Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Approaches to the Simulation of Compositional Data – A Nickel-Laterite Comparative Case Study

    By K G. van den Boogaart, U Mueller

    "An accurate prediction of benefit for some types of ore may require not just the ore grade, but a whole compositional characterisation of the estimates; that is, its full mineral composition includin

    Nov 24, 2014

  • AUSIMM
    Removal of phosphorus and gangue minerals from iron ore by a combined approach of alkaline drying and reverse flotation

    By A Batnasan, K Haga, A Shibayama, K Higuchi, H Takeuchi

    High silica (SiO2), alumina (Al2O3), and phosphorus (P) contents in iron ore adversely affect the quality of iron products. The removal of those impurities from iron ore is an essential point in furth

    Sep 18, 2023

  • AUSIMM
    Can biocements stabilise tailings storage facilities?

    By G Simpson, S Dressler, A E. Levett

    Tailings storage facilities often represent a mining operation’s most significant liability, posing serious environmental, social and safety risks. Almost all mining operations dispose of wet tailings

    Aug 2, 2023

  • AUSIMM
    Management and Treatment of Wastewater in Hunan's Nonferrous Mines in China

    By Chunbao Z, Zhenchuan Z

    As known to the international mining sectors, Hunan province, called as ' Nonferrous Native Area ', is the main base of nonferrous metals Pro- duction in China. There are over 194 nonferrou

    Jan 1, 1988

  • AUSIMM
    Modern Technology Applied to Wirebar Casting

    By Hunter T. C

    The wirebar furnacing and casting facility commissioned in 1970 at Copper Refineries Pty. Ltd. (CRL), Townsville, comprising a 70 tonne/ hour ASARCO shaft furnace and a Walker type casting wheel, c

    Jan 1, 1977

  • AUSIMM
    Computer Modelling Techniques and their Application to mine Evaluation and Operation

    By Stokes WPC

    The capital requirements to develop a new mining venture are becoming very large; amounts of the order of US$1,000 million are not now unusual among estimates to bring new mining complexes into pr

    Jan 1, 1980

  • AUSIMM
    A Case Study in Optimising Fragmentation

    By R Crookes

    Mine to mill optimisation is not a recently developed concept. It is one which is finally gaining greater acceptance in the Australian mining industry, possibly as a consequence of the downturn in mar

    Jan 1, 1999

  • AUSIMM
    Compositions, Log Ratios and Bias - From Grade Control to Resource Definition

    By C Ward, U Mueller

    Compositional geostatistics is an approach developed to ensure that the constant sum constraint induced by geochemical iron ore analysis is respected in estimation and simulation. Jack-knifing and cro

    Aug 12, 2013

  • AUSIMM
    The Logical Development of Longwall Mining in the Bowen Basin

    The late 1960's and 1970's saw the initial development of the coal resources of the Bowen Basin of Queensland. The projects developed relied on large scale, open-cut operations using draglin

    Jan 1, 1985

  • AUSIMM
    Longitudinal and Torsional Displacements of Winding Ropes

    Hoisting ropes are constructed of wires and strands positioned helically around the axis. This helical positioning causes that, in the rope loaded at the end with the weight Q, the longitudinal dis

    Jan 1, 1995

  • AUSIMM
    The Discovery and Development of Uranium in Australia

    There are a number of factors affecting the discovery and develop- ment of uranium in Australia which makes this mineral almost unique and quite different from other minerals. I. The role of the Aust

    Jan 1, 1988

  • AUSIMM
    Exploration and Development History of the Batman Gold Deposit, Mt Todd Project, Northern Territory

    The Mt Todd Project is located 42 km northwest of Katherine in the Northern Territory. The identified mineral resource estimate for the Batman gold deposit is 66.7 million tonnes (Mt) grading 1.4 gr

    Jan 1, 1994

  • AUSIMM
    The Lake Rotokaua Sulphur Deposit

    The Lake Rotokaua sulphur deposit, near Taupo, New Zealand, is a lacustrine sedimentary ore body, 220 acres in area and from 7 ft to 96 ft thick, containing, within the area drilled to date, some 20

    Jan 1, 1971

  • AUSIMM
    Komatiite-Hosted Nickel Sulphide Deposits, Honeymoon Well, Western Australia

    By Woodhouse M, Drew GJ, Andrews DL

    The Honeymoon nickel sulphide deposits are located 45 km south of Wiluna in the 2.7 Ga old Agnew-Wiluna greenstone belt in the NE of the Yilgarn Craton (Figure 1). Both disseminated and massive nic

    Jan 1, 1996

  • AUSIMM
    Ventilation and Refrigeration Design for the Access and Ore Production Decline to the Deep Copper Orebody at the Mount Isa Mine

    By Nixon C. A

    The exploration of Mount Isa Mines' new copper source will require the development of a five kilometre 4.7 x 5.5 metre blind decline commencing 1000m below the surface and extending to 1600m

    Jan 1, 1988

  • AUSIMM
    Cover Grouting for Development Headings at The Jarrah Decline, Boddington Gold Mine

    Jarrah Decline is currently the only underground operation at the Boddington Gold Mine, (BGM). The mine is located 120 km SE from Perth in WA, with mineralisation hosted within deeply weathered felsi

    Jan 1, 1990

  • AUSIMM
    The Development and Operation of a Continuous Tapping Lead Blast Furnace at Port Pirie

    On the 17th November, 1964, a new No., 2 lead blast furnace was blown in at Port Pirie. The furnace departed from previous designs by incorporating a centrally located continuous tapper for both l

    Jan 1, 1975

  • AUSIMM
    Segregation Roasting of Nickel Oxide Ore

    By Svensson J

    The nickel segregation process is one of the methods for treating nickel oxide ores. In this process nickel oxide ores are heated together with a small amount of the carbonaceous reductants and hal

    Jan 1, 1980

  • AUSIMM
    Lihir Gold Five Years On ù Maximising Throughput and Capital Utilisation

    During the first five years of operation, the Lihir gold mine has steadily increased plant throughput rate to over 4 Mtpa, well above the original design capacity of 2.8 Mtpa. Understanding how future

    Jan 1, 2003

  • AUSIMM
    Underground Auxiliary Ventilation Monitoring and Diagnostic System

    By S Viviers, G Ratner

    Ventilation is part of all underground mine operations and is undertaken in order to introduce fresh, cool air to the workings and to remove stale, affected air. It is problematic to obtain efficient

    Jul 1, 2013