Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Floatability Characterisation Test Rig as a Pilot Plant for Flotation Testing ù An OperatorÆs Viewpoint

    By J-P Franzidis, M Esvelt, E V. Manla

    The Floatability Characterisation Test Rig (FCTR) is a self-contained, highly instrumented, mobile pilot plant that is able to treat up to 2 tph solids. It consists of a bank of six 130 L WEMCO« Smart

    Jan 1, 2003

  • AUSIMM
    Activities of components in Ca2SiO4-Ca3P2O8 solid solution at 1573 K

    By K Saito, M Hasegawa

    In steelmaking processes, it is known that P2O5 in dephosphorisation slags often exists in solid solutions between Ca2SiO4 and Ca3P2O8, <C2S-C3P>SS, and thus the solid solutions play an important role

    Aug 21, 2024

  • AUSIMM
    Gold Mining South Australia The First Fifty Years

    By Fradd WP

    South Australia pioneered metal mining in Australia and was the main source of copper for several decades. Gold discoveries and mining also contributed significantly to the development of the Colo

    Jan 1, 1987

  • AUSIMM
    Outside the Dyke Bulge - The A1 Gold Mine Extension, Gaffneys Creek, Victoria

    By D J. Clark, R F. Wright, M D. Goodz

    The A1 Gold Mine is a Devonian-age narrow vein high-grade gold deposit located 115 km east of Melbourne. The mine operated almost continuously from 1861 to 1992 producing 442 334 ounces of gold (13.8

    Jan 1, 2009

  • AUSIMM
    Longhole Open Stoping Practice in 'B' Lode at New Broken Hill Consolidated Limited

    Longhole open stoping was introduced in the zinc-rich &apos;B&apos; lode at New Broken Hill Consolidated Limited (NBHC) during 1968. Since then one longitud- inal and a series of transverse longhole

    Jan 1, 1971

  • AUSIMM
    Rehabilitation at Strongman Mine, West Coast, New Zealand

    Coal mining ceased at Strongman Mine this year after 70 years of production. Underground mining finished in 2003 and opencast methods began in 1998. During the life of the mine, 8 million tonnes of co

    Jan 1, 2006

  • AUSIMM
    Exploration Possibilities for Diamonds in Victoria

    Diamonds occur in N.S.W., Victoria and north west Tasmania. Diamonds from different areas appear to have their own characteristics, lending weight to the suggestion that three or four different sou

    Jan 1, 1979

  • AUSIMM
    Optimisation of Installed Mill Power Post-installation of Secondary Crushing Circuit at Northparkes Mines

    By F Kock, Y Sulianto, T Trott, B G. Putland, D Morgan

    "Northparkes installed and commissioned a secondary crushing circuit in 2010 to debottleneck the semi-autogenous grinding (SAG) mill constrained grinding circuits. Following further improvements to th

    Oct 10, 2016

  • AUSIMM
    Filtration Test Work – Extracting the Whole Story for Studies and Design

    By G Bickert

    Australia is currently developing and engineering a range of specialised processing options for rare earth (RE) (Lynas, 2011, Alkane, 2005), zirconia (Alkane, 2005), lithium (Galaxy Resources, 2008) a

    Aug 8, 2011

  • AUSIMM
    Gold Room Procedure at Lake View and Star, Ltd.

    Recovery of gold by smelting zinc dust concentrate has been carried on at Lake View and Star, Ltd., since July, 1930, when the Merrill-Crowe precipitation plant was first put into operation.Part I des

    Jan 1, 1948

  • AUSIMM
    The application of digital twin machine learning models for Mine to Mill and Pit to Plant optimisation

    By X Hu, Z Pokrajcic, R Embry, P C. Stewart, J Carpenter, E Jones

    Whilst the value of Pit to Plant and Mine to Mill optimisation has been proven since the 1990s, sustaining the productivity and efficiency gains typically requires ongoing test work, blast trials, pla

    Jun 22, 2022

  • AUSIMM
    Analysis of Longwall Shields and their Interaction with surrounding Strata in a Deep Coal Mine

    By Hendon G. W, Carr F, Jiang Y

    A vast majority of the operating longwall sections use shield-type face supports to provide ground control in the United States. As a co-operative research program between the University of Alabama

    Jan 1, 1992

  • AUSIMM
    Mine rockfall and rock wall failures – proven digital laser-based approach for monitoring slopes at the Kanmantoo Copper Mine

    By J Herrmann, J Richards, B Hutchison

    An extensive trial of laser-based survey and monitoring systems at Hillgrove Resources Kanmantoo Copper Mine in the Adelaide Hills, South Australia, has proved the capabilities of the system in monito

    Nov 30, 2018

  • AUSIMM
    The Use of High-Water Rapid-Solidifying Material as Backfill Binder and its Application in Metal Mines (81971fc4-4a86-4ab3-9271-1e5b157046a8)

    By Yucheng H, Baogui Y, Wenyong L

    High-water rapid-solidifying material, called &apos;high-water material&apos;, is a new material developed by the authors over many years. The material can solidify nine times its volume of water in

    Jan 1, 1998

  • AUSIMM
    Production Drill Optimisation at Telfer Underground - A Move Towards Automation

    By P F. Knights, P Boniwell

    This paper investigates the causes of low effective utilisation of the production drill fleet at the Telfer Underground Gold Mine, as measured by the percussion hours per shift. The first part of this

    Jan 1, 2008

  • AUSIMM
    Open Pit Strategic Mine Planning with Automatic Phase Generation

    By M Recabarren, A Echeverria, J Ronda, J I. Guzman, R Dodds, G Juarez, E Vila-Echague

    A strategic mine plan is a fundamental part of any mining operation. It must provide a realistic and operative extraction and processing schedule, and yield the highest value for the business. For ope

    Nov 24, 2014

  • AUSIMM
    TBM Design and Performance of Today - A Rapid Development - Where Will it End?

    The last decade has seen a very rapid development in TBM tunnelling. Some trends are purely technical or economical and others relate more to preferences of different interests. Power levels have more

    Jan 1, 1993

  • AUSIMM
    Parallel Implementation of a Tabu Search Procedure for Stochastic Mine Scheduling

    By R Dimitrakopoulos, R Senécal

    This paper presents a metaheuristic solution to the optimisation of open pit long-term production scheduling with a stockpile and geological uncertainty. The optimisation formulation is a two-stage st

    Nov 24, 2014

  • AUSIMM
    Rethinking variogram modelling

    By A Boucher, M Baudin, P Androszczuk, I Minniakhmetov, A Rigby, P Machado, M Wright, B Van Dijken

    IGO Ltd’s (IGO’s) Nova Operation (Nova), which is 160 km east-north-east of the town of Norseman in Western Australia (WA), mines and processes nickel-copper-cobalt (Ni-Cu-Co) sulfide ore from the mag

    Mar 22, 2022

  • AUSIMM
    Rethinking Merit for a Sustainable Mining Industry

    By K Hobbs

    Mining is experiencing a difficult period of low profitability and declining productivity. To achieve sustainability, mining companies are challenged with improving output, quality and safety while de

    Jun 22, 2016