Liberation-Limited Grade/Recovery Curves From X-Ray Micro Ct Analysis Of Feed Material For The Evaluation Of Separation Efficiency - Preprint 09-025By J. D. Miller
Characterization of feed material with respect to expected concentrate grade and recovery is fundamental to the design of improved separation efficiencies and to achieve sustainable development in the
Jan 1, 2009
-
Electro-Biochemical Reactor (EBR) Technology for Selenium Removal from British Columbia?s Coal-Mining WastewatersBy A. Opara
The weathering of coal mine waste rock releases iron, calcium, sulfate and associated trace elements like selenium [Se], which are introduced to seepage waters. Nitrogen species, such as nitrate and a
Feb 23, 2014
-
Electro-Biochemical Reactor (EBR) Technology for Selenium Removal From British Columbia?s Coal-Mining WastewatersBy A. Opara
The weathering of coal mine waste rock releases iron, calcium, sulfate and associated trace elements like selenium [Se], which are introduced to seepage waters. Nitrogen species, such as nitrate and a
Feb 23, 2014
-
Boart Longyear 4200 Surface Drill Features Improved SafetySafety is the No. 1 concern of any drill contractor or mine operator. Everyone in the industry knows a safe site helps stabilize operational costs and enables higher productivity. When it comes to ex
Jan 1, 2009
-
Design/Build of Tunnel and Shaft at Blue Ridge Dam LLOBy Carl Johnson, D. R. Todd
The Blue Ridge Low Level Outlet (LLO) was a design/build contract to provide a secondary means of discharging water from the Blue Ridge Reservoir. The project involved driving a 3.25 m (11 ft) modifie
Jan 1, 2005
-
Portland, Oregon’s Alternative Contract Approach—A Final SummaryBy Paul Gribbon, Julius Strid, Greg Colzani, Jim McDonald
Portland, Oregon’s $370 million West Side Combined Sewer Overflow Tunnel Project has completed the final phase of construction and commissioning. The construction contract, which began in September 20
Jan 1, 2007
-
Amax Uses Practical Approach to Dewatering at Its Sleeper MineBy W. David Tyler
Any mining or engineering-construction excavation that extends below the water table must be dewatered. In many situations, the ground is of low permeability or the workings extend only a short distan
Jan 1, 1991
-
A Life-Cycle Approach to Coal Resource Analysis: Examples From the Appalachian and Illinois Basins – Preprint 97-25By R. C. Milici
Historical production data and reserve decline rates can be used both to predict future coal production rates and to estimate when the reserve will be depleted. Reserve estimates inferred herein from
Feb 24, 1997
-
A Simplified Computerized Method To Predict Maximum Subsidence And The Subsidence Profile For The Appalachian Coal BasinBy Kewal K. Kohli, Thomas Z. Jones
This paper presents a simplified computerized method for the prediction of maximum subsidence and the subsidence profile for the Appalachian Coal Basin using the Hyperbolic Function Profile Method. Se
Jan 1, 1986
-
Integrating Hydro-Fracturing Technology And Geophysics Into 3d Mapping And Extraction Of Metals In Heap Leaching; Hydro-Jex And High Resolution Resistivity ?.By Seal. Thom
Large heap leach operations around the world contain significant under-leached metal values that present recovery challenges to operators. The first challenge is to find the location of the highest
Jan 1, 2008
-
Hydrodynamic Influences In Flotation Machine DesignBy V. R. Degner
The minerals industry trend toward very flotation machines, exceeding 10 m3, began in the late 1960's and responds to the continuing desire to achieve better plant economics through improved plan
Jan 1, 1985
-
Development of Cyanide Leaching Processs For Small High Grade Gold and Silver DepositsBy Michael Harris, David Mosch
The numerous small high grade gold and silver deposits of the Front Range Mineral Belt have been uneconomical because of the high costs of mill construction, transportation, and smeltering. Processing
Jan 1, 1987
-
Recent Developments In Dense Medium Cyclone Circuit Design – PreprintBy L. Watters, R. Terry, D. Placha
Dense medium cyclones are the preferred means for cleaning 1/2 in. x 14Mesh to 28Mesh (12.7 mm x 1.0 mm to 0.6 mm) raw coal and are becoming a common choice for cleaning raw coal from a nominal top si
Feb 24, 1997
-
Putting Computational Fluid Dynamics To Work On Mining And Metals ProjectsBy D. M. Lane, J. M. Berkoe
Engineers and Owners share a common desire to build reliable, efficient plants on schedule at reasonable costs. This paper describes one tool that Bechtel finds can integrate these objectives by “pu
Jan 1, 2000
-
Improving Energy Efficiency in Copper Heap Leaching with the use of BindersBy K. A. Lewandowski
Leach heaps are plagued with problems due to fine material migrating downwards, clogging the spaces between the coarser ore particles, resulting in decreased metal recovery rates. The use of a binder
Jan 1, 2008
-
No. 7 Subway Extension Crossing Under An Existing Subway Station: Challenges And Integration Of Underpinning Into The Design Of New TunnelsBy Aram Grigoryan
This paper addresses the challenges of designing the underpinning of major sub-way station with 4 operating tracks. No. 7 subway extension crosses under the existing 42nd street subway station on the
-
Specifying and Acquiring Longwall Shield SupportsBy John Matthews
During 1982 and 1983, it became increasingly clear that North River No. 1 Mine would have to buy a set of replacement longwall shields. Despite extensive efforts to make improvements, the shields that
Jan 1, 1986
-
Back Injury Control Measures For Manual Lifting And Seat Design (713e5a18-b501-4cad-ba17-ce99f61f5c68)By S. Gallagher, A. Mayton
Introduction The mining industry has long been associated with a high incidence of low back disorders and pain (Klein et al. 1984, Leigh and Sheetz 1989, Brinckmann et al. 1998). It is believed th
Jan 1, 2007
-
Some Design Aspects Of Large Uranium Mills ? 1. IntroductionBy D. J. McParland
This paper will deal with some of the considerations which, were involved in the design and construction of the uranium mills in the Elliot Lake area . These plants, eleven in number, range from 1500
Jan 1, 1959
-
An Analysis Of Subsidence Movements Associated With An Abandoned Shallow Room-And-Pillar Coal MineBy Yoginder P.
ACKNOWLEDGEMENTS Authors sincerely appreciate the interest, cooperation and technical support of the coal company management and staff in conducting the study. Without their assistance this study
Jan 1, 1986