatial distribution of known facilities against common geohazards s

    Jul 1, 2021

  • AUSIMM
    The Influence of Material Properties on the Stability of Strata Surrounding Deep Excavations

    By Cox SJD, Kramadibrata S

    One of the major causes of accidents and loss of production in underground mines is falls of ground.As mines go deeper, higher stresses are encountered and strain energy stored in the rocks is more li

    Jan 1, 1990

  • AUSIMM
    Coal Resource Planning in the Hunter Region

    By Short KC

    The Hunter Region, with a major part of the coal resources of New South Wales and a long history of coal mining, has experienced a rapid expansion of coal resource development in recent years. Whi

    Jan 1, 1987

  • AUSIMM
    Blasting Near Mine Surface Infrastructure

    By A J. Moore

    Blasting operations in open cut mines results in airblast, ground vibration and rock movement with the potential for wild flyrock. In some mines there is a trend towards blasting closer to established

    Nov 8, 2011

  • AUSIMM
    Stratigraphy of the Marra Mamba Iron Formation within the Chichester Range and its Implications for Iron Ore Genesis at Roy Hill - Evidence from Deep Diamond Drill Holes within the East Fortescue Valley

    By P Hawke, J Hurst, B KrapeP

    Hancock Prospecting Pty Ltd (HPPL) drilled two deep diamond stratigraphic holes (ECD0001 and RHD0296) within the eastern Fortescue Valley in the Pilbara of Western Australia. Located south of the Roy

    Aug 12, 2013

  • AUSIMM
    Mine Pit Slope Geotechnical Design

    Mine pit slopes in the Pacific Rim are a geotechnical challenge because of the complex geology in which they are developed. Mines are currently being fast-tracked to meet the increase in commodity pri

    Jan 1, 2006

  • AUSIMM
    Benchmarking and cross validation of the multivariate conditional simulation model of the Olympic Dam deposit

    By D Clarke, I Minniakhmetov

    The Olympic Dam deposit is truly a world-class IOCG-Ag deposit, the world’s fourth largest deposit of copper and the world’s largest known single uranium deposit. Traditional and non-traditional metho

    May 24, 2023

  • AUSIMM
    The Iron Magnet Deposit

    By G Bubner, C Gaughan

    Magnetite mineralisation within the South Middleback Range has been known since the early 1930s; however, it was not until 1989 that BHP (then owners of the Middleback Ranges mining leases) drilled 10

    Jan 1, 2005

  • AUSIMM
    The Network Centric Mine

    By G Malherbe, J Gonzalez, D C. Franklin, J Bassan, C T. Farrelly

    To respond to ever-increasing challenges, mining companies have been experimenting with new business models and technologies in order to speed mine development, production, processing and transport. T

    Nov 20, 2012

  • AUSIMM
    Ancestral Pacific Margins in Eastern Australia Some Lessons from the Modern Pacific Rim

    By Mallett CW, Hammond RL

    Geological maps of the Pacific Rim recently published by the Circum-Pacific Council for Energy and Mineral Resources have provided a useful perspective from which to view modern plate interaction

    Jan 1, 1987

  • AUSIMM
    Propagation of the South Wedge - Drill and Blast

    By R Cunningham, P Duniam

    Late in 2005 it became apparent that cave propagation at the Northparkes Mine was not progressing as planned. By mid-2006 sufficient Reserves were identified to warrant an extensive drill and blast pr

    Jan 1, 2007

  • AUSIMM
    Thirty years since Moura No.2 – so what has changed?

    By D I. Cliff

    The loss of 11 miners in the 7 August 1994 Moura No.2 Underground Mine Disaster was the catalyst for major change in the way safety was managed in the Australian Mining Industry. The impact was felt a

    Apr 16, 2024

  • AUSIMM
    Concentrator design – standard engineering practice versus geometallurgy and simulation

    By G Harbort, K Quan

    Traditional engineering practice for concentrator design uses a mixture of risk minimisation options and capital minimisation approaches. Often this is based on the preferences and experiences of the

    Sep 11, 2017

  • AUSIMM
    Metallugical Plant ù Have We Run Out of Developments?

    I have headed this paper with a question and for the impatient among you ûthe answer is no we have not run out of developments but, and it is a big æbutÆ, we need to be innovative and ahead of the gam

    Jan 1, 2002