Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Future of Mining: Views and PerspectivesBy M. Javier
"Mining makes civilization possible. It also creates socio-environmental liabilities forcing us to ask how much more of this mining can our planet support. It is clear that the future of mining differ
Jan 1, 2016
-
New Concepts In Australian Coal Terminal ProjectsBy N. J. Ferguson
An upsurge in demand for Australian coal has seen a much needed programme for a new generation of coal ports. This paper discusses design concepts in planning a large modern terminal, with the 25 Nt/a
Jan 1, 1982
-
Recovery And Removal Of Elemental Phosphorous From Electric Furnace Sludge (2e8bdc10-37d2-46eb-9387-22e51c11c12f)By Ibezim J. Anazia
Electrothermal production of elemental phosphorous (P4) generates substantial amounts of highly toxic phossy water and sludges. Because of their high phosphorous content and lack of reliable processin
Jan 1, 1991
-
Improved X-Ray Analyses By Application Of Real-Time Computers - Introduction:By Jerry R. Riding
Metallurgical process methods have seen dramatic improvement over the past fifty years. As these improvements have come about, more and more emphasis has been placed on obtaining accurate and rapid an
Jan 1, 1969
-
Distribution Of Injected Oxygen In A Large Underground Flooded Region Of Broken OreBy R. L. Braun
In situ chemical mining of primary sulfide ore requires distribution of injected oxygen in a large underground flooded region of broken ore. Although the maximum oxygen content of the leach solution w
Jan 1, 1974
-
Effect of Mercury on The Merrill-Crowe Process at FMC Gold's Paradise Peak MineBy M. G. Eiselein, R. A. Smith, C. H. Sheerin
FMC Gold's Paradise Peak Mine was one of the top two producers of mercury metal in North America in 1988 and 1989. As a by-product, elemental mercury is produced from cyanide soluble mercury mine
Jan 1, 1990
-
Automation of Roof Bolting in Underground Coal MinesThrough Electrohydraulic ControlBy Kevin Saeler, Patrick Willaman
Utilizing automation is one way to improve competitiveness. Roof and rib bolting in underground coal mines has not changed significantly for more than 40 years. Most roof bolting is still a largely ma
Jul 1, 2023
-
TBM Data and Performance Monitoring on Large Diameter TBM Tunnels Lined with Shotcrete in the Himalayas—A Case Study - RETC2021By Gary Peach, Peter Mason
Planning and estimating progress rates and costs for tunnelling is always best done based on experience and historic precedent. Much precedent is available but the use of data monitoring, data mining
Jun 13, 2021
-
Nitric-Sulfuric Leach Process ImprovementsBy D. S. Davies
Further development of the Nitric-Sulfuric Leach (NSL) process has led to an improved design of the leach and nitric acid recovery steps. NO produced in the leach step is reacted with oxygen, regenera
Jan 1, 1978
-
Semi-Autogenous Grinding Of Copper OresBy N. J. Themelis
Autogenous grinding, broadly defined as the self-comminution of ore in a cylindrical tumbling mill without using auxiliary grinding media, was first applied in the early thirties in the so-called Hads
Jan 1, 1978
-
Enhancing Synthetic Zinc Ferrite Hydrochloric Acid Leaching by Using Isopropanol as a SolventBy Galymzhan Karamyrzayev, Rashid Nadirov
Zinc ferrite ( ZnFe2O4) is a by-product of non-ferrous metal production and is considered a promising source of raw zinc. The most efficient way to extract zinc from its ferrite is via acidic extracti
Jun 5, 2022
-
Application Of 3-D Reflection Seismic In Salt Mining: A Case HistoryBy F. A. Molloy
As a result of feasibility studies made in 1975 a 3-0 seismic reflection survey was shot over part of the Veendam salt pillow during 1978-1979. The Zechstein salt pillow, located in the northeast of t
Jan 1, 1981
-
Estimation of Optimum Line of Extraction for Continuous Miner Workings and Development of Continuous Miner Stability Index (CMSI) using 3D Numerical Modeling and Statistical ApproachBy Sunil Bodakunta, Sreenivasa Rao Islavath
The abstract highlights the importance of determining the optimum line of extraction in continuous miner workings for improved safety and productivity. The study investigates three extraction techniqu
Apr 28, 2022
-
Preprint 68F41 ? AbstractA significant technological development is discussed for the processing of certain problem power plant flyashes which contain a high water soluble mineral content and which are known to yield inferior
Jan 1, 1968
-
Semiautogenous Vs Conventional Steel Consumption At Cyprus PimaBy John H. Bassarear
By 1968 Cyprus Pima was milling 38,000 tpd of copper ore using a conventional flowsheet consisting of three stages of crushing rod mills and ball mills. A 15,000 tpd expansion was put on stream late i
Jan 1, 1980
-
Carrier Flotation For The Removal Of Radionuclides From Contaminated Soils (PREPRINT NUMBER 96-14)By E. H. Cho
A current environmental concern is the cleanup and restoration of soil contaminated with low-level radionuclides at DOE sites including the Nevada Test Site. At the present, there is no applicable pro
Jan 1, 1996
-
An Assessment Of Motor ReliabilityBy Robert Stefanko
The widespread and increasing use of electrical power for mechanized power has made a tremendous impact on the coal mining industry. It is probably the single most important factor influencing the pro
Jan 1, 1972
-
Reagent Manufacture At Nevada Mines Division ? IntroductionBy J. J. Harrington
Manufacture and mixing of flotation reagents at the mill site provides an economic and convenient method of maintaining a continuous and fresh supply of reagents for concentrator operations. Kennecott
Jan 1, 1976
-
Wastewater Discharge Sites From Mining Operations In The "New Lead Belt" Of MissouriBy Nord L. Gale
Lead, zinc, copper, silver, cadmium and many other heavy metals which are potentially hazardous if released into the environment in wastewater discharges have been of considerable concern to governmen
Jan 1, 1977
-
Istanbul Strait Road Crossing Tunnel - Project Challenges and TBM SolutionsBy Ergin Arioglu, Werner Burger
"SUMMARY The Istanbul Strait Road Crossing Project includes a 3.34 kilometer subsea tunnel excavated by TBM with an excavation diameter of 13.71 m. The tunnel will incorporate two road decks, each emp
Jan 1, 2016