    Design and Implementation of the In-the-Wall Ramp at Marvel Loch South Pit

    By K Williams

    Marvel Loch South Pit has had a number of stages of open and underground mining activities before acquisition by Sons of Gwalia. The historical pit had achieved a completed pit depth of 150 metres and

    Jan 1, 2003

  • AUSIMM
    Development of Boomtype Tunnelling Machine for Hard Rock

    By Itoh K, Sakai K, Tsuji K

    In Japan there exists a strong demand for mechanical excavation for tunnelling bacause the blasting method which produces much vibra- tions and noises is restricted in its applica- tion due to the f

    Jan 1, 1987

  • AUSIMM
    Production of Water-Soluble Phosphate Fertilizer from Christmas Island "C"-Grade Phosphate

    Christmas Island "C"-grade phosphate consists essentially of the minerals crandallite and millisite. Although containing over 25% P205, this material is not suitable for the manufacture of water-sol

    Jan 1, 1971

  • AUSIMM
    The Knelson Concentrator Applications in Australia

    The Knelson Concentrator is a centrifugal gold concentrator developed in Canada, which utilises the combination of high gravitational ("G") forces and a unique fluidising action to efficiently recover

    Jan 1, 1984

  • AUSIMM
    The Impact of Undergoing Coal Mining in Farming

    The proportion of coal production from underground operations in Queensland, is likely to increase in the future. A portion of this increase will come from mines working under farming areas. The d

    Jan 1, 1987

  • AUSIMM
    The Impact of Recycling on Process Water Quality in Mineral Processing

    By I Ametov, G Levay

    It is now common practice to use substantial amounts of recycled water in mineral processing plants to minimise both environmental discharge and withdrawal of fresh water from often limited water reso

    Jan 1, 2009

  • AUSIMM
    Overburden Preparation Moura-Kianga Coal Mines, Bowen Basin

    Quite apart from economic considerations, the following performance parameters must be considered when selecting an explosive for a particular blasting operation. 1. total energy yield/kg, and more

    Jan 1, 1974

  • AUSIMM
    Making GIS Work Like CIS (Colliery Information System)

    Spatial data processing using geographic information systems produces qualitative results which are superior to those from other existing software tools. However, the answers to various quantitative

    Jan 1, 1995

  • AUSIMM
    The Alkalic Au-Cu Porphyry Province of NSW

    By V Lickfold, A J. Crawford, A J. Wilson

    A total of 12 alkalic porphyry centres of Late Ordovician age have been discovered in two mineral districts within NSW. The alkalic porphyry deposits are hosted within shoshonitic volcanic centres tha

    Jan 1, 2002

  • AUSIMM
    Reducing Mine Closure Risks ù A Team-Based Approach

    The Closure Risk model was developed as a new tool to aid decision makers in the complex area of mine closure. It uses a simple analytical technique that allows the decision maker to simplify what is

    Jan 1, 2003

  • AUSIMM
    Technical Developments from 100 Years of Lead Smelting at Port Pirie

    This paper presents a summary of the technical achievements of the Port Pirie Smelter in 100 years of lead smelting and refining. It also aims to give where possible the reasons or circumstances th

    Jan 1, 1989

  • AUSIMM
    A New Approach to Planning New Coal-Fired Power Stations in Developing Countries

    By Walsh V

    The Australian economy has been adversely affected by the hesitation in developing countries to commit to the construction of .new coal-fired power stations. World coal trade which was expected to

    Jan 1, 1987

  • AUSIMM
    The Mt Keith Operation

    The Mt Keith Operation, 90 kilometres north of Leinster in the north-eastern Goldfields of Western Australia, was commissioned in October 1994. Based on a large tonnage, low-grade nickel sulphide o

    Jan 1, 1996

  • AUSIMM
    Application of Tailing Sand and Water as Backfill Material in Metal Mines

    By Jianmin H, Shuqin L

    This paper analyses problems associated with cement based technique in metal mines, and provides a new mining technique of packing the tailing sand and water into solidified material. In the new te

    Jan 1, 1992

  • AUSIMM
    One Character Effects on Copper Heap Leach Management

    Copper heap leaching involves both the simultaneous and sequential leaching of very large tonnages of ore over long periods of time. It is not unusual to be leaching three or four million tonnes ove

    Jan 1, 1998

  • AUSIMM
    Further Improvement to a Safe and Efficient Procedure to Blast, Excavate and Dispose of a Reactive Rock Type

    By Ash M

    The world-class iron ore mines at Mt Whaleback, Torn Price and Paraburdoo located in the Hamersley Province of Western Australia must mine the Mt McRae Shale to obtain high grade ore from the Dales

    Jan 1, 1995

  • AUSIMM
    Radio Noise Monitoring During Rock Fracture at Blast Sites

    By Thiel D. V

    It is quite well known, although not so well documented, that radio noise is generated during rock fracture. Radio noise has also been observed during severe earthquakes. The source has been though

    Jan 1, 1990

  • AUSIMM
    Mining Engineering Education in the 21st Century - Will Universe Still be Relevant

    By Roxborough F. F

    The ability of the Australian minerals industry to successfully manage the changes and challenges that face it in the 21st century depends ultimately on the quality of its human resources. Mining en

    Jan 1, 1997

  • AUSIMM
    Sampling Correctness ù A Comprehensive Guideline

    Reliable sampling practices are the key to optimising the market value of a mining or chemical companyÆs stock. As a result, reliable sampling standards are needed. However, current standards on sampl

    Jan 1, 2005

  • AUSIMM
    Strata Movement Associated WIH Longwall Mining

    By Hughson B

    A multi-wire borehole instrumentation system was used to monitor strata movement caused by a retreating longwall face at the Ellalong Colliery, situated in the Lower Hunter Valley in New South Wal

    Jan 1, 1987