Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Development of a Pyrite Regrind Circuit at Telfer Gold Mine

    By D R. Seaman, Y Peng, F Burns, D J. Bradshaw

    Telfer Gold Mine is a gold-copper mine in the eastern Pilbara of Western Australia, owned and operated by Newcrest Mining Limited. TelferÆs ores are processed by a dual train, 21 Mt/a, concentrator wh

    Oct 29, 2012

  • AUSIMM
    Transforming dust control – lessons from tunnelling

    By A De, B Palmer, rade, P Stowasser, A Fanning

    Mining and tunnelling share many commonalities (eg confined working environments, excavation equipment and processes), but of significance is an overarching commitment to provide safe work conditions

    Apr 16, 2024

  • AUSIMM
    NO2:NOx Ratios in Australian Road Tunnels

    By P Gehrke, S O’Gorman

    The precise measurement of NO2 was historically difficult in road tunnels, hence criteria and design analysis was based on converting from NOx concentrations via a set NO2:NOx ratio. The reliable dire

    Sep 17, 2014

  • AUSIMM
    The Importance of Data Collection to the Blasting Process

    By J Hutchings

    An essential component to the management of any process is the measurement of key parameters, used to monitor, control, and provide the feedback necessary for improvement. This paper discusses how dat

    Nov 8, 2011

  • AUSIMM
    Mining at the Redross and Mariners Nickel Mines

    By D Will

    RedrossThe Redross orebody averages 1 m wide, has a strike of 50 - 350 m, dips at 55° and has a basalt footwall and an ultramafic hanging wall. The most successful and innovative aspects of mining Red

    Mar 21, 2011

  • AUSIMM
    Footwall Stability at the LKAB's Kiruna Sublevel Caving Operation, Sweden

    By C DahnTr-Lindqvist

    The Kiruna mine produced about 19 Mt processed iron ore in 1999 using sublevel caving. General failure in the hangingwall has been widely studied and its mechanism is rather well understood. Failure i

    Jan 1, 2000

  • AUSIMM
    Recent advances in tailings testing methods

    By D J. Williams

    The majority of surface tailings storage facilities continue to employ sub-aerial tailings slurry deposition. Surface TSFs are typically sized and operated in a way to minimise the initial capital cos

    Jul 23, 2018

  • AUSIMM
    Integration of Geoblast and D&B Engineering as an engineering tool in PT. Indo Muro Kencana

    By H Utama, hi, A Suw

    PT. Indo Muro Kencana (PT.IMK) is gold and silver mine located in Central Kalimantan province, Indonesia. Mining activities in PT.IMK is conducted in Bantian pit area by applying surface mining method

    Nov 29, 2022

  • AUSIMM
    Integrated Optimisation of Grinding and Flotation Circuits

    By P Holtham, K C. Runge, E Tabosa

    Traditionally, comminution and flotation have been surveyed, analysed and optimised separately. This often results in less than optimal outcomes because of the complex interactions between the two pro

    Sep 1, 2014

  • AUSIMM
    Improving Energy Efficiency Across Mineral Processing and Smelting Operations - A New Approach

    By B L. Coulter, E Wightman, A S. Burrows

    With their commitment to sustainable development in an increasingly carbon-constrained world, many resources companies are focused on reducing the energy required to create their final products. In pa

    Jan 1, 2009

  • AUSIMM
    Topsoil Management for Long-term Mine Operation and Closure – A Case Study from Alcoa's Bauxite Mining Operations in South-west Australia

    By A Grigg, L Hackett

    Alcoa operates two bauxite mines at Huntly and Willowdale, located within the jarrah forest south-east of Perth in Western Australia. Ore reserves are shallow but extensive, and mining pits averaging

    Jul 16, 2014

  • AUSIMM
    Wallaby - The Horizontally Challenged Opportunity

    Barrick Gold Granny Smith Mine is currently undergoing conversion from an open cut operation to an underground mine at the Wallaby deposit. The underground project commenced in 2005 with the developme

    Jan 1, 2008

  • AUSIMM
    Reducing the Effect of Wind on Airblast Measurement During Blasting

    By K Henley

    One of the greatest practical difficulties of measuring airblast occurs when a significant wind is blowing onto the microphone. Small windscreens are usually used to mitigate the wind noise on the mic

    Aug 24, 2015

  • AUSIMM
    Improvements on Estimation Tools and the Effect on Mineralisation Base Definition on the Zulti North Heavy Mineral Sand Deposit, Richards Bay, Kwa-Zulu Natal, South Africa

    By J M. Nel

    Richards Bay Minerals (RBM) has recently undertaken an exercise to improve orebody basal definition. Older mineralisation bases (pre-2005) were highly erratic using old protocol reverse circulation (R

    Oct 5, 2011

  • AUSIMM
    Maximising the value of a drilling program – case study in a challenging environment

    By A A. Latscha, D O’Connor

    Increasing orebody complexity, restrictions in ground access, and longer lead times for disturbance approvals, have generated the need for the Resource Development Team within Rio Tinto Iron Ore (RTIO

    May 24, 2023

  • AUSIMM
    Potential and limitations for sensor-based particle sorting of gold ores – experiences on sensor-based particle sorting piloted for SAG pebbles

    By A Kobzev, C Robben

    Sensor-based particle sorting of gold ores is the masterclass of preconcentration. The technical challenges of a grade in ppm scale makes a direct detection with currently available technology in mill

    Nov 10, 2020

  • AUSIMM
    An Integrated Approach to Proactive Tailings Management

    By T Huynh, K Tungpalan, E Wightman, M Edraki, S Palaniandy

    Most preventive environmental management practices promote proactive integrated approaches to waste management. For example, life cycle assessment is often used to find the ‘hot spots’ of environmenta

    Jul 27, 2015

  • AUSIMM
    Preconcentration in the pit – size matters

    By T BoBo, D La Rosa, P Cameron

    Efficient pre-concentration using natural and induced deportment starts with effective blast design. Leveraging these characteristics using Size-Based Grade Engineering® techniques requires detailed u

    Nov 10, 2020

  • AUSIMM
    Mine Shafts – Planning, Optimising and Constructing

    By D J. Kilkenny

    Work practices involved in shaft construction can be aligned with current industry standard operating practices. However, the working environment during conventional shaft construction introduces uniq

    Mar 21, 2011

  • AUSIMM
    The Integration of Geometallurgy with Plant Design

    By G Harbort

    Traditional engineering design for flotation circuits use the “Rule of Thumb” approach. Typically this uses a nominated maximum head grade for design. A scale-up factor is applied to laboratory flotat

    Aug 8, 2011