Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Geomecanics Aspects of Block Cave Mine Planning

    By Enrique Rubio

    Several mining operations are currently evaluating the feasibility of changing their mining method to Block Caving. There will also be several deep low-grade ore bodies that will face the need to go u

    May 1, 2002

  • CIM
    Techno-economic feasibility of zinc and lead recovery from electric arc furnace baghouse dust

    By E. Busse, J. E. Burgener, J. G. Eacott, M. C. Robinson, P. E. Burgener

    "This paper presents a preliminary assessment of the technical and economic feasibility of a caustic leach - electrowinning process for the recovery of zinc and lead from electric arc furnace baghouse

    Jan 1, 1984

  • CIM
    Environmental improvements at Falconbridge Limited

    By G. E. Norman, R. E. Michelutti

    "One of the major objectives of Falconbridge has been and continues to be, to minimize the impact of its operations on the environment around its Sudbury operations.The approach to achieving this obje

    Jan 1, 1984

  • CIM
    Innovation and perseverance: breaking new ground in hard-rock shaft sinking in the 1990s

    By M. J. Medd, G. A. Speirs

    "This paper describes the simultaneous sinking and equipping of a 4.9 m diameter concrete-lined shaft to a projected depth of 1660 m. The shaft blast design utilizes the full face method using a paral

    Jan 1, 1991

  • CIM
    Canadian research in the areas of coal exploration, mining and preparation

    By David A. Fawcett

    "This paper presents a summary compilation of current Canadian coal research projects in the areas of exploration, mining and preparation. The compilation forms the basis for a review of present opera

    Jan 1, 1980

  • CIM
    Characterization of the gold complex adsorbed on activated carbon from chloride, cyanide and thiourea solutions

    By J .. R. Brown, G. Deschenes

    X-ray Photoelectron Spectroscopy (XPS), X-ray Diffraction (XRD) and Electron Probe Micro-Analysis (EPMA) were used to characterize chemically the gold complex adsorbed on activatedcarbon from a soluti

    Jan 1, 1993

  • CIM
    Adaptation of a friction hoist system to a drum hoist system

    By J. R. Pronovost, P. M. Tiley, D. W. Watts

    "In 1980, J.S. Redpath Limited were retained by Dickenson Mines Limited to increase hoisting capacity from 700 to 1000 tons per day. The hoisting capacity of the present skip-over-cage system could no

    Jan 1, 1982

  • CIM
    Adaptation of a friction hoist system to a drum hoist system (ClM Bullet in, November 1982)

    By J. R. Pronovost, P. M. Tiley, D. W. Watts

    "In 1980, J.S. Redpath Limited were retained by Dickenson Mines Limited to increase hoisting capacity from 700 to 1000 tons per day. The hoisting capacity of the present skip-over-cage system could no

    Jan 1, 1982

  • CIM
    Operation of the Boliden Lead Kaldo Plant for treatment of lead-bearing dust

    By Per-Lennart Nystedt

    "The Boliden Lead Kaldo Plant for the treatment of lead bearing flue-dust from the Copper Smelter and the Slag Fuming Plant has been in operation at the Ronnskar Works of Boliden Metall since the midd

    Jan 1, 1980

  • CIM
    Sedimentary exhalative (sedex) zinc-lead-silver deposits, northern Canadian Cordillera

    By R. C. Carne, R. J. Cathro

    "Most of the recent large discoveries of zinc, lead and silver in Western Canada are Paleozoic-aged stratiform deposits that occur within the limits of the tectonic sub-province of the Canadian Cordil

    Jan 1, 1982

  • CIM
    Practical application of computers in mine geology

    By E. Wright

    "INTRODUCTIONThe Ruttan Mine is located twenty-two km east of Leaf Rapids in northwestern Manitoba. The copper-zinc exhalative massive sulphide deposit is comprised of a series of individual and inter

    Jan 1, 1989

  • CIM
    Non-magnetic stainless steels for cryogenic engineering

    By H. W. King

    "Cryogenic engineering is concerned with components and machines which operate for long periods of time at temperatures within a few degrees of absolute zero. The absence of a ductile-brittle transiti

    Jan 1, 1981

  • CIM
    Crows Nest Resources' Line Creek Mine

    By Roger J. Goodman, Don Riva

    "IntroductionCrows Nest Resources Limited (CNRL), a wholly-owned subsidiary of Shell Canada Resources Limited, is nearing completion of its first coal project, located in southeastern British Columbia

    Jan 1, 1985

  • CIM
    The Kidd copper smelter and refinery description and early operation

    By C. J. Newman, D. J. Kemp, R. M. Sweetin

    "The smelter is described by area; feed preparation, continuous furnace line, gas handling and auxiliary systems, blister refining, Hazelett casting of thin anodes, and scrap remelting. Early smelter

    Jan 1, 1984

  • CIM
    The Maintenance of Mechanical Equipment

    By W. L. Stuewe

    For the purpose of this paper I shall, in order to limit myself, define the words 'Maintenance' and 'Equipment' as follows: Maintenance shall mean the 'care of or 'the su

    Jan 1, 1930

  • CIM
    Design and control of large hydraulic backfill pours

    By John D. Smith, Robert J. Mitchell

    "There is a world-wide trend toward underground bulk mining methods employing hydraulically placed backfill. This trend is recent and therefore there is little in the literature to assist an operator

    Jan 1, 1982

  • CIM
    Application of Vertical Conveyors in the Mining Industry

    By Gary M. Poxleitner

    Skip/Hoist ?Vertical Advantage of Hoist ?High capital ?High operating cost Trucks Trucks ?Flexibility of ramp ?Low capital ?High operating cost Conveyor Inclined High capital ?Low Cost to

    Feb 1, 2008

  • CIM
    Research and Development ? Attractive Tax Incentives for the Mining Industry

    By R. D. Brown

    "An adequate level of R & 0 is crucial to achieve gains in productivity and to strengthen Canada' s position in an increasingly competitive world ." So stated Finance Minister Jean Chretien in h

    Jan 1, 1978

  • CIM
    Noise Control at the Sullivan Mine

    Cominco began investigations about ten years ago relative to noise abatement in underground operations. As a result of intensive research, this study has advanced so that the practice now has wide app

    Jan 1, 1964

  • CIM
    Rhyolite geology at Kidd Creeka progress report

    By P. R. Goad

    "Kidd Creek is a large volcanogenic base metal sulphide deposit, located near the west end of the Abitibi greenstone belt, 27 km north of Timmins, Ontario. The rhyolite geology is characterized by a N

    Jan 1, 1985