Installation, Design, And Quality Control Of Augercast Piles ? Introduction
By William J. Neely
Augercast piles are formed by drilling a continuous-flight auger into the ground and, on reaching the required depth, sand-cement grout or concrete is pumped down the hollow stem as the auger is withd
Jan 1, 1990
-
Sonic Drilling Offers Quality Control And Non-Destructive Advantages To Geotechnical And Construction Drilling On Sensitive Infrastructure Sites
By John P. Davis
The use of conventional, circulatory air rotary and fluid rotary, cased and uncased drilling methods in the vicinity of sensitive infrastructure can have deleterious effects on the ground conditions s
Jan 1, 2006
-
250 M Ultra Deep Milled Diaphragm Wall: The New Frontier for the Cut off Wall Depth has Been Doubled by Trevi Group Technology
By Maurizio Siepi, Stefano Trevisani, Pagliaccim Federico, Daniele Vanni
"Abstract: The paper describes a large innovative project completed in 2012-20123 by Trevi Group, to develop equipment capable to install ultra-deep diaphragm wall. The project highlights the capacity
Jan 1, 2014
-
Common Sense Changed Conditions
By Bert R. Oastler
BERT R. OASTLER: Born Atlanta, Georgia, October 19, 1933; B.S. Civil Engineering, Duke University, 1956; Doctor of Laws, Emory University, 1966; Bryan Honor Society; Associate Editor, Journal of Publi
Jan 1, 1988
-
-
Resonant Driving of Sheet Piles: High Production Sheet Pile Driving With Zero Ground Vibration
By Mathew Janes
"Sheet piles remain an economic solution to many shoring problems. However, installation of sheet piling suffers high noise and vibration with conventional impact or vibratory methods or low productio
Jan 1, 2014
-
Diaphragm Walls, Recent Developments to Improve Reliability
By A. Frits van Tol, Rodriaan Spruit, Jan H. van Dalen
"Abstract In recent years, there have been major problems with deep excavations in urban areas supported by diaphragm walls. In some cases, like the fatal Nicoll Highway collapse in Singapore the qual
Jan 1, 2014
-
Micropile Foundations For Support Of New Bridge Structures Over Abandoned Mine
By Timothy J. Myers
Expansion and the economic growth in the southwestern region of Missouri necessitated the expansion of State Route 249 and the construction of a new interchange to provide service to the Joplin, Misso
Jan 1, 2009
-
Use Of The Observational Method (Best Way Out) To Allow Driven Pile Installation In Chalk - Introduction:
By Paul Morrison
The paper describes the design process, trial testing and contract pile installation of 772 precast concrete piles at a site in Surrey, South East England. Recommendations on how to improve the desig
Jan 1, 2000
-
A New Analysis Of Data From Statnamic Tests On Piles In Clay
By William F. Anderson
A series of pile load tests (maintained load tests, constant rate of penetration tests at different rates, and statnamic tests) was carried out on an instrumented model pile installed in clay beds pre
Jan 1, 2006
-
Defective Piles In Clay - Synopsis
By S. Narasimha Rao
Bored cast in situ piles are highly susceptible to construction defects like necking, discontinuity in concreting, poor compaction of concrete, improper end bearing condition due to inadequate cleanin
Jan 1, 1996
-
Special Foundation Systems - Introduction
By D. A. Greenwood
Dr David Greenwood opened the first technical session of the conference by highlighting the diverse nature of the papers in this session but drawing attention to the common theme that each solved a pa
Jan 1, 1991
-
Large Diameter Rock-Socketed Caissons For Vent Building No. 6 Central Artery/Tunnel Project, Boston - Introduction
By P. A. Neill, O&apos
The caisson foundation for Vent Building No. 6, at the southern landfall of Boston's Third Harbor Tunnel, was installed inside an unbraced concrete cofferdam 250 feet in diameter and about 70 fee
Jan 1, 1994
-
A Unique Solution To Mitigate Movement At The Jefferson Memorial Seawall
By Jesús E. Gómez
In the Summer of 2011, emergency repairs to the Jefferson Memorial North Plaza and Seawall were completed. These repairs were necessitated by settlement and lateral movement of the seawall and North
Jan 1, 2011
-
Piled-Raft Foundation (PRF) Optimization Design With Connected And Disconnected Piles
By A. Eslami
In recent development of piled raft design, the contribution of both raft and piles to tolerate the loads is taken into account, depending on the stiffness and contributions of involved elements i.e.;
Jan 1, 2008
-
A Quality Control System For Augered Cast-In-Place Pile Installation
By George G. Goble
The use of augercast piles has been limited by the engineer's concern for the structural quality of the installed pile. The nature of the pile is such that its final structural continuity is very
Jan 1, 1997
-
Dynamic Testing Results Indicator Pile Test Program --I-880 - Introduction
By D. Michael Holloway
The California Department of Transportation (CALTRANS) evaluated several pile foundation schemes for supporting the structures along the realignment of Interstate 880. The project replaces the double-
Jan 1, 1995
-
New Tacoma Narrows Bridge Caissons (3b3023d3-bc2c-4a9b-8e78-d499291fb07f)
By R. Bruce Patterson
The New Tacoma Narrows Bridge is a classic suspension bridge founded on concrete caissons. Caisson construction was complicated by the proximity of the existing bridge piers, only sixty feet away. H
Jan 1, 2004
-
-
Driven Piles For New Pacific Northwest Baseball Park - Introduction
By Thomas M. Gurtowski
The New Pacific Northwest Baseball Park, now known as Safeco Field, is located directly south of the Kingdome in Seattle, Washington, and will be the new home of the Seattle Mariners baseball team. Th
Jan 1, 1998