Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Case Study of Non-Mining Prediction and Control of Acid Rock Drainage ù The Vancouver Island Highway Project

    By W M. Tekano, T S. Coulter, N M. Hutt

    The Vancouver Island Highway Project (VIHP) was a $CAD 1.2 billion expenditure by the Province of British Columbia to improve travel safety and relieve traffic congestion between Victoria and Campbell

    Jan 1, 2003

  • AUSIMM
    How to Prioritise Process Improvements

    By D J. Hill

    "Mining companies routinely invest in improvements to their processing operations, but often these enhancements do not work to full effect.Improvements can be ineffectual because underlying process pr

    Sep 1, 2014

  • AUSIMM
    MMG Century Mine, A Case Study – Maximising Project Net Present Value Through Targeted Capital Expenditure and Process Optimisation Against a Backdrop of Falling Metal Prices and Feed Grades

    By R Wynn, T J. Akroyd, C Costa

    In an environment of lower zinc prices, falling revenues and reducing zinc feed grades, Century mine implemented a fast-tracked capital upgrade program in less than 15 months. The program was designed

    Sep 1, 2014

  • AUSIMM
    Selection Criteria for Open Pit Production Equipment û Payload Distributions and the æ10/10/20Æ Policy

    By R J. Hardy

    The aim of this study is to examine the volumetric and mass movement characteristics of load and haul operations using statistical modelling of relatively large samples of bucket loads that are transp

    Sep 26, 2011

  • AUSIMM
    Evaluation of Underground Mining Options at Xstrata Copper's Ernest Henry Copper-Gold Mine

    By P Christen, D R. Ashley, G R. Power

    The Ernest Henry Mine is currently a copper-gold open pit operation situated in north-west Queensland, Australia. It is owned and operated by Xstrata Copper with a current throughput of 11 million ton

    Jan 1, 2009

  • AUSIMM
    Ambient Temperature Oxidation of Enargite

    By N J Welham

    A commercial enargite concentrate was mechanically milled in inert and oxidising atmospheres for 10 hours. No substantial effect was observed in either an inert atmosphere or in air other than a broad

    Jan 1, 2001

  • AUSIMM
    Quantifying the quality of cable bolt installation by acoustic testing

    By M Hawkes, Z Ji Gang, Z Ming, R Hassell

    As underground mines become more geotechnically challenging with increasing depth and excavation size, the requirement for ground support to be installed as per design becomes more critical. The verif

    Mar 15, 2021

  • AUSIMM
    30 years of seismic system design, implementation and interpretation

    By J Player, G Sweby, S Webber, E Jones

    Seismic systems are a tool for the monitoring and forecasting the rock mass response to excavation. Common issues encountered at mine site audits and reviews are: how to design an effective seismic sy

    Nov 29, 2022

  • AUSIMM
    Reducing Mining and Mineral Processing Plant Fatality Rates

    By N Cann

    In the 10 years from 1998 to 2008 the annual number of fatalities in the Australian mining industry has plateaued (MCA, 2007-08 and abc.net.au website). Despite significant efforts to eliminate fatali

    Aug 8, 2011

  • AUSIMM
    The Geology and Genesis of High-Grade Hematite Iron Ore Deposits

    By J Mukhopadhyay, J Gutzmer

    Most world-class high-grade (60 - 67 wt per cent Fe) hematite iron ore deposits are the product of enrichment of Precambrian iron-formations but processes responsible for enrichment are still unclear.

    Jan 1, 2002

  • AUSIMM
    Dynamic Interpolation – Estimation in a Folded Environment at the Cosmo Deposit, Northern Territory, Australia

    By A Finch, C Pridmore

    The Cosmo Project falls within the Archaean to Palaeo-Proterozoic Pine Creek Orogen, one of the major mineral provinces of Australia.The Cosmo Deposit is interpreted to be a series of steep north-west

    Aug 18, 2014

  • AUSIMM
    The application of critical chain project management to sublevel open stoping at Olympic Dam

    By J Light

    Since 2019, the mine planning team at Olympic Dam has been establishing and maturing a shift from deterministic to probabilistic scheduling techniques. This paper outlines this journey undertaken by t

    Mar 29, 2023

  • AUSIMM
    Replacement of Pulverised Coal Injection (PCI) with hydrogen and its impact on blast furnace internal conditions

    By S Mitra, D O’Dea, N Barrett, T Honeyands, P Zulli

    The steel industry continues to explore and demonstrate technologies that decrease its greenhouse gas emissions, especially in blast furnace ironmaking where alternate operating conditions will be req

    Nov 8, 2021

  • AUSIMM
    Mining-RoX – Mobile Robots in Underground Mining

    By H Mischo, M Ferber, M Donner, B Jung, S Grehl, A Dietze

    Mobile robots have been making impressive inroads in a variety of domains. Within the Mining-RoX project, Technical University Bergakademie Freiberg is exploring a further frontier for mobile and auto

    Nov 4, 2015

  • AUSIMM
    Thermal analysis of molten salts and their mixtures with metals

    By S Gezgin, F Beckstein, M Müller, D Rapp, D Sergeev, J Qi, A Lichtinger

    Salts and their mixtures play an important role for industrial and energy sectors, eg metallurgy, biomass gasification and combustion, nuclear and solar powerplants and electrochemical processes. Depe

    Aug 21, 2024

  • AUSIMM
    Research Organization

    In considering the organization of research, it is necessary to know just what research is, what objects are in mind when setting out to conduct research, and what are the functional units which are r

    Jan 1, 1950

  • AUSIMM
    Waterproof Detailing in Drained and Undrained Tunnels

    By J Palise

    As cities become more populated and the need for tunnelling increases, we continue to dig deeper urban tunnels in more challenging ground conditions. At the same time our expectations for durability a

    Mar 8, 2011

  • AUSIMM
    Greater Use of Geoscan On-belt Analysis for Process Control at Sepon Copper Operation

    By T D. Jolly, L A. Balzan, A R. Harris, Z Bauk

    "The availability of real-time data in any process control system is critical for effective management of that system. At MMG LXML Sepon Copper Operation in Lao PDR, controlling the copper grade of th

    Oct 10, 2016

  • AUSIMM
    Selectively targeting hydrophobic gangue minerals at the Mount Isa Mines Copper Concentrator

    By M L. Muller, A R. O’Donnell

    The Mount Isa Mines (MIM) Copper Concentrator has an extensive history of reagent trials, with different reagents coming in and out of favour over the years. The research and use of carbon depressants

    Aug 29, 2018

  • AUSIMM
    Ground support rationalisation at Golden Grove

    By R Varden

    This paper summarises the process taken to simplify 35 ground support standards accounting for the multiple development profiles, dynamic geotechnical environment and the practical safety implications

    Mar 29, 2023