Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The R67 Refrigeration Plant at Enterprise Mine, Mount Isa ù The WorldÆs Largest Bulk Air Cooler

    The 3.5 million tones per annum Enterprise mine is the newest underground copper mine at Mount Isa in northern Australia. At a depth of up to 2000 metres, it is the hottest and deepest mine in Austral

    Jan 1, 2002

  • AUSIMM
    The Scratch Test – An Attractive Method to Measure the Strength of Iron Ore Material

    By L Mariano

    Three selected iron ore samples from the major bedded and channel iron deposits of Western Australia were analysed using a scratch test commonly used in the oil and gas industry. The portable commerci

    Jul 11, 2011

  • AUSIMM
    Performance and Acceptance Testing of Mine Refrigeration Plants

    There is an increasing demand for refrigeration as mines progress deeper. Mine refrigeration plants have special requirements in terms of their duty and application. There are no national or internati

    Jan 1, 2005

  • AUSIMM
    Distribution of impurity elements in oxygen-enriched top-blowing nickel smelting with Fe extraction-oriented slag adjustment

    By Y Cui, G Cao, H Zong, J Zheng, J Wang, S Yue, J Zhao, B Li

    The iron (Fe) concentration in nickel slag is high, making its recovery and utilisation a hot and challenging topic. In the nickel smelting process, using CaO instead of SiO2 to adjust slag’s composit

    Jun 19, 2024

  • AUSIMM
    Application of normative ore mineralogy to geological and metallurgical data sets at the Hera Au-Pb-Zn-Ag mine, New South Wales, Australia

    By A R. McKinnon

    The recently opened Hera Au-Pb-Zn-Ag mine in central New South Wales has provided an ideal opportunity to demonstrate the calculation of sulfide ore mineralogy using normative methods. Normative miner

    Sep 20, 2017

  • AUSIMM
    The Changing Commodity Supply Demand and Price Outlook

    At the outset, I guess we should define what we mean by "com- modities". In the 20 minutes or so which I have for this paper, it is impossible to tackle all commodities -one would need to con- sider

    Jan 1, 1988

  • AUSIMM
    Application of RISKGATE to Coal Mine Tailings Dams

    By M Gasparon, J Harris, T Baumgartl, D J. Williams, M Edraki, P A. Kirsch, D Rowe

    RISKGATE, an Australian Coal Association Research Program-funded (ACARP) initiative, has been designed to assist the Australian coal mining industry in improving minimum standards for safety performan

    Jul 16, 2014

  • AUSIMM
    Improving Blasting by a Team Approach at the Henty Gold Mine

    By R Wedmaier

    Henty Gold Mine is an underground operation producing 100 000 ounces of gold per annum. The original mining method used was flatbacking with paste fill. However, a non-entry method û uphole benching û

    Jan 1, 2001

  • AUSIMM
    Stope Performance in Challenging Ground Conditions: Observed Versus Predicted - A Case Study

    Throughout the study phases (scoping, prefeasibility and feasibility) of new mining projects one is forced to work with and make predictions based upon limited date obtained from diamond and reverse c

    Nov 25, 2010

  • AUSIMM
    Geotechnical Challenges for Underground Commercial Space and Quarrying in Australia

    By A B. Bayooke, A C. Robertson

    In terms of underground tunnelling in metres advance per capita, Australasia compares well with the best world performers. This is because of the large number of metalliferous mines, coalmines and civ

    Nov 5, 2014

  • AUSIMM
    Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted Annulus

    By M Norbert, P Mok

    The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double

    Sep 17, 2014

  • AUSIMM
    Potential of the Overburden Cast Blasting Technique in Indian Surface Coalmines – A Modular Approach and its Financial Implications

    By M D. Uttarwar, R R. Yerpude

    India is the world’s third-largest producer of coal and is endowed with the fifth-largest coal reserves in the world. Surface mining straddles the entire domain of the Indian coal mining industry, yie

    Aug 24, 2015

  • AUSIMM
    Subtek™ 4D™ – Optimised blasting performance through the application of new underground bulk explosive technology

    By B Taylor, S Evans

    Bulk explosive technology for underground mining has not seen any significant technological advances since the widespread transition from ammonium nitrate fuel oil (ANFO) to ammonium nitrate emulsions

    Sep 1, 2024

  • AUSIMM
    The Casposo Gold-Silver Project – Process Selection and Design

    By D Connelly

    Silver and gold bearing ore from the Troy Resources NL Casposo Gold-Silver Project, located within the San Juan Province of Argentina contains a complex mix of gold, silver, electrum and silver sulphi

    Aug 8, 2011

  • AUSIMM
    A Review of Prediction Methods for Ground-Borne Noise Due to Tunnel Construction Activities

    By D Davis

    The prediction of ground-borne noise levels from tunnel construction activities requires knowledge of the input vibration forces from the vibration source(s) into the cutting face, knowledge of the vi

    Mar 8, 2011

  • AUSIMM
    Simulation of Flexible Circuits

    By MáAndrusiewicz, M M. Hilden, M S. Powell, P D. Kay, B Foggiatto

    Circuits with unconventional and potentially more complex designs are predicted to become more common in the future as plant designers and operators look to process ores more efficiently. Ideas have b

    Oct 29, 2012

  • AUSIMM
    Selecting Suitable Methods for Treating Mining Effluents

    During operations, mining and metallurgical processes may generate effluents such as tailings water, acid mine drainage (AMD) and seepage and process acid streams. Depending on the type of ore and the

    Jan 1, 2006

  • AUSIMM
    Stope Design Within a Final Pillar Retreat Sequence at Xstrata Copper's Mount Isa Copper Mines

    Xstrata CopperÆs Mount Isa Copper Operations is located in mineral rich north-west Queensland and is one of the largest sources of copper in the world. This world-class underground operation is planne

    Jan 1, 2007

  • AUSIMM
    Study on Improving Roasting Behaviours and Metallurgical Properties of Brazilian Hematite Pellets by Adding Magnetite with High Sulfur Content

    By Z Li, J Pan, D Zhu, W Zhou

    In order to enhance the roasting behaviours and metallurgical properties of hematite pellets, which have the problems of high roasting temperature and low compressive strength, a process of producing

    Aug 12, 2013

  • AUSIMM
    PC-BC: A Block Cave Design and Draw Control System

    This paper presents an overview of a program PC-BC developed for application to the design and evaluation of block cave operations. Conventional mine planning software tools are not well suited to the

    Jan 1, 2000