Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Backfill Technology Development at Xstrata Mount Isa Mines Between 1995 and 2005By L Neindorf
The development and application of paste fill, cement slurry aggregate fill and shotcrete bulkheads at Mount Isa Mines is described. The progressive changes in filling style in the Mount Isa copper mi
Jan 1, 2005
-
Towards grade engineering using X-ray microtomographyBy K Barbosa, G Wilkie, F Reyes, V Jokovic, C Evans
The idea behind Grade Engineering is to exploit the natural heterogeneity of an orebody (spatial, temporal) in order to divert low-value waste out of the mining value chain. Essentially, this involves
Aug 24, 2022
-
Peak Gold Mine - A Different Approach to Underground MiningBy R H DAVIES
Peak Gold Mine is a new gold and base metal mining project being developed by Enterprise Metals (a 100 per cent subsidiary of CRA) at Cobar in the centre of New South Wales. The Cobar district has a
Jan 1, 1992
-
Modern Cooling Strategies for Ultra-Deep Hydropower MinesBy H E. S Moorcroft, D Scott
The increasing mining depths of South African gold mine deposits are resulting in ever-increasing heat loads associated with depth and the geothermal gradient. Together with changes in the mining hori
Jan 1, 2005
-
Synergic Effect of Collector and Frother on Froth Stability and Flotation Recovery - An Industrial CaseBy S Farrokhpay, M Zanin
Although it is well understood that in flotation collection zone and froth zone are deeply interconnected, and reagents (and in particular collectors and frothers) cannot be selected without consideri
Oct 29, 2012
-
Field Trial of CSIRO VirtuoBlast Technology at the KCGM Super Pit - Part 1: Application to Pre- and Post-Blast MeasurementBy Y Wei, P Soole
This paper gives a brief description of VirtuoBlast technology ù a new, automated and highly interactive stereo vision technology which has been developed in CSIRO Exploration and Mining. VirtuoBlast
Jan 1, 1999
-
Laboratory Testing and Stability Analysis of Paste Backfill at the Golden Giant MineBy W F. Bawden, J T. Paynter
This investigation involves laboratory testing and stability analysis of paste fill at the Golden Giant Mine. Site-cast samples are tested in unconfined, confined, and consolidated-undrained triaxial
Jan 1, 1998
-
Mass Blasting at Elura MineBy G Kennewell
At 11 am Monday 8 September 1997, the successful detonation of the 5/9 Mass Blast at Pasminco - Elura was signified by the subsiding of æMt KevinÆ (a 15 m high earth fill mound). The blast was in resp
Jan 1, 1999
-
Tunnelling Induced Ground Deformations and their Effects on Adjacent PilesBy H G. Poulos
Prediction of ground deformation caused by soft ground tunnelling is an important problem facing design engineers. The ground deformations are caused by the closure of the gap formed around the tunnel
Jan 1, 1999
-
Solution and Precipitate Equilibria in Oleate-Alkaline Earth Cation Mineral SystemsBy R O. James
The usual focus of papers on fatty acid collector action in non-sulfide flotation is on the adsorption of the carboxylate and/or neutral molecule species at the mineral-solution interface. Little atte
Jan 1, 2005
-
Extraction of 5 Orebody Crown Pillar at the Isa Lead Mine, Mount Isa Mines Limited, Mount Isa, Queensland, AustraliaBy G Varley
This paper describes the mining methods and strategy used to extract the 5 Orebody crown pillar at the Isa Lead Mine over the past five years. The bulk of the crown pillar was extracted by the use of
Jan 1, 2002
-
Improvement of Blasting Productivity at Brunswick MineBy B Ellis
Brunswick Mine is one of the largest underground zinc/lead mines in Canada, producing 3.4 million tones of ore annually. As mining activities advance to deeper levels, ground pressure also becomes gre
Jan 1, 2001
-
Platinum-Group-Metal Occurrence in New ZealandPlatinum Group metals have been known in New Zealand since the 1880's but not produced on a large scale. They have been neglected because their value was not appreciated rela- tive to gold and
Jan 1, 1987
-
Assessment of Ecotoxicology and Health Risk from Bioaccumulation in Fish of Heavy Metals and Metalloids from Historical Mine Practices in the Leichhardt River, Queensland, AustraliaBy T Huynh, V Matanitobua, J Zheng, B N. Noller, J C. Ng, H H. Harris
A risk assessment was undertaken of the aquatic ecosystem and bioaccumulation of metals and metalloids in fish at the Leichhardt River, Mount Isa, Queensland. Residual contamination of metals and meta
Jul 16, 2014
-
South Deep ù The ChallengesOver years of exploration the massive and tabular orebodies in the area to the South West of Western Areas Gold Mine had been assessed as containing about 50 million ounces of gold û a world class ore
Jan 1, 2002
-
Simulating Mine Backfill in a Fully Drained Condition Using Discrete Element ModellingBy A Karrech, A Hasan
This paper presents the numerical simulation of mine backfilling in underground stopes using three-dimensional discrete element modelling (DEM). The simulation predicts the forces exerted at the stope
Nov 5, 2014
-
Commissioning ù The Interface Between Construction and OperationsThis paper outlines the role of commissioning in the project cycle, shows how to get organised for commissioning and describes the principal commissioning activities. Emphasis is placed on appointing
Jan 1, 2005
-
Experimental and Comminution Model Framework for Secondary Fragmentation Prediction in Block CavingBy A Hekmat, R Castro, A Casali, R Gómez
Block caving is the most economic underground methods for excavating massive orebodies, due to the high productivity and low production costs. The success of block caving operations depends on the fra
May 9, 2016
-
Ore Selection and SequencingBy J E. Everett
A block model of the orebody is used to plan a mine. The first requirement is to identify ore to be extracted, discarding waste, so as to meet target grade, generally in multiple analytes. Commonly, c
Sep 5, 2011
-
Testing and Sampling Requirements for Input to Spontaneous Combustion Risk AssessmentBy B Beamish
"All underground coal mines in Australia are required to develop a Spontaneous CombustionManagement Plan (SCMP). The New South Wales Government has developed a guideline (MDG1006) to assist operations
Jun 1, 2012