Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Preliminary Safety Analysis for the Connection of a Thermal Oxidiser to a Working Coal Mine

    By D Cork, R Peet

    "Methane is a signifi cant greenhouse gas. Methane is released from coal seams during the mining process, both in surface and underground operations. This uncontrolled release is termed æfugitive emis

    Jun 1, 2012

  • AUSIMM
    Development – Back to Basics

    By I T. Ross

    In the last 50 years there have been tremendous improvements in equipment used in development on underground mines. Compressed air powered jacklegs have been replaced by high powered electro-hydraulic

    Mar 24, 2014

  • AUSIMM
    Reducing the Cost of Tunnel Design in Australia

    By B Rouvray, R Bertuzzi

    The development of a design-and-construct tunnelling project in Australia from its concept to its construction requires designs to be prepared and reviewed at several distinct stages prior to document

    Sep 17, 2014

  • AUSIMM
    Collaboration and change management, keys to successful automation implementation

    By D Kilkenny, D Nardini, P Kline

    This paper is a case study highlighting learnings and success in two areas challenging underground miners: change management and collaboration. It examines the implementation process of a new automate

    Mar 15, 2021

  • AUSIMM
    The Use of Geotechnical Instrumentation to Optimise an Engineered Mine Design at Beaconsfield Gold Mine, Tasmania

    By P B. Hills, R J. Walton

    Geotechnical instrumentation has been implemented as a key step for monitoring and optimising an engineered mine design for managing seismicity at the Beaconsfield Gold Mine. Measurements of displacem

    Jan 1, 2008

  • AUSIMM
    Conceptual Design of a Dry-stacked Coal Rejects Facility in a Subtropical Climate

    By A M. Barrett, P J. Chapman

    As filtering technology improves and there is an increased focus on environmental impacts, the concept of managing fine coal rejects by filtering, mixing with coarse rejects and dry stacking them is b

    Jul 27, 2015

  • AUSIMM
    Unlocking value in drill and blast at Olympic Dam – Lime 390 case study

    By P Vaikkattil, K Li, J Bullock

    Unlocking maximum value is essential when designing a stope and the associated drill and blast packets. This is becoming increasingly important at Olympic Dam as the operation continues to expand sout

    Mar 15, 2021

  • AUSIMM
    Increased drilling accuracy leads to significant improvement in ore recovery and dilution

    By R Stimpson, B Johnson, B Hesse

    During a period of twelve months between FY18-19, a series of trials were conducted to compare production drilling accuracy using two different methodologies, and the subsequent impact this had on sto

    Mar 15, 2021

  • AUSIMM
    Patron's Address

    I was delighted to be invited to be patron of this Joint Conference, but the challenging task you have set yourselves, and your speakers' depth of expertise, deny anyone, even the patron, the

    Jan 1, 1978

  • AUSIMM
    Minimum sample mass from reverse circulation grade control drilling at Rocklands copper project

    By M G. Hawtin

    The Rocklands copper project is a multilode, iron oxide copper gold (IOCG) + cobalt mineralised system located in the Eastern Fold Belt of the Mt Isa Inlier. Rocklands orebodies cover a range of oxida

    Sep 20, 2017

  • AUSIMM
    The Challenger Gold Mine

    By M Sandy, P Bamford

    The Challenger Gold deposit was discovered in 1995 by Dominion Mining Ltd in a remote western area of the Gawler Craton in South Australia. Mine development commenced in 2002 with initial production f

    Jan 1, 2008

  • AUSIMM
    Improving coal quality estimations using geostatistics and auxiliary variables

    By P Dowd, R Jeuken, C Xu

    In Australian coalmines there are a number of coal quality parameters that are measured by analysing samples from boreholes. The data points are used to generate spatial models of these parameters, ty

    Sep 20, 2017

  • AUSIMM
    Dust Mitigation - Changing the Paradigm

    By J Visser

    Dust mitigation has long been seen as nothing more than managing a nuisance issue, but the reality is that poor dust management can lead to one or more of the following negative consequences: an incre

    Aug 12, 2013

  • AUSIMM
    Field Measurement of Transient Pore Pressures within Co-disposed Processing Rejects Placed in a Spoil Dump

    By R Van Laeren, G Langerak, S Fityus, K Koosmen

    Co-disposal of partly-dewatered mixed-plant rejects (MPR) from coal processing into spoil dumps is gaining favour amongst Australian coalmine operators in preference to conventional tailings disposal

    Jul 27, 2015

  • AUSIMM
    Characterisation of Long-Term Scaling Effects of Ceramic Filter Media Used in the Dewatering of Iron Ore

    By R Salmimies

    Choosing a ceramic capillary action filter is often favoured in processes where low energy consumption is important, such as the dewatering of iron ore. In addition, the performance of the filter medi

    Jul 11, 2011

  • AUSIMM
    Geology, Mineralisation and Potential of the Clogau St DavidÆs Mine, Dolgellau Gold-Belt, Gwynedd, Wales

    By I M. Platten, S C. Dominy

    The Clogau St DavidÆs gold mine has a recorded production of around 81 000 oz Au and it is the largest mine in the Dolgellau gold-belt and BritainÆs most prolific historical producer. The original min

    Mar 26, 2012

  • AUSIMM
    Modelling multi-seam interactions for longwall mining

    By A Lines

    This paper addresses a gap in longwall multi-seam interactions and their predictions, providing a case study for future multi-seam operations for both anticipated conditions and a method for understan

    Nov 30, 2018

  • AUSIMM
    Decoupling the pulp and froth effect of ultrafine particles on Itabirite iron ore flotation

    By B McFadzean, N P. Lima, D A. Deglon

    The reverse flotation of Itabirite iron ore is typically performed after a desliming step in which most of the sub-10 µm particles are removed. This is done to limit processing problems such as poor f

    Aug 24, 2022

  • AUSIMM
    Closure Cost Estimation - All Things to All Men?

    By H Jones

    Closure cost estimates may be generated at any stage of a mining operationÆs life; commencing with the initial prefeasibility studies and continuing through to the final decommissioning cost estimates

    Nov 20, 2012

  • AUSIMM
    Design Developments of the Jameson Cell

    By S Bourke, R Stone, B Hill

    Since Jameson Cell flotation technology was first installed in a coal flotation application in 1988/89 at Newlands Coal Handling and Preparation Plant (CHPP) there have been fundamental improvements t

    Jan 1, 2005