Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Neural Net for Diagnosis of Antifriction Bearings in Mining Machines

    By KeBler H-W, Seeliger A

    Vibration analysis for diagnosis of machines is a powerful instrument for condition monitoring. Especially for diagnosis of antifriction bearings various equipment and techniques have been developed

    Jan 1, 1995

  • AUSIMM
    The Solution of Ventilation Problems by Mathematical Modelling

    By Wasserman A. D

    Methodological approaches and in- vestigation results are considered in the paper of heatmass transfer processes when harmful impurities are scattered and remo- ved from chamber-like workings, of th

    Jan 1, 1988

  • AUSIMM
    Expansion at the Martha Mine, Waihi

    The Martha Mine is an open cut operation situated in the midst of Waihi town which has been operating since 1987. Since then it has produced some 700,000 ounces (oz) of gold and 4,000,000 oz of silver

    Jan 1, 1997

  • AUSIMM
    The System of Costs Keeping at The Broken Hill Junction North Mine.

    By Ross R

    Although mining is an old industry its management is quite a new science, and its complications are now being recognised as demanding expert knowledge in many branches of technical and professional ed

    Jan 1, 1911

  • AUSIMM
    Rare Earth Element Mobility in Arc-Type Volcanic Rocks

    By Smith IEM

    Some samples from arc-type volcanic suites collected in northern New Zealand and southeastern Papua New Guinea show rare earth element (REE) and Y abundances which are enriched relative to the those t

    Jan 1, 1990

  • AUSIMM
    Formalised Blasting Rules: A Case-Specific Approach

    By D Nourry

    Optimising the blast is a major issue in the blasting business. It generally means acting on the blasting pattern (drilling, charging, detonating) in order to get a given æresultÆ. This result may eit

    Jan 1, 2001

  • AUSIMM
    Evaluation of Techniques of Pillar Extraction in Thick Coal Seams and Possible Developments in India

    Traditional techniques for extracting pillars in thick underground coal seams in India are reviewed. Problems encountered are principally control of roof strata and low recovery. Recently develope

    Jan 1, 1986

  • AUSIMM
    Commissioning and Operating Experience with GekkoÆs Gold Ore Treatment Plants

    By S Gannon, J Abols, T Hughes

    In the past year, two very innovative gold ore processing plants have been designed, built and commissioned by Gekko Systems Pty Ltd. The first plant in Vietnam utilises conventional crushing and ball

    Jan 1, 2006

  • AUSIMM
    Real-Time Monitoring and Simulation Analysis of Mine Atmospheres to Locate and Characterize Underground Mine Fires

    By Laage L. W

    line fires pose a serious threat to the safety of all underground personnel. Early knowledge of the location of a fire in a complex underground mine would greatly reduce the associated risks by en

    Jan 1, 1988

  • AUSIMM
    Brown Coal Supply for Electricity Generation: Initial Operation at Loy Yang Open Cut

    By Waghorn EP, Gleeson HB

    The Loy Yang Optr, Cut is a brown coal mine bring developed in the Latrobe Valley region located some 160 kin south-east of Melbourne, Victoria. The mine has been designed to supply a mine mouth p

    Jan 1, 1987

  • AUSIMM
    Estimation of bubble size distribution and local turbulence in a bubbly flow system

    By P Ireland, S Mitra, G Evans, A Wang, M M. Hoque

    This work presents an experimental study of flow dynamics in a bubble column system (crosssection: 100 mm × 100 mm) using a non-intrusive optical technique with targeted application in a novel REFLUX™

    Aug 24, 2022

  • AUSIMM
    GRUBE-M - A Planning and Information System for Underground Mining Equipment

    By Hunefeld R

    In the field of mining engineering, design and planning are complex tasks, which require the knowledge of various engineering disciplines. GRUBE (Graphisch-RechnerUnterstiitzter BergwerksEntwurf) is

    Jan 1, 1995

  • AUSIMM
    How to Cope with Cutter Roof Problem

    This paper presents results of the experiments carried out in Beth Energy No. 33 Mine for the purpose of alleviating problems associated with cutter roof. Cutter roof problems have delayed the adva

    Jan 1, 1992

  • AUSIMM
    Versatility is the Name in Open Pit Drilling Equipment

    Traditionally, the predominant drilling method in open pit mining has been large hole rotary drilling using cumbersome, inflexible equipment offering merely limited scope for improvements in pit desig

    Jan 1, 2003

  • AUSIMM
    Some Computer and Operations Research Applications at LKAB, Sweden

    The state-owned Swedish company LKAB is one of the world's largest producers of iron ore. LKAB mines the greater part of its ore underground, and very high efficiency is vital if it is to comp

    Jan 1, 1977

  • AUSIMM
    The Main Hydrogeological Characteristics of Mineral Deposits in China

    It is very apparent that the hydrogeotogicat characteristics of mineral deposits in China be dominated by meteoric factors, terrain factors and the kind of karstic aquifers as a main source threaten

    Jan 1, 1988

  • AUSIMM
    Metallurgical Effects Associated with Use of Cemented Backfill at the Zinc Corporation Limited and New Broken Hill Consolidated Limited

    By Cusack BL

    The addition of cement to underground backfill at The Zinc Corporation, Limited and New Broken Hill Consolidated Limited, Broken Hill commenced in 1967. This resulted in a deterioration in metallurgi

    Jan 1, 1970

  • AUSIMM
    Energy Reduction at Sulphide Corporation - Two Case Studies

    By Green GR

    Description of two methods developed at Sulphide's Cockle Creek Plant as part of a site energy reduction program. The two case studies are:

    Jan 1, 1985

  • AUSIMM
    Pre-Splitting - Wall Control for Surface Coal Mines

    By Cocker A

    Pre-splitting for smooth highwall formation is conducted in around 75 per cent of surface coal operations within Australia. The CMTE (Centre for Mining Technology and Equipment) in conjunction with

    Jan 1, 1995

  • AUSIMM
    In situ analysis of steelmaking slags and mold fluxes at elevated temperatures using a remote fibre-optic Raman probe

    By R E. Gerald II, B Zhang, T Sander, J D. Smith, J Huang, R J. O’Malley, H Tekle

    In the steelmaking process, mold fluxes are essential for ensuring thermal insulation, refining, and the efficiency of continuous casting. Real-time understanding of the in-service composition of slag

    Aug 21, 2024