Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Keeping Geologists, Production Personnel and Contractors Happy - An Integrated Approach to Blasting at Boddington Gold Mine, WABy McBride N
Location The Boddington Gold Mine (BGM) is located approximately 120 km south east of Perth, Western Australia. (Figure 1). Located within the picturesque Darling Ranges, the land was previously us
Jan 1, 1995
-
The Use and Abuse of Oriented Core in Open Pit Mine DesignBy Duran A, Eggers M. J
It is standard practice in geotechnical studies for mine design to drill a series of inclined oriented boreholes into the proposed pit walls. However, this investigation tool is often used without an
Jan 1, 1992
-
Innovative Rock Reinforcement HardwareBy Renwick MT
Two innovative ground reinforcement products have been developed for use in the mining industry. One of these products is a high strength polyethylene (HOPE) bar for use as a rib bolt in undergrou
Jan 1, 1992
-
Estimation and Reporting of Copper Ore Reserves at Mount Isa Mines LimitedIn line with the recommendations of The AusIMM/AMIC Joint Committee Report in 1981 Isa Mine ore reserves are quoted in proven and probable categories (recoverable ore reserves). Internal reporting
Jan 1, 1987
-
Modern X-Ray Diffraction Methods for Process Optimisation in the Minerals Industry û Case StudiesBy S M. C Verryn
Through the application of the Rietveld method, X-ray diffraction analysis has developed into a fully quantitative method for phase analysis of metallurgical products. The Rietveld method itself has p
Jan 1, 2008
-
Design, Development and Operation of a Hardrock RoadheaderBy Bromley JC
Eimco Great Britain, a division of Baker Mining Equipment Company, was contracted to develop a hardrock tunnelling machine in conjunction with British Coal. The objective: a machine to cut rock up
Jan 1, 1987
-
Still Pillar Mining - An Evaluation of Requirements and Techniques for Stabilisation of Bottom Slice FillBy Andersson PO
Boliden Mineral AB Boliden Mineral AB operates nine mines in Northern and Central Sweden, producing zinc, lead and silver concentrates and copper and gold. Seven of these mines use cut and fill (C&F
Jan 1, 1998
-
The Installation of a Final Cleaning Column at Ok TediBy Kilgour I
The installation of a final cleaning column at Ok Tedi Mining Limited was carried out to increase final concentrate grade in order to reduce concentrate handling, shipping and treatment charges and
Jan 1, 1991
-
Assessing the Risk of Incorrect Prediction - A Nickel/Cobalt Case StudyBy Jepsen L, Gifford M, Thomas G. S
Mine planning requires careful prediction of both the head grade and tonnage of mineralisation. As part of the planning process, operators of the Murrin Murrin nickel/cobalt orebodies (located in th
Jan 1, 1998
-
Mechanisms of Gas Movement in the Tuyere Region of Blast FurnacesBy Yaroshenko YuG, Bokovikov BA, Gordon YaM
Problems of the effect of the number of tuyeres and their parameters on the uni- formity of gas distribution are invest- igated with the use of the authors' devel- oped mathematical model of the
Jan 1, 1981
-
Processing and Potential Utilisation of Variable Grade Western Australian Diatomite DepositsThe Engineering Chemistry Division of the Government Chemical Laboratories of WA initiated an ongoing investigation into the possible utilisation of diatomites of this State. The work has shown th
Jan 1, 1979
-
Stable Isotopes and the EnvironmentWhereas traditionally, stable isotope research has been directed towards resource exploration and development, it is finding more frequentapplications in helping to assess the impacts of resource util
Jan 1, 1990
-
Harsh Prospects: Early Mining in the Northern Flinders RangesBefore the arrival of the first Europeans, Aborigines living in the northern Flinders Ranges mined ochre - an earthy form of haematite used for pigment.The discovery of copper ore at Kapunda and Burra
Jan 1, 1993
-
Sill Pillar Mining - An Evaluation of Requirements and Techniques for Stabilisation of Bottom Slice FillBy P O. Andersson
Mining of sill pillars is more difficult than the ordinary mining. The sill pillar mining is performed under more difficult conditions and the mining of the sill pillar itself produces more problems;
Jan 1, 1998
-
Reformation of the Hydraulic Stowing Mining MethodBy Bingwen Z, Fengyi K
The hydraulic-stowing mining method is most effective for mining thick coal seams. It is superior to the sliced cover- caving and artificial mining method and the fully mechanized sublevel-caving mi
Jan 1, 1992
-
Pajingo Gold Mine - An OverviewBattle Mountain Gold Company's Paj ingo Mine is the first gold mine developed by the Company in Australia. The Mine located in northern Queensland commenced operations in September 1987. The
Jan 1, 1989
-
Paper No. 126. Silver-Lead Ore Mining And The Various Systems of Stoping And Timbering Employed in Broken Hill, New South Wales.As this district is so far distant from the other mining centres and its mode of approach so circuitous, I am afraid that many residents of other portions of the Commonwealth never think of paying thi
Jan 1, 1903
-
Major Wear Parts in a Continous Copper Rod Plant and their Effect on OperationsBy Murphy MW, Klaric SD
The history, operation and design of the Secor continuous rod production process is described. The effective operation of the plant is influenced by accurate monitoring and control of molten metal pro
Jan 1, 1985
-
Ulan a Resource DevelopmentAll aspects of the development of Ulan Coal Mines are covered - from a small pit pony mine in 1975 to an efficient mechanised underground and open cut operation today.
Jan 1, 1983
-
Mineral Reserve Estimation for Project Development PurposesBy McMahon DW
The major components of a mineral reserve estimate for project development purposes are described with respect to sampling, geology, estimation methods, mining factors, metallurgical factors, envi
Jan 1, 1983