Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
High Capacity Micropiles in Weak Dolomitic Limestone for Crane Foundation Support – A Case History in Temporary FoundationsBy Brian D. Barkauskas, Terence P. Holman
A major combined nuclear and coal-fired power plant, located in on the western coast of Florida has undergone multiple upgrades in recent years to increase power output and enhance environmental contr
Jan 1, 2017
-
A Case Study Describing The Use Of A Top Down Construction Sequence For A Three Level Basement Using A Diaphragm Wall And Cfa Foundation PilesBy Chris Leach, Lucie Spencer
This case study describes the geotechnical aspects of the basement construction for a multi-storey, residential and hotel complex located in the newly developed Elizabeth Quay precinct in Perth, Weste
Nov 1, 2022
-
Friction Loss in Tieback Anchors used for Landslide StabilizationBy John P. Turner, Benjamin J. Turner
"Tieback anchors are now used routinely for landslide stabilization in the USA and abroad. It is generally understood by design engineers that friction loss over the unbonded length of a tieback ancho
Jan 1, 2017
-
Rehabilitation of an Existing Mechanically Stabilized Earth Wall Using Soil NailsBy Daniel A. Thome, Robert C. Janke
"Installation of permanent soil nails through distressed mechanically stabilized earth retaining walls is a cost effective and aesthetically pleasing solution when using the appropriate equipment and
Jan 1, 2005
-
“Borehole Stabilization” For Deep Excavation, An Essential Part In Bored Piling / Diaphragm Wall ConstructionBy Thomas Domanski
Any type of deep excavation whether for Bored Piling, Diaphragm Walls or Contiguous Bored Piling Walls depends on forming a stable borehole with a defined cross-section to receive safely the permanent
Sep 1, 2022
-
Geotechnical Challenges of Pile Driving in a Marginally Stable Slope Terminal 46 Apron Upgrade, Port Of Seattle, WA (18615664-0169-4e91-aa2b-8ec5994bb0a0)By Monique Nykamp
"INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the
Jan 1, 2007
-
Geotechnical Challenges of Pile Driving in a Marginally Stable Slope TERMINAL 46 APRON UPGRADE, PORT OF SEATTLE, WABy Monique Nykamp
"INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the
Jan 1, 2007
-
Digital Automation Of Geotechnical Sites – The Development And Essential Role Of An Industry Standardised Design FormatBy Scott White, Pishun Tantivangphaisal, Andrew Bell, Chris Barker
There has been considerable advancement in recent years in the tools, both software and hardware, available to allow efficient digitalization of site records during the construction of geotechnical wo
May 1, 2022
-
Cooling Water Intake Shafts for the Oak Creek ExpansionBy Edward Jacobsen, Patrick J. Lydon
"The ongoing expansion of the Oak Creek Power Plant in Oak Creek, Wisc., includes a tunnel bored in rock that connects to four vertical intake shafts approximately 1.5 miles (2.4 km) offshore in Lake
Jan 1, 2008
-
Construction Of Two Microtunnel Access Shafts Using The Cutter Soil Mix (CSM) Method In The San Joaquin Delta, CaliforniaBy Eric S. Lindquist
Two microtunnel access shafts were constructed using the Cutter Soil Mixing (CSM) method in the San Joaquin Delta region of California, east of San Francisco. Unlike conventional slurry walls and diap
Jan 1, 2010
-
Best Practices for Soil Mixing Near Sensitive StructuresBy Joseph A. Mann
"Soil mixing is a proven solution for the construction of ground improvement adjacent to sensitive structures due to the use of computer controlled and monitored equipment. The precision to which geom
Jan 1, 2015
-
How Choice Of Foundation Can Alter The Fate Of A Bridge Project – 3 Case StudiesBy Alok Bhowmick
The most uncertain and challenging part of a bridge design and construction is the ‘Choice of foundation’. During the planning and conceptual design stage, it is extremely important to choose the righ
Nov 1, 2022
-
PPP Contract Delivery System- Contractual Risks and Ethical Issues Regarding Deep Foundation SubcontractorsBy Alexander Filotti, Richard Kalson
"1. INTRODUCTION- WHAT IS P3 OR PPP ?The Public Private Partnership (PPP or 3P) is a project delivery scheme based on the government providing land and/or a concession agreement, and on a private enti
Jan 1, 2017
-
Selecting the Right Shoring System – San Francisco ExperienceBy Heinrich Majewski, Rob Jameson
"Careful review of site conditions and constraints is essential to select the appropriate shoring system for each project. Key evaluation criteria include the geotechnical profile, groundwater and env
Jan 1, 2017
-
Influence Of Freeze–Thaw Cycles On Strength And Heavy Mental Leaching Performance Of Petroleum Drilling Mud Stabilized By WasteBy Tian Miaomiao, Cheng Yin, Shen Jun, Yu Hao, Li Yafei
Vast amounts of waste drilling mud containing heavy metals is produced during oil drilling process, which causes great pollution to the environment. Therefore, it needs to be treated until it is harml
Nov 1, 2022
-
Simulation of Soil Plug Effects in Open Steel Pipe Piles Considering the Complex Soil-Structure-Interaction during InstallationBy Johannes Labenski, Christian Moormann, Johannes Aschrafi
"Open steel pipe piles are used for various applications in costal engineering, port structures and increasingly important for offshore structures. During the installation of open steel pipe piles the
Jan 1, 2017
-
Undergraduate Learning CommonsBy William M. Tanner, Daniel C. Brahana
"A drilled pier foundation was originally designed to support the proposed G. Wayne Clough Undergraduate Learning Commons on the campus of Georgia Tech in Atlanta, GA. Reflective of the site geology,
Jan 1, 2015
-
Charleroi Locks: Repair Methods to Restore Structural Integrity of Large-Diameter Drilled ShaftsBy Alexandre Alex) J. Bredikhin
"DISCLAIMER: the statements presented herein are those of the author and do not necessarily represent the views of US DoD or its Components.ABSTRACTProgress on the $750M lock project on the Monongahel
Jan 1, 2017
-
Guideline for Interpretation of Nondestructive Integrity Testing of Augered Cast-In-Place and Drilled Displacement Piles"1 INTRODUCTIONThe use of nondestructive testing (NDT) methods to evaluate the integrity of Augered Cast-in-Place (ACIP) and Drilled Displacement (DD) piles has been a subject of significant debate am
Jan 1, 2016
-
Session 17 "Grout for Enhancement of Piles and Piers"By Dennis Wrixon
It was a little bit exceeded. The decision was the uniform settlement is measured at each one corner and the highest one corner is the important one. And in addition there is a differential settlement
Feb 10, 2003