Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The effect of iron oxide on sulfide capacities of CaO-based molten slags

    By K Saito, M Hasegawa

    Removing sulfur and phosphorus from molten iron can be expressed by the following reactions, respectively. [S]Fe + (O2-)slag = (S2-)slag + [O]Fe [P]Fe + (3/2) (O2-)slag + (5/2) (FeO)slag = (PO43-)slag

    Jun 19, 2024

  • AUSIMM
    An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and Structures

    By L Cain, C Every, S Mirlatifi, J Ashley

    This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor

    Sep 17, 2014

  • AUSIMM
    Blast design and execution drives mine site profits

    By J Loeb, J Dampney, P Cameron

    Optimisation of Blast Design and Execution must be done right the first time. It is too late after the ore is broken. Consequences of poor design and execution negatively affect productivity from load

    Jun 22, 2022

  • AUSIMM
    Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper Operations

    By G Chitumbura

    Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu

    Mar 21, 2011

  • AUSIMM
    Learning from and managing a significant saprolite instability

    By M Bouare, C Holland, K N’Diaye

    Two adjacent open pits in Mali hosted by deeply weathered saprolitic materials were mined consecutively over the course of approximately 12 months. During excavation, both pits experienced significant

    Jun 22, 2022

  • AUSIMM
    A Case Study on the Assessment, Planning and Extraction of the Crown Pillar at Sunrise Dam Gold Mine

    By M Brockman, M Cowan, A Robeson

    "Sunrise Dam Gold Mine (SDGM) is located 820 km from Perth, 220 km from Kalgoorlie—Boulder and 55 km south of Laverton in Western Australia. The SDGM main pit had successfully operated since 1997 and

    Nov 15, 2016

  • AUSIMM
    Recovery of Gold from Gravity Tailings by Flotation

    The purpose of this study was to investigate the effectiveness of froth fl otation for the recovery of gold from the gravity tailing stream of the former Lihir Gold Limited (LGL) operation in Ballarat

    Aug 1, 2010

  • AUSIMM
    Metso SmartTag - The Next Generation and Beyond

    By K J. Riihioja, E Nozawa

    SmartTag is a radio frequency identification (RFID) based technology designed to allow tracking of ore from its source through blasting, run-of-mine (ROM) pads, crushers, intermediate stockpiles and f

    Sep 26, 2011

  • AUSIMM
    Adapting to Geotechnical Change – a Case Study of the Carina Open Pit Mine

    By R Jaine, D Strang, M Fowler

    "This paper presents a case study demonstrating active geotechnical pit slope management at the now completed Carina Iron Ore Project operated by Mineral Resources Ltd (MRL). The site is located 105 k

    Nov 15, 2016

  • AUSIMM
    Wet Grinding of ?Vanadium-Titanium Magnetite Concentrate in a Ball Mill

    By R Zhang, J Xu, X Lv, C Bai, S Zhang

    This paper studies the grinding behaviour of vanadium-titanium magnetite concentrate in a ball mill. The grinding kinetics, surface morphology, lattice distortion, wettability and moisture capacity we

    Aug 12, 2013

  • AUSIMM
    The Impact of Fluidised-bed Flotation for Treating Coarse Sulfides

    By H Thanasekaran, M J. Mankosa, J N. Kohmuench, G H. Luttrell

    "Fluidised-bed flotation has been demonstrated over the last 16 years as an effective method for improving the flotation recovery of coarse particles. This technology has been successfully deployed in

    Oct 10, 2016

  • AUSIMM
    The Geology of the Wilber Deposit, Andy Well Gold Project, Murchison District, Western Australia

    By T Wellman, G Sternadt, R Hingston

    The 335 000 oz Wilber Deposit is located within the Meekatharra-Wydgee Archaean greenstone belt in the Murchison District of Western Australia. The deposit comprises high-grade gold mineralisation hos

    Aug 18, 2014

  • AUSIMM
    Segmental Tunnel Lining Breakouts and Cross Connection Tunnels – Adelaide Desalination Plant, Australia

    By L Drowley

    The Adelaide Desalination Plant (ADP) draws raw sea water into the facility and returns saline concentrate to the Gulf St Vincent via subsea conduits. This paper describes the detailed design and cons

    Mar 8, 2011

  • AUSIMM
    Modelling of Real-time Marker Data to Improve Operational Recovery in Sublevel Caving Mines

    By A D. Campbell, G R. Power

    The increasing availability of marker data in sublevel caving operations is changing the way draw can be managed to achieve positive recovery outcomes in these mines. This paper describes how marker d

    May 9, 2016

  • AUSIMM
    RISKGATE« - A Case Study in Application to Fires on Mobile Plant

    By J Harris, P Kirsch, D Cliff, M Spinks, S Goater, D Sprott

    Fires are a common and recurrent unwanted event in the operation of open pit mines. In most cases, the causes of events such as fires are already æknownÆ but are either overlooked or not fully address

    Sep 18, 2012

  • AUSIMM
    Channel and Detrital Iron Deposits of the Flinders Mines Pilbara Iron Ore

    By A E. Petts

    Record iron ore prices and a renaissance of infrastructure in the Pilbara have Flinders Mines poised to move from explorer/developer to an iron ore producer. The potential of the company’s Pilbara Iro

    Jul 11, 2011

  • AUSIMM
    Understanding Size Effects of Semi-autogenous Grinding (SAG) Mill Operation as a Pathway to Solving Feed Disturbances – Case Study Using the MMG Century SAG Mill

    By R A. Pax, B Cornish

    "Although it is well known and easily experienced that the feed size distribution influences the throughput and stability of operation of a semi-autogenous grinding (SAG) mill, the details are poorly

    Oct 10, 2016

  • AUSIMM
    An assessment of the rate of construction of an upstream raised tailings dam

    By J J. Moreno, J Willis, P Garvey

    Many of the tailings storage facilities (TSFs) in Australia are upstream raised facilities for which the consolidation of the hydraulically deposited tailings is essential to the stability of the TSF.

    Jul 1, 2021

  • AUSIMM
    Integrated geotechnical audits and benchmarking for mining operations

    By J J. Van Wijk, A R. Penney

    Successful management of geotechnical risk at a mining operation is more than just having a good ground control management plan or using advanced numerical modelling and the latest monitoring technolo

    Nov 29, 2022

  • AUSIMM
    The Effect of Carbonate Alteration on Detrital Mass Strength and Implications for Geotechnical Slope Design

    By A Muhairini, M Eggers, J Smith, H Baxter

    Detailed geochemical analysis of cored and non-cored drill hole data was used to characterise and model the Cenozoic detrital valleys of several deposits within the southern Pilbara region, Western Au

    Jul 13, 2015