Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mine Real-Time Personal Respirable Dust and Diesel Particulate Matter Monitoring

    By H W. Wu, T Harvey

    An overview is given of two new developments in mine atmospheric monitoring. A new personal dust monitor (PDM) that gives real-time respirable dust readings is discussed. The unit is mounted within th

    Jan 1, 2008

  • AUSIMM
    The Methodology Behind the Development of the Vera/Nancy Mine

    Within ten months of the first significant intersection on the Vera deposit, approval was given to proceed with a $28.3 M underground development of the Vera-Nancy gold mine. Contrary to what the time

    Jan 1, 1998

  • AUSIMM
    Assessment of Robertson (2010a) CPTu state parameter inversion method within Been et al. (1987) CPTu inversion parameter framework

    By K Smith

    This paper presents an assessment of the Robertson (2010a) method within the CPTu inversion parameter framework of Been et al. (1987), using CPTu calibration chamber data presented by Jefferies and Be

    Jul 1, 2021

  • AUSIMM
    Extraction and Characterisation of Extracellular Polymeric Substances from the Mineral Surface During Bioleaching of Chalcopyrite Concentrate

    Extraction and Characterisation of Extracellular Polymeric Substances from the Mineral Surface During Bioleaching of Chalcopyrite Concentrate A mixed culture of moderately thermophilic microorganisms

    Sep 13, 2010

  • AUSIMM
    Volcanogenic Massive Sulfide Deposits in New Zealand

    By R L. Brathwaite

    In New Zealand, volcanogenic massive sulfide (VMS) deposits are found in three main geological environments associated with: 1.   ophiolitic basalts of Oligocene age in Northland and East Ca

    Jan 1, 2005

  • AUSIMM
    Management of Mining Wastes in European Union and Developments in Turkey

    Management of Mining Wastes in European Union and Developments in Turkey

    Sep 13, 2010

  • AUSIMM
    Towards an Integrated Framework for Asset and Process Health Monitoring and Optimisation on a Milling Circuit

    By G T. Jemwa, F Rousseau, F J. Wolfaardt, J A. M Rademan, P W. Smit

    Mining companies are increasingly faced with the challenge of reducing operating costs while maximising throughput and profitability. At the same time, the grade and quality of treated ores are becomi

    Sep 26, 2013

  • AUSIMM
    The Use of Comminution Testwork Results in SAG Mill Design

    The relationship between comminution testwork results and the milling circuit that is subsequently selected is not a direct one and frequently involves recourse to databases of past test results. This

    Jan 1, 2002

  • AUSIMM
    New Perspectives on the Busang Gold Fraud

    The gold salting fraud at Busang on the island of Kalimantan, Indonesia was exposed in early 1997 and resulted from the independent drilling, sampling and assaying of PT Freeport Indonesia which repor

    Jan 1, 2002

  • AUSIMM
    The Performance of Trial Covers Used for the Rehabilitation of Acid Generating Coal Reject Dumps in Northern Kwazulu-Natal, South Africa

    By N Bezuidenhout

    The performances of ten field-scale experimental final covers were evaluated over an eight-year period. The covers were evaluated as part of the rehabilitation of acid generating coarse coal reject du

    Jan 1, 2003

  • AUSIMM
    Multiple Land Use

    During the middle of this century, exploration and mining reached a low ebb in New Zealand. Tas McKee did his utmost to rejuvenate the mining industry, using the latest technology and an understanding

    Jan 1, 1987

  • AUSIMM
    Optimum Equipment Management Through Life Cycle Costing

    Large mining operations need equipment that consistently performs as expected. The most effective way of ensuring this is to have a defined life cycle with an optimised maintenance strategy. The deter

    Dec 6, 2010

  • AUSIMM
    Achieving High Flotation Recoveries from Browns Polymetallic Ore

    By G Hayes

    Ore from the Browns deposit near Batchelor, in the Northern Territory of Australia, is a fine-grained polymetallic sulfide ore hosted in graphitic black shale. Minerals of economic significance are se

    Jan 1, 2002

  • AUSIMM
    Investigation of Thick Coal Seam Mining Potential in Australia and Results of Preliminary Study for æLongwall Top-Coal CavingÆ Method

    By Y Cai, B Hebblewhite

    In this paper, the Australian thick coal seam underground mining potential is highlighted and the characteristics are investigated by analysing a thick seam database. It is clear that thick coal seam

    Jan 1, 2002

  • AUSIMM
    Efficiency improvement of Jalal Abad beneficiation plant by concentrate quality enhancement and tailings recovery

    By M Lak, R Amiri, A Haratian, M Asghari, S Haji

    In recent years, due to advances in designing of various magnet assemblies, a wide range of magnetic materials with different properties can be concentrated. Jalal Abad iron ore beneficiation plant, w

    Nov 8, 2021

  • AUSIMM
    Climate Risks to the Australian Mining Industry - A Preliminary Review of Vulnerabilities

    Future climate variability and change will impact on mining operations and their attendant communities. To minimise this impact, early and informed risk management is warranted. However, research into

    Jun 1, 2010

  • AUSIMM
    Production and Ventilation Management Towards in Integrated Mine Information System

    By Ward M

    The current and future requirements for an underground mine information management system are being met with a flexible, value-engineered approach to mine information/communication infrastructures.

    Jan 1, 1995

  • AUSIMM
    Optimisation Opportunities for High Pressure Grinding Rolls Circuits

    By B Davis, A H. Benzer, A N. Mainza, C M. Evertsson, L M. Tavares, M M. Hilden, M S. Powell, C Rule, G Asbj÷rnsson

    The Mogalakwena North Concentrator of Anglo Platinum Operations was built with the capability to allow for future projected expansion. Several research groups, currently working with Anglo American on

    Oct 29, 2012

  • AUSIMM
    One Mile Underground – Mining the N3500 Orebody at Mount Isa Mines

    By I Özen, G Chitumbura

    A paper identifying anticipated challenges in the extraction of the N3500 Orebody at Glencore Xstrata Copper’s Mount Isa Copper Operations was written in 2007. The paper identified the depth of the de

    Mar 24, 2014

  • AUSIMM
    Veinlike Uranium Deposits in the Rum Jungle Area-Geological Setting and Relevant Exploration Features

    By Borshoff J, Coles R

    The Rum Jungle Uranium Province is lo cated on the western margin of the Pine Creek Geosyncline approximately 60km south of Darwin. Uranium was discovered in the Embayment area (Whites Deposit) in

    Jan 1, 1984