Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Methods for Evaluating Explosion Resistant Ventilation Structures

    By E S. Weiss, S P. Harteis

    The Pittsburgh Research Laboratory (PRL) of the National Institute for Occupational Safety and Health (NIOSH) has conducted full-scale explosion experiments, to evaluate the strength characteristics o

    Jan 1, 2005

  • AUSIMM
    Making use of potentially contaminating mine waste in cover design

    By N Jamson, T K. Rohde

    The Mine is an underground zinc (Zn), lead (Pb) and silver (Ag) operation in central New South Wales (NSW). Broadly speaking the Mine has two domains that require rehabilitation, the mine industrial a

    Jul 23, 2018

  • AUSIMM
    Safety Support Functions for Underground Network Communications

    By A Noack

    Today underground infrastructures, like tunnels and especially wide spread underground mines, are often equipped with ethernet based communication systems. These networks are used for the unified comm

    Sep 26, 2011

  • AUSIMM
    Leach Residue and Pregnant Liquor Separation – Process and Capital Comparison of Counter-Current Decantation and Counter-Current Washing with Vacuum Filtration

    By R Klepper

    Separation of leach residue suspended solids from pregnant liquor solution is an important step in hydrometallurgy flowsheets. Alternative flowsheet options are counter-current decantation (CCD) thick

    Aug 8, 2011

  • AUSIMM
    Managing Coal Loss Using Blast Models and Field Measurement

    By P Brown, M Nagarajan, A Green, P Dare-Bryan

    Coal loss is an important issue at many coalmines, with losses of five per cent being common. The type of loss varies from mine to mine but is dependent on mine strata, the drilling and blasting proce

    Aug 24, 2015

  • AUSIMM
    An integrated approach to mine planning – building the integrated planning model at Tropicana gold mine

    By M Kent, D Elder, J Woodward, R Edwards, B Catto

    At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine

    Sep 20, 2017

  • AUSIMM
    Quantification of surface sensor representivity of primary crushed ore for bulk ore sorting

    By J Rutter, D Francois-Bongarcon, M Federov, N Odiar, M Scott

    There are two fundamental methods for metalliferous sensing of primary crushed ore available for deployment at operations. These methods can be classed as surface measurement techniques (including XRF

    Nov 10, 2020

  • AUSIMM
  • AUSIMM
    Blast Monitoring and Blast Translation – Case Study of a Grade Improvement Project at the Fimiston Pit, Kalgoorlie, Western Australia

    By M Fitzgerald

    Fimiston Open Pit is operated by Kalgoorlie Consolidated Gold Mines (KCGM) as a joint venture between Barrick Gold and Newmont Mining. Over 110 years of underground mining resulted in the development

    Aug 22, 2011

  • AUSIMM
    Comparative Proton and Electron Probe Study of Two Representative Indium-Bearing Deposits (PACRIM'95)

    By S H. Sie, R Seetharam, K Naito, T Takagi

    Tin-polymetallic vein type deposits are one of the major source of metal producers in the Circum Pacific Belt. This type of deposit is of great importance for the modem electronics and medical industr

    Jan 1, 1995

  • AUSIMM
    Life-of-mine Development and Production Scheduling Optimisation for Sublevel Cave Operations

    By G Chitombo, A Perryman, A D. Campbell, J White, B Hollis

    This paper describes the development and implementation of an optimisation tool developed as part of the Mass Mining Technology (MMT) Project. The tool, known as the SLC Schedule Optimiser, is capable

    May 9, 2016

  • AUSIMM
    Investigations on Fume Losses at the Sulphide Corporation's Works at Cockle Creek, N.S.W.

    The paper continues an account, begun in a previous paper, of experimental work carried out by the author whilst a member of the metallurgical staff at the Cockle Creek Works. The general method of th

    Jan 1, 1925

  • AUSIMM
    Vertical and inclined raise bore performance at Dugald River mine

    By M Lee, J F. Carswell, G Reitsema

    "The increased costs of underground mining have continually challenged engineers to identify opportunities for alternatives to common approaches to underground development. Considerations to the desig

    Oct 16, 2017

  • AUSIMM
    Measuring the Effectiveness of Change through Best Practice Reconciliation

    By G Pattenden, R Hargreaves, P Pettit

    "Even with the cyclic nature of mining, when it comes down to it, the bottom line is that whatever direction the commodity market is going there is always a desire to improve the economics of an opera

    Nov 15, 2016

  • AUSIMM
    Recent improvements in the milling circuit at Tropicana mine

    By G R. Ballantyne, B Putland, I Lovatt, M Di Trento

    The Tropicana Gold Mine, owned by AngloGold Ashanti Australia Ltd (70% owned and managed) and Independence Group NL (30%) is located 330 kilometres east-northeast of Kalgoorlie, Australia, in the newl

    Sep 11, 2017

  • AUSIMM
    Selection and Planning of Fully Mobile In-pit Crusher and Conveyor Systems for Deep Open Pit Metalliferous Applications

    By M Dean, M Nehring, P Knights, M S. Kizil

    Integrated continuous mining techniques such as fully mobile in-pit crusher and conveyor (FMIPCC) systems offer inherent labour, energy and environmental benefits to deep pit metalliferous mines. Howe

    Nov 4, 2015

  • AUSIMM
    Mine geology standardisation – providing the foundation to consistent short-term geometallurgical product predictions in a complex multimine and supply chain environment

    By B L. Sommerville

    "The theme of this International Mining Geology Conference is ‘Setting New Standards’. Rio Tinto’s iron ore operations include a complex integrated supply system to deliver ore from 15 mine operations

    Sep 20, 2017

  • AUSIMM
    Effect of Mineral Density for Milling Magnetite Ores

    By P Holtham, W Valery, P Baguley, A Jankovic

    There is a growing interest in magnetite ores because of the increasing demand for this commodity. With these ores, there is significant cost associated with milling the ore to fine sizes using ball m

    Jul 13, 2015

  • AUSIMM
    High Energy Bulk Explosives and Mine to Mill Focus – the Mt Rawdon Story

    By D Morton, G Wallace

    "Evolution Mining is the sole owner of the Mt Rawdon open cut operation, located 75 km south-west of Bundaberg in Queensland, Australia (Figure 1). It is a massive, volcanically hosted, low-grade gold

    Nov 15, 2016

  • AUSIMM
    Iron Ore Washing – Achieve More with Fewer Resources

    By M Zlatev, S Silge

    Producers of primary resources such as iron ore face the challenge of processing crude materials with increasing levels of impurities, which may result in the requirement for wet processing. This resu

    Jul 13, 2015