Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Simplified Hybrid Semi-autogenous Grinding Mill Control – Explanation and Practical Results at the Porgera ConcentratorBy E Beltran, S Ngunz, F Orrante, F van Zyl, M Westcott
"The primary control objective of the project is to achieve milling optimisation by ensuring that the energy available for rock breakage is used as efficiently as possible. This is achieved by increas
Oct 10, 2016
-
Proactive Measures for Fatality Prevention in the Mining Industry ù Why Fatalities Persist While Lost Time Injuries DeclineThe traditional measure of Lost Time Injury Frequency Rate (LTIFR) as a measure of improvement in safety performance is recognised as inadequate and misleading, lulling managers into believing that sa
Jan 1, 2003
-
Required Cooling System Capacities for Extended Longwall Panels at a Bowen Basin MineBy M S. Kizil, T OÆConnor
It is predicted that underground coal mines in the Bowen Basin will have a significant rise in heat problems as mines aim to increase production, depth of extraction and length of longwall panels. At
Jul 1, 2013
-
Opportunities for Integrated Mine Management to Minimise Risk and Create ValueBy D Rattray, D Macfarlane, I Robb, N Halpin, G T. Dale
Mining faces many environmental, social and regulatory liabilities of which water management is just one. Others include site rehabilitation, carbon emissions, biodiversity offsets, strategic cropping
Nov 26, 2013
-
Changing Trends in Column Flotation Use – Their Impact for Australian Mill OperatorsBy D Frost, G Harbort, T Lipiec, N Deonarain
"The use of flotation columns has remained a contentious issue among mill operators. There are those who consider them an essential part of any mineral processing operation, while others consider them
Oct 10, 2016
-
Remote Mining in the Canadian Arctic - The Falconbridge Limited Raglan ExperienceIn February 1995, Falconbridge Limited approved the construction of a nickel mining and milling facility on its Raglan property situated in the Nunavik region of northern Quebec, Canada. The construct
Jan 1, 1998
-
Flotation Optimisation Studies of the Perilya Broken Hill Lead CircuitBy B Kilgariff
Flotation has been in use at Broken Hill for nearly 100 years, and the process has gone through many different optimisation studies over that time. This paper reviews the current flotation practice at
Jan 1, 2005
-
Collaborative development of mine ready electric vehicleBy H Guthrie, J Hodder, J Bain, S Durkin
Australian mines have traditionally relied on diesel powered vehicles to fulfil their light vehicle needs. There are many reasons for the resources industry to review its use of diesel-powered vehicle
Mar 15, 2021
-
Methods and Apparatus for the Determination of Dust Suspended in AirBy Read T. A
PART 1The quantity of dust present and the methods used for suppression of dust in metalliferous mines has, in recent years, received considerable attention from mining engmeers in various parts of th
Jan 1, 1922
-
Climate Related Adaptation from Terrain Evaluation Results (CRATER) - Interpretation of Pre-existing Data for Mine Site Flood Vulnerability and ManagementBy M Grigorescu, J H. Hodgkinson, H Alehossein
A new framework that collates and interprets pre-existing data to assess vulnerability and ultimately plan to avoid or minimise flood-related risk to infrastructure, people, downtime, environment and
Nov 26, 2013
-
Lead-Smelting Practice at the Port Pirie Works of the Broken Hill Associated Smelters Pty. Ltd.By Hughes J. C
THE smelting plant consists of five large furnaces operating in the treatment of current flintered material, and one small furnace operating periodically in the treatment of copper dross and antimonia
Jan 1, 1922
-
Cemented Fill Practice and Research at Mount IsaThis paper considers three aspects of cemented fill practice and research in Mount Isa. Firstly, an account is given of the use of Portland cemented hydraulic fill, considering mainly the role and s
Jan 1, 1980
-
Regulatory Perspective ù Development of Closure Plan With Adequate Financial Assurance for the Protection of Ground Water Quality at the Chino Copper MineBy K Myers
Since the mid-1990s, the Chino Mine Facility (Chino) located near Silver City, New Mexico has been developing a closure plan with financial assurance to protect water quality, as required by State reg
Jan 1, 2003
-
The Rationale for use of Three Heading Gate Roads in Australian Underground Coal MinesBy R G. Moreby
The purpose of this paper is to provide the rationale for decision making when considering the use of three heading gate roads in Australian underground coal mines.There are currently 30 underground l
Jul 1, 2013
-
Rock Deformation and Mineralization at Mount IsaBy Hall G
The Mount Isa silver-lead-,zinc deposit possesses a number of features which sets it apart from usual occurrences of ores containing those metals. The deposit has been described in vario:us papers, bu
Jan 1, 1942
-
Innovations in underground hard rock operator efficiency – through simulation-based training technologies and processesBy J A. de la Torre, I R. Cerna, G K. Karadjian
The La Colorada underground mine in Zacatecas, Mexico is a mechanised cut-and-fill silver mine with a capacity of 1250 t/d. The project focused on training the mine’s experienced operators for a fleet
Oct 16, 2017
-
The Augmented Mine Worker – Applications of Augmented Reality in MiningBy J Bassan
The mining industry is faced with imperatives to improve worker safety and productivity, adapt to skills shortages, high worker turnover rates, and provide more effective maintenance to new and ever m
Nov 22, 2011
-
Thiosulfate Processing - From Lab Curiosity to Commercial ApplicationBy J Langhans, Y Choi, Q Wang, J Y. Baron, P Kondos
Barrick has successfully developed the thiosulfate leaching process to treat sulfidic high preg-robbing ores. The process was developed through rigorous bench test programs and proved in pilot campaig
Sep 26, 2013
-
An Evaluation of Pricing and Allocation Methods Under the Crown Minerals Act 1991The Crown Minerals Act provides a new+framework for the management of Crown owned minerals and requires that regard be had for the principles of the Treaty of Waitangi. The Act requires the preparatio
Jan 1, 1992
-
Durability Planning for Underground InfrastructureBy D Wimpenny
Underground infrastructure is often a critical component of transportation and utility schemes. It is characterised by long design lives with limited access for inspection and maintenance. The exposur
Mar 8, 2011