Design And Construction Of A Cut-Off Wall In Warm Permafrost
By Steven L. Anderson
A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5
Jan 1, 2010
-
Grouting Methods Involved in Stabilization of TBM Tunnel near CP-06, UAA-04, Chennai Metro
By Yeruva Ramanareddy, Sohail Wajid, Ahmed Shaz, K. Bhavani
"CP-06 is an NATM cross passage which connects up-line and down-line metro tunnels near Kilpauk Medical College, Chennai. It lies completely in loose silty sand to dense sand with water table almost t
Jan 1, 2017
-
Installation, Design, And Quality Control Of Augercast Piles ? Introduction
By William J. Neely
Augercast piles are formed by drilling a continuous-flight auger into the ground and, on reaching the required depth, sand-cement grout or concrete is pumped down the hollow stem as the auger is withd
Jan 1, 1990
-
A Need To Reevaluate Attitudes In Engineering And Construction
By d&apos, E. Appolonia
A construction project is successful when all parties contributing to it are winners. It is not a success when there are winners and losers. Contractors, engineers, suppliers and equipment developers
Jan 1, 1985
-
Proof of Bearing Capacity of Anchors on the Example of Innovative Anchor Monitoring System
By Stephan Großwig, Karolina Nycz, Arne Kindler
"Commonly used anchor monitoring systems are mainly based on the use of anchor force meters. However, experience shows that the reliability of the display of force meters lowers over time. Other measu
Jan 1, 2017
-
Cut-Off Walls For Diamond Mining In The Arctic
By Wolfgang G. Brunner
A 3800 m long temporary water-retaining dike has been constructed under extreme conditions in the harsh northern climate to enable two of the kimberiite pipes at the Diavik Diamond Project reserve to
Jan 1, 2003
-
Experiences With A New Type Of Displacement Screw Pile - Synopsis
By William Van Impe
A most renewing and promissing soil displacement screw pile is called the O-pile. The O-screw pile is a soil displacement auger pile based on a screwing in - screwing out procedure. The displacement a
Jan 1, 1996
-
Micropiles To Support Electric Power Transmission Towers
By Wendy L. Mathieson
The Bonneville Power Administration (BPA) will build about 500 miles of new 500-kV transmission lines in the next 5 years. Many new lattice towers will be built in remote locations or in environmenta
Jan 1, 2004
-
111,000m Of Continuous Flight Auger Piling For LNG Tank Bases In Poor Alluvial Soils, Isle Of Grain, UK
By Shane Baker
Cementation Foundations Skanska Ltd encountered many significant challenges in designing and constructing the foundations for the LNG (Liquefied Natural Gas) tanks and associated structures at the Isl
Jan 1, 2006
-
Effective Analysis Of Soil-Pile Interaction Under Dynamic Loads
By Inn-Joon Park
Major problems associated predicting soil-structure interaction behavior are based on the fact that soil is neither homogeneous nor elastic and soil properties are spatially variable. There also exist
Jan 1, 2002
-
Rigid Inclusions For Soil Improvement In A 76 Building Complex
By Walter I. Paniagua
A housing complex of 76 buildings is being constructed in the city of Morelia, in western central Mexico; the buildings are 5 levels high, with a shallow concrete slab foundation. Soil conditions incl
Jan 1, 2008
-
Measured And Predicted Response Of Laterally Loaded Piles - Synopsis
By K. Mallikarjuna Rao
There are several methods available to estimate deflection and ultimate Capacity of laterally loaded piles. In this investigation an attempt has been made to verify the existing methods for prediction
Jan 1, 1996
-
Conventional And Box-Shaped Piled Rafts
By Heinz Brandl
Box-shaped pile and diaphragm wall foundations have proved suitable for transferring heavy loads of bridges, power plants, tanks, towers or other buildings in a concentrated form into the ground. The
Jan 1, 2002
-
Vibration-Free Driven Tubular-Piles
By S. Doombos
To convert the railway-bridge across the Oude Maas between Dordrecht and Zwijndrecht into a vertical lifting bridge, a drastic adaptation of the existing piers is necessary. Extra piles have to be pla
Jan 1, 1989
-
Little Britain Project: Construction Of Basement
By R. H. Wright
This paper describes the design philosophy and methods employed in constructing the foundation elements for the Little Britain Project in the City of London. The Contract is a design and construct pac
Jan 1, 1989
-
International Workshop On Micropiles ? September 26-28,1997 - Title ? Table Of Contents - First International Workshop On Micropiles September 26-28,1997
This Workshop was held at the Doubletree Inn, Seattle, Washington from September 26 to 28, 1997. Run under the auspices of the Deep Foundations Institute (DFI), it was co-funded by the newly formed Ja
Jan 1, 1997
-
Oakland Airport Roadway Project - Synopsis
By David S. Yang
The construction of Oakland Airport Roadway Project for the airport expansion requires stabilization of subsurface soils for the construction of three grade separation structures at two roadway interc
Jan 1, 2001
-
Vibwall Installation - Cardiff Bay Barrage ? Synopsis
By Graeme McWhirter
This paper discusses the Installation of a Vibwall for the Cardiff Bay Barrage Project Wales, UK, by Kvaerner Cementation Foundations. Only the second use of the technique in the UK the wall was succe
Jan 1, 2000
-
Foundation Reuse And Strengthening Works At 65 And 67-69 Whitfield Street, London
By Shields H. Arup
The paper describes the innovative foundation reuse and strengthening works for two buildings in Central London. A 1950s building on piled foundations (65 Whitfield St) and a 1930s building (67-69 Whi
May 1, 2022
-