Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Design and Construction Contract C916 Beauty World Station and Tunnels, Singapore

    By R McDonough

    DTL2 contract C916 was awarded in March 2009 for S$340 M. This contract includes two mass rapid transit (MRT) 1100?m long bored tunnels using two slurry tunnel boring machines (TBMs), with an internal

    Sep 17, 2014

  • AUSIMM
    Seismic Stability Analysis of Sangan Iron Mine Project Tailings Dam

    By N Ganjian, A Delavar, F Rashidi Nejad

    Iran is one of the most seismically active countries in the world, being crossed by several major fault lines that cover at least 90 per cent of the country. As a result, earthquakes in Iran occur oft

    Jul 27, 2015

  • AUSIMM
    Transition of mechanical cooling refrigerants

    By T Roberts

    The transition of mechanical cooling refrigerants from their inception in the 1800s through to the current day has been driven by several factors. Original refrigerants such as sulfur and carbon dioxi

    Oct 12, 2022

  • AUSIMM
    Kempfield Silver, Barite and Base Metal (Pb-Zn) Deposit, Lachlan Orogen, Eastern Australia

    By D Timms

    The Kempfield deposit is located in the Hill End Trough, one of several intracratonic basins developed during Silurian–Devonian time, in the eastern province of the Lachlan Orogen, Eastern Australia.T

    Aug 22, 2011

  • AUSIMM
    Exploration and Mining Unified through Seismic Imaging

    By J Dwyer, G Turner, D Pridmore, M Urosevic

    Due to their ability to produce high-resolution images of the subsurface to great depths, seismic surveys provide critical inputs to almost all oil and gas exploration projects. However, with some not

    Nov 4, 2015

  • AUSIMM
    Use of alternative drilling technologies during diamond drilling activities at Ernest Henry Mine – a fractured aquifer case study

    By E Philippa, J Vitanza, C Hawtin, B Miller

    B Miller , E Philippa , C Hawtin and J Vitanza

    Mar 22, 2022

  • AUSIMM
    Controlled Blasting for Civil Construction in an Urban Environment

    By R Domotor

    Brisbane’s Airport Link is Australia’s largest road infrastructure project, worth a total value of A$4.8 billion. The project is using surface and underground blasting to excavate hard volcanic r

    Nov 8, 2011

  • AUSIMM
    Algebraic optimisation of excavation alignment using the stress tensor

    By P B. Hills

    A simple algebraic method of aligning large scale underground excavations such as a crusher station or workshop or indeed any large cavern or mine layout to the optimal stress condition is outlined. T

    Nov 29, 2022

  • AUSIMM
    Evaluation of sustainability of copper production value chain from ore to metal using advanced simulation

    By A Remes, A Dennis, M Talikka, T Kotiranta, S Horn

    A mine project combines vast amounts of information from various disciplines including but not limited to geology, mining, metallurgy, technology, environment and economics. In many cases, all relevan

    Jul 25, 2018

  • AUSIMM
    The Preparation of Pastefill and its Use at Some Canadian Mines (6e4bc1a5-4335-470a-b421-2dd830dbe3e2)

    Two key elements in the design of a pastefill or high density hackfill system are the preparation of the backfill material and its distribution underground. This paper examines these two areas. Owin

    Jan 1, 1998

  • AUSIMM
    The Use and Optimisation of Ferrous Feed at the Whyalla Blast Furnace

    By G Caddy, M Middleton, S Kerec, R Keil, J Tsalapatis

    Arrium’s OneSteel Whyalla Steelworks in South Australia is a fully integrated plant which operates a single blast furnace. The key operational objective has been to maintain high process availability

    Jul 13, 2015

  • AUSIMM
    Iron Ore Characteristics and their Application in Optimising the Granulation Process

    By R Zhang, X Huang, M Zhou, X Lv, C Bai

    Iron ore sinter accounts for a large proportion of blast furnace ferrous burden in Chinese steel mills. Depleting high-grade iron ore resources and spreading complexity of iron ores in mineralogy and

    Aug 12, 2013

  • AUSIMM
    Building Sustainability Into a Project

    Organisations are starting to develop processes for achieving sustainability principles they have defined for their organisation. The foundation for these principles is now well accepted. The definiti

    Jan 1, 2004

  • AUSIMM
    Geoscience 2033 – a vision for mineral exploration in ten years

    By C Itotoh, K O’Halloran, L Karlson

    Global methods used to explore for minerals have progressed relatively slowly since the development of the first diamond core drill in 1863. Since then, key developments such as wireline geophysics (1

    Sep 18, 2023

  • AUSIMM
    ‘We’re Metallurgists, not Magicians!’

    By E McLean

    The decision making check-list and hierarchy of information for process and plant design is generally wide-ranging and complex. The nature of grades, mineralisation and ore types in an ore body, its

    Aug 8, 2011

  • AUSIMM
    Cable Tunnel Ventilation

    By P Ridley

    EnergyAustralia’s Sydney Central Business District (CBD) cable tunnel network will form a loop 6.2 km in length. The 3.2 km long, 3.5 m, diameter city east cable tunnel (CECT) currently in design, wil

    Mar 8, 2011

  • AUSIMM
    Public reporting – new standards or no standards?

    By J Coombes, R Sterk

    The efficiency of the Australian and New Zealand stock exchanges relies on a fully informed market: shareholders and investors are fully and transparently informed of all material information relating

    Sep 20, 2017

  • AUSIMM
    Geological Setting of Eliwana and Flying Fish Deposits along the North Limb of the Brockman Syncline, Hamersley Province, Western Australia

    By S Robinson, R Perkins, D Barrett, D Kepert, C Fowers

    The discovery and delineation of significant mineralisation in the Eliwana region continues Fortescue Metals Group’s strong exploration success. In the decade after the first hole was drilled into Chr

    Jul 13, 2015

  • AUSIMM
    Dreams of Futures Past – Curating Post-mining Landscapes

    By P A. Kirsch, A Hine

    Mining is a major global industry that requires the moving of considerable volumes of earth and rock (overburden) to win the valuable ore prior to mineral extraction and processing. As a result of thi

    Jul 16, 2014

  • AUSIMM
    Conclusions from long-term cover system performance monitoring – a case study

    By R Barritt

    Remedial options for a waste rock dump (WRD) were considered as part of closure planning studies at an active mine in Western Australia. To minimise the impact of any seepage from the landform it was

    Jul 25, 2018