Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Discussion of Automatic Grinding Control Installations

    By R. J. McLeod

    "Grinding at Giant Yellowknife is done in two stages. The first stage consists of two ball mills in closed circuit will: mechanical classifiers, the classifier overflow goes to flotation. The tailings

    Jan 1, 1967

  • CIM
    The Optimization of Geochemical Exploration for Gold using Glacial Till (76195446-b504-40e7-8b58-83d87518abed)

    By M. B. McClenaghan, O. P. Lavin, Ian Nichol

    "Exploration in most areas of Canada has to contend with problems posed by glacial overburden. In many areas exploration for gold has been based on the sampling of tills, frequently by deep overburden

    Jan 1, 1992

  • CIM
    The Chuktukon Niobium-Rare Earth Metals Deposit: Geology and Technological Characteristics of the Ores

    By S. N. Kalyakin, D. S. Flett, M. A. Mulagaleeva, N. V. Gudkova, S. S. Serdyuk, V. I. Kuzmin, Institute of Chemistry and Chemical Technology SB RAS, O. A. Logutenko, V. N. Kuzmina, V. G. Lomayev

    "The Chuktukon niobium-rare earth elements ore deposit is located in Siberia (Russia). Weathered carbonatite crusts are the basis of the ore deposit. The deposit itself is 3.5 km in length, about 800

    Jan 1, 2016

  • CIM
    Ammonium Nitrate-Sulfide Reactivity at the Century Zn-Pb-Ag Mine, Northwest Queensland, Australia

    By Terry J. Briggs, Ian J. Kelso

    "Abstract- The Century mine in northwest Queensland,Australia, is a major sediment-hosted zinclead- silver orebody, located within the western Mount Isa Basin. Stratiform, carbonaceous shalehosted min

    Jan 1, 2001

  • CIM
    Complex Studies On Cu-Cake Leaching In Sulfuric-Acid Solutions

    By Shila Jafari, Mari Lundström, Aleksei Kritskii, Pia Sinisalo

    A typical process adopted at nickel plant is the processing of nickel-copper mattes and converter mattes using the following technology: pressure oxidative leaching (POX), solvent extraction (SX), ele

    Jan 1, 2019

  • CIM
    Current distribution in modem copper refining

    By D. Stone, N. J. Aslin, W. Webb

    In today's modem copper electro-refineries, increasingly higher average current densities are being employed. With these increases many refineries are approaching their limiting current density.

    Jan 1, 2005

  • CIM
    Kinetics of Gold Leaching in Alkaline Sulfide Solutions

    By S. Joshi, E. Asselin

    An electrochemical quartz crystal microbalance (EQCM) was used to study the leaching of pure gold in deaerated 1 M Na2S solution. Multiple cyclic voltammograms were measured between -0.76 and 1.242 V

    Jan 1, 2011

  • CIM
    Effect of deep cryogenic treatment on mechanical properties of A319 aluminum alloy

    By F. Khomamizadeh

    In this study, deep cryogenic treatment was applied to A319 cast aluminum samples. Although the cryogenic treatment didn't have any significant effect on mechanical properties of the well degasse

    Jan 1, 2005

  • CIM
    Involving Communities And Measuring The Impacts

    By D. M. Aloi

    In today's evolving and globalized world, mining companies are being pressured to move beyond compliance towards long-term sustainability and sustainable development. Companies are expected to "e

    Jan 1, 2007

  • CIM
    Treatment of High Iron Calcines in the Electrolytic Zinc Plant of Metallurgica Met-Mex Peñoles, S.A De C.V.

    By Claudio Rocha Rosales

    "Peñoles is a mining group with integrated operations for the smelting and refining of non-ferrous metals, and it is also a chemicals producer. Peñoles is the world’s foremost producer of refined sil

    Jan 1, 2016

  • CIM
    Sä Dena Hes Joint Venture Concentrator Operation

    By I. Orford, V. Rozon

    "The Sä Dena Hes Joint Venture Mill was designed to process 450,000 tonnes per year of ore grading 11.3% lead and 13.2% zinc.Run of mine ore is crushed in a jaw crusher and then ground in a closed cir

    Jan 1, 1993

  • CIM
    Automating Sag Mill Speed Control at Gibraltar Mine

    By Ken McClure, Alex Day

    Located North of Williams Lake British Columbia, Gibraltar Mine is the fourth largest open pit Copper mine in North America. Gibraltar commenced Copper concentrate production in 1972 with a mill throu

    Jan 1, 2019

  • CIM
    Innovative Techniques Employed to Construct Slurry Cutoff Trench for Syncrude's Beaver Creek Dam

    By Michael T. G. Brown

    Syncrude Canada Ltd. has recently completed construction of its ambitious tar-sand mining and processing facilities at Mildred Lake, Alberta. The Syncrude site is approximately 48 km (30 miles) north

    Jan 1, 1979

  • CIM
    Monarch and Kicking Horse Mines

    By Charles S. Ney

    "ZINC-LEAD REPLACEMENT deposits straddle the steep-sided valley of Kicking Horse River at a point three miles east of Field, B.c., in Yoho National Park. The Monarch orebodies extend into Mt. Stephen

    Jan 1, 1949

  • CIM
    Mine Tailings Dam Construction in Ontario

    By K. Shikaze

    "For the last three years (1967-9) the value of the output of mineral resources in the Province of Ontario exceeded one billion dollars per year. To produce this great wealth, it was necessary for the

    Jan 1, 1970

  • CIM
    Smart Technology Dust Abatement of Bulk Materials; Conveyed and/or Stockpiled, including Tailings

    By Tibor Horvath

    Dust abatement is possible on bulk materials, whether conveyed or stockpiled. Minimum (ppm) quantities of chemical additives can efficiently and rapidly control dust of conveyed substrates with no eff

    Oct 1, 2010

  • CIM
    A Dual Bound Approach To Damage-Based Finite-Element Modeling Of Tube Hydroforming

    By C. Butcher

    Numerical simulations of straight tube hydroforming of a dual phase steel were performed using both upper and lower bound constitutive models for porous ductile materials. The Gurson model is based up

    Jan 1, 2010

  • CIM
    Evaluation of Tailings Material for the Preparation of a Low Modulus High Density Backfill for an Operating Mine

    By Dirige. A. P. E.

    A study was conducted for an operating mine to determine the appropriateness of its tailings material to be used for the preparation of a low modulus, high density backfill. The research was initiated

    Aug 1, 2013

  • CIM
    New Miner Training Program

    By Denis Beaudoin

    Program Basics: Goals, Course Content & Training Process Sudbury: History of the Program & Lessons Learned Diavik: History of the Program & Lessons Learned Most Recent Program: Totten Mine in partn

    Oct 1, 2010

  • CIM
    Milling at Pioneer Gold Mines

    By Harry J. Cain

    Introduction The property of Pioneer Gold Mines of B. C., Limited, is located in the Lillooet mining district of British Columbia, on Cadwallader creek, 54 miles distant by motor road from Shalalth,

    Jan 1, 1932