Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Electrorefining of Low-Grade Copper Alloys in Sulfamic Acid Media

    By T. Sugawara, H. Sekimoto

    Electrorefining of low-grade copper alloys containing various amounts of nickel, lead, antimony, bismuth, arsenic, selenium, silver, and gold in sulfamic acid media was demonstrated. The copper concen

    Jan 1, 2019

  • CIM
    Design of a Control Strategy for Kidd Creek Grinding Circuit Line B

    By S. Pinard, A. Desbiens, R. del Villar, D. Jakelski

    "During the fall of 1993, a new Pill-based control strategy was installed in the B grinding circuit at the Kidd Creek Division of Falconbridge Ltd. The control strategy was first evaluated on a grindi

    Jan 1, 1994

  • CIM
    Options and Challenges in Processing Cobalt from Copper-Cobalt Ores

    By B. D. H. Knights, N. B. du Preez

    The recovery of the economy of the Democratic Republic of Congo has allowed for the rapid increase in production of copper from this region, while the increased price of cobalt continues to support th

    Jan 1, 2019

  • CIM
    Automatic Particle Size and Rod Mill Tonnage Control at Craigmont Mines Ltd.

    By C. B. Webber, L. S. Diaz

    "The paper presents the approach taken by Craigmont Mines to grinding circuit control. A detailed description is given of a fully automatic control system which bases its control actions on the contin

    Jan 1, 1973

  • CIM
    When is progressive regressive?

    By Robert B. Parsons

    "New Brunswick Finance Minister John Baxter pulled something out of a hat for the mining industry in April, but there is a general concensus in the industry that he should put II back where it came fr

    Jan 1, 1984

  • CIM
    Evaluation of Spiral Performance for Processing Iron Ore from the Carol Lake Deposit of the Iron Ore Company of Canada

    By G. Chung, W. Petruk, D. Doyle

    "A series of tests was conducted on Carol Lake iron ore, which contains about 38 wt % hematite and 19 wt % magnetite, to establish a flowsheet for high weight yield by spirals. A pilot plant was run i

    Jan 1, 1993

  • CIM
    Coal Preparation Plant of Old Sydney Collieries, Limited, Sydney Mines, C.B.

    By J. A. Russell

    "UNTIL the last few years, the collieries of the Dominion Coal Company, Limited, while highly mechanized as to the cutting and transportation of the coal, still relied on the hand-loading of coal from

    Jan 1, 1952

  • CIM
    Phase Relations and Precious Metals Distribution in the Cu-Fe-S-As and Cu-Fe-S-Sb Systems Saturated With Carbon at 1473 K

    By L. Voisin, K. Itagaki

    In the reductive smelting of the copper concentrate like a blast furnace operation using coke as fuel and reductant or in processing the copper concentrate which contains coal in the bulk, a sulfur-de

    Jan 1, 2007

  • CIM
    Transportation of Gravel for Back-Fill by Branch Aerial Tram

    By W. F. J. Cosser

    AN agreement having been arrived at in 1935 whereby McIntyre Porcupine Mines would purchase gravel for back-filling purposes from Hollinger Consolidated Gold Mines, the aerial gear as described below

    Jan 1, 1938

  • CIM
    Design for Safety

    By Philip J. Bangerter, Chris Twigge-Molecey

    Design for safety is critical to metallurgical plants, due to the inherently dangerous nature of their processes. Two significant areas of concern are: 1. preventing catastrophic process failures that

    Jan 1, 2015

  • CIM
    Gas Phase Adsorption and Surface Area Determination of Minerals

    By T Salman

    The construction and use of the B.E.T. (gas adsorption) apparatus is described. Examples are given for the determination of large and small surface areas using nitrogen and krypton. Introduction A NY

    Jan 1, 1965

  • CIM
    Further Notes Concerning Ore-Shoots

    By G. Vibert Douglas

    Introduction A preliminary paper dealing with the subject of ore-shoots was presented to this Society at its Annual Meeting last year (1). The present paper records the attempts which have been made

    Jan 1, 1935

  • CIM
    Design considerations for mine waste management at the Meadowbank Gold Project

    By C. J. Clayton, A. J. Haynes, D. A. Hickson, B. Thiele

    The Meadowbank Gold Project, formerly owned by Cumberland Resources Ltd. and currently owned by Agnico Mines Ltd., is currently being developed approximately 70 km north of Baker Lake, Nunavut, in the

    Jan 1, 2007

  • CIM
    Computer Analysis of Viscosity Effects on Selection for Breakage and Breakage Distribution Parameters in the Wet Grinding of Ores (4c8c0868-8a1c-4e4d-b5e6-47bee15df76c)

    By Willie Manfrey, Richard Klimpel

    This paper describes the effects of slurry viscosity on the selection-for-breakage and breakage distribution parameters in the wet grinding of cres. A series of experimental tests were run on laborato

    Jan 1, 1977

  • CIM
    Developing an Agent Based Model (ABM) for Underground Dispatching

    By Pierre Labrecque

    Dispatch systems have been used for open pit mining since the early 1980?s but similar systems do not widely exist for underground mining. There is a need for developing dispatch systems for undergrou

    May 1, 2008

  • CIM
    Carmen De Andacollo – Start-up of Teck’s New Copper Concentrator

    By L. Torres, C. S. R. Rondestvedt, M. Bustos

    In February 2010, Teck’s newest Concentrator at Mina Carmen de Andacollo (CDA), Andacollo, Chile was commissioned. The Concentrator is a single line configuration, comprising of one 36 ft diameter x 2

    Jan 1, 2012

  • CIM
    Characterizing Internal Macropores Using Cross-Specimen Acoustic Tomography: Initial Two Dimensional Results

    By Christopher Sherman

    The engineering properties of a geologic material are greatly affected by the presence of macropores. Previous research has demonstrated that the size, location, and proximity of macropores influences

    May 1, 2009

  • CIM
    Building community relations and community development strategies from day one: A case study of the Inmet Mining/Monkey Forest experience in a complex socio-political context.

    By Craig Ford

    Inmet Mining is committed to implementing the highest corporate responsibility standards in its mining operations worldwide. Inmet is 100% owner of Minera Panama, a world-class copper project that is

    May 1, 2010

  • CIM
    B.P. Selco - Hope Brook Project Pilot Heap Leach Program

    By W. J. Witte, M. K. Witte

    "INTRODUCTION A pilot heap leach project was conducted on the B. P. Selco Hope Brook ore located in southwestern Newfoundland. The pilot heap leach was undertaken to assess and confirm the following:1

    Jan 1, 1987

  • CIM
    Adapting Duckbills to Entry Driving at Greenhill Mine

    By H. H. Gardner

    Introduction The Greenhill mine of West Canadian Collieries, Limited, is on the Alberta side of the Crowsnest pass, twelve miles from the Alberta British Columbia boundary-line. Here, five coal

    Jan 1, 1947