    Vibwall Installation - Cardiff Bay Barrage ? Synopsis

    By Graeme McWhirter

    This paper discusses the Installation of a Vibwall for the Cardiff Bay Barrage Project Wales, UK, by Kvaerner Cementation Foundations. Only the second use of the technique in the UK the wall was succe

    Jan 1, 2000

  • DFI
    Open Well Caissons Of A 1917 Railroad Bridge: How 19th Century Construction Can Influence 21st Century Construction (f1b0a5f2-b1b8-41d4-bbfb-fab6f395e7a0)

    By Alan D. Fisher

    Amtrak made a decision to replace an aging bascule bridge with a vertical lift bridge for their crossing of the Thames River in New London, Connecticut. The new lift bridge occupies the same alignmen

    Jan 1, 2008

  • DFI
    Quality Control Of Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Piles ? Introduction

    By Rudolph P. Frizzi

    Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is

    Jan 1, 2003

  • DFI
    Non-Destructive Testing Methods For Drilled Shaft And Acip Piles

    By George Piscsalko

    There are numerous methods currently available to assess the integrity of drilled shaft and ACIP piles. Each method has its advantages and limitations. This paper will compare the various available me

    Jan 1, 2011

  • DFI
    Piling Practice in Sedimentary Granular Soils of Santa Cruz, Bolivia

    By Mario Terceros H, Bengt H. Fellenius

    "ABSTRACTThe city of Santa Cruz, Bolivia, is historically dominated by houses and three to five storey buildings.The geology in and around the city is such that even very light buildings need to be su

    Jan 1, 2014

  • DFI
    Micropile-Supported Wall To Resist Lateral Deflection Of Existing Railroad Bridge Abutment

    By Samer R. Rabab?ah

    As part of the PHX Sky TrainTM project at Phoenix Sky Harbor International Airport in Phoenix, Arizona, the existing traffic lanes at the 44th Street underpass below the Union Pacific Railroad (UPRR)

    Jan 1, 2011

  • DFI
    Value Engineering And Field Testing Of Pre-Cast Concrete Piles For The kcICON Project

    By Elizabeth M. Smith

    The kcICON design-build project in Kansas City, Missouri includes widening the existing roadway, improving interchanges and grade separation bridges, and replacing the Missouri River Bridge. The Miss

    Jan 1, 2009

  • DFI
    Construction Of Large Underground Openings And Use Of Grouts ? Synopsis

    By E. Mongilardi

    The construction of large underground openings through cohesionless or weak cohesive soils and under the water table in particular, often requires a ground improvement to be done from the surface or a

    Jan 1, 2010

  • DFI
    Application Of Electro-Kinetics To Expedite Pile Setup In Kaolinite Clay

    By Susheel R. Kolwalkar

    A significant increase in the side shear capacity over a period of time is often observed in case of driven piles. This phenomenon is referred to as ?setup? or ?freeze?. This phenomenon cannot be pred

    Jan 1, 2008

  • DFI
    Deep Excavation In The Shanghai Soft Clay Under Protection Of A Cast-In-Situ Retaining Wall ? Synopsis

    By M. Pernot

    A 12 m-deep excavation has to be perfomed in the Shanghai soft clay to install an underground electric substation. This article was originally intended to study the behaviour of the wall, the excavati

    Jan 1, 2010

  • DFI
    Vertical Earth Reinforcement Technique - Test Wall 1998 DFI Annual Conference And Meeting

    By Peter J. Nicholson

    A new method of constructing retaining walls, in-situ, prior to excavation has been developed. This "Vertical Earth Reinforcement Technique" VERT, has been demonstrated at a full scale test wall at th

    Jan 1, 1998

  • DFI
    Case Studies In Mission Bay, San Francisco: Deep Foundations In Challenging Soil Conditions

    By Lori A. Simpson

    Mission Bay is a 300-acre reclaimed site in San Francisco, California, that is currently being redeveloped. Plans include new neighborhoods, parks, a new University of California, San Francisco, rese

    Jan 1, 2006

  • DFI
    Hydrocutter-Excavated Slurry Wall for Center Hill Dam Foundation Remediation

    By Michael Arnold, Bob Faulhaber, Joe Nichols

    "Center Hill Dam is a critical part of the infrastructure controlling floods at the Caney Fork River and reducing flood levels at the Cumberland, lower Ohio and Mississippi Rivers. The Center Hill Dam

    Jan 1, 2017

  • DFI
    Preserving The Foundations Of Some Of Boston?s Oldest Buildings

    By Michael J. Atwood

    Many buildings in Boston are founded on untreated wood piles, which can deteriorate and lose their structural capacity if groundwater levels are lowered below the tops of the piles, exposing the wood

    Jan 1, 2011

  • DFI
    Bearing Capacity And Slope Instability Solved By Novel Ground Engineering Solutions

    By T. J. Snell

    Bolnore Village in Haywards Heath, Sussex, England, is a large development covering 8 to 10 hectares and expected to provide 1500 homes in five phases to assist in the continuing demand for new homes

    Jan 1, 2006

  • DFI
    Recent Developments In The Law Of Deep Foundations

    By Brian P. Waagner

    Construction law in general and the law of deep foundations in particular continues to develop rapidly, particularly in the areas of risk allocation. Public and private owners are increasingly using c

    Jan 1, 2002

  • DFI
  • DFI
    Session III - Foundation Techniques In The Urban Environment - Structural Movement And Ground Settlement Control For A Deep Excavation Within An Historic Building - Synopsis

    By Martin J. Kenwright

    Within the famous Harrods department store, a new lift shaft has been constructed, servicing a depth of 22m below ground level as well as the existing 6 storeys of the store. The shaft will connect wi

    Jan 1, 2000

  • DFI
    Railroad Bridge Approach Embankment Settlement Mitigation

    By Moi Arzamendi, Jose Ramirez, Kenneth Kniss, Sunil Arora, James Gingery

    Construction of a new approach embankment for a railroad bridge over a river in Southern California required placing up to 12 ft of fill over soft to medium stiff silts and clays along an approximate

    Jan 1, 2018

  • DFI
    Limited Access Underpinning And Re-Leveling Of A Six-Story Office Building Using Jet Grouted Micropiles

    By Tom Szynakiewicz

    Micropiles are routinely used in the United States for foundation support and underpinning applications. The high capacities achievable with the use of micropiles, combined with specialty rigs for ea