Application of Non-Destructive Testing to Drilled ShaftsTechnically speaking, the concept of NDT sounds like the "magic bullet" when faced with a questionable drilled shaft. All the Contractor or Engineer needs to do is select an NDT method, apply it, unde
Jan 1, 2004
-
Incorporating Site Variability into LRFD Design of Pile FoundationsBy Murad Y. Abu-Farsakh, Md Habibur Rahman
The properties of all natural soil deposits are highly variable, and they are rarely homogeneous. Cone penetration tests (CPT) were used to assess the site variability, which was then incorporated in
Sep 8, 2021
-
Experiences And New Developments In Offshore FoundationBy Franz-Werner Gerressen
As alternative energy industries pick up speed internationally, and as government regulation and restriction limit the use of impact hammers due to environmental limitation from construction induced n
-
Experiences and New Developments in Offshore Foundation (610f0063-3ba0-451b-bb8c-dc3962343edb)By Leonhard Weixler, Jean Wehbe, Gordian Ulrich, Franz-Werner Gerressen
"As alternative energy industries pick up speed internationally, and as government regulation and restriction limit the use of impact hammers due to environmental limitation from construction induced
Jan 1, 2017
-
Cooling Water Intake Shafts for the Oak Creek ExpansionBy Edward Jacobsen, Patrick J. Lydon
"The ongoing expansion of the Oak Creek Power Plant in Oak Creek, Wisc., includes a tunnel bored in rock that connects to four vertical intake shafts approximately 1.5 miles (2.4 km) offshore in Lake
Jan 1, 2008
-
Slurry Trench Design and Construction in Difficult Conditions (5812dfc0-6c6e-4d3d-988d-069d8f606655)By Peter Deming
"PART 1 OF 2INTRODUCTIONSlurry trenches are the least cost hydraulic barrier available, if the excavated spoils can be recycled into backfill. As such, slurry trenches are constructed where possible,
Jan 1, 2006
-
Analysis of Panel and Pile Verticality and Overlap in a Project Information Management SystemBy Jamey Rosen, Georgette Hlepas
Verticality data collected from panel and pile elements of seepage barrier walls describe the shape and position of those elements in three dimensions. These data are used to determine if a barrier wa
Sep 8, 2021
-
Deep-Sea Quay Wall for Offshore Wind Energy Terminal on Maasvlakte 2 Rotterdam – NLBy Patrick van der Schaaf
"During 2016, foundation piling works were completed to allow for the construction of a production and storage/handling terminal in Rotterdam. It is there that steel foundations will be produced for o
Jan 1, 1900
-
Seismic Stability Analysis of Seepage Control Measures for Levees in Central Valley, CaliforniaBy Zia Zafir
"Levees in the central valley of California are primarily for flood control purposes and thus are subjected to infrequent hydraulic loading. The primary concern for these levees is their instability d
Jan 1, 2016
-
Vibrations Caused by Pile Driving (bb4f9935-841f-4be3-bb1b-f95875d26e25)By K. Rainer Massarsch
"Part 1 of 2 By K. Rainer Massarsch, Geo Engineering AB, Stockholm, SwedenINTRODUCTIONConstruction activities, such as driving of piles and sheet piles, soil compaction or excavation generate noise an
Jan 1, 2004
-
Washington Avenue Tunnel Project: Fortifying Aging Underground InfrastructureBy Andrew R. Klaetsch, Peter W. Deming
"The Washington Avenue tunnel in Kingston, NY was completed in 1912 to convey combined storm water and sanitary sewage. Over a mile in length, the tunnel was driven almost entirely in bedrock, with th
Jan 1, 2016
-
Innovative Soe Solutions For Shaft Construction: Getting To Depth With Diaphragm Walls At Westerly Storage TunnelBy Ryan Sullivan, Lisa Smiley, Jewels Stover
The Westerly Storage Tunnel (WST) Project is part of Project Clean lake, the North East Ohio Regional Sewer Dist years. When completed in 2020, WST will be nearly 2 miles of 25-ft diameter tunnel 200-
-
Switching From Monetary Process Management To Critical Success Factors Using An Appropriate Process Information SystemBy Jochen Maurer, Dr. Christian Hoyme, Dr. Hans Regler
Currently, it is very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. As a rule, companies depend on reports from on-site e
-
Design And Field Comparison Of Ground Improvement And Bored Piles For Large Diameter Steel Water TanksBy Vijaya Bhushan Rao, Ali Semercioglu, Jason Redgers
Large diameter steel water tanks with high storage capacities impart heavy loads deep into the ground, generally requiring deep foundations to adequately support them. The use of ground improvement as
Oct 1, 2022
-
Slurry Wall Design for Construction Using Soil Structure InteractionBy Nino Catalano, Meeok Kim, Gordon Chen
"The design of the below grade structure of Brigham Building for the Future (BBF) included three different areas to provide power generation and medical facilities as well as a parking garage. The thr
Jan 1, 2017
-
Corrosion Protection Of MicropilesBy Racquel Nottingham, Marc Mastrantuono
Micropiles often provide a favourable solution for many deep foundation problems especially when significant site constraints such as confined construction sites or vibration limitations have been ide
Oct 1, 2022
-
Screening Tool for Impact Hammer SelectionBy Gerald Verbeek, David Tara
"When selecting an impact hammer to drive a particular pile, the decision is often based on local experience. In those cases, the contractor falls back on previous experience or draws on the experienc
Jan 1, 2017
-
Applications of Nondestructive Testing Methods for Mass Foundation Blocks - Feasibility StudyBy Hamed Layssi, Farid Moradi, Thomas Tingson
This paper describes the feasibility and pilot study of of using existing non-destructive testing solutions for evaluating structural integrity and mechanical performance of mass concrete foundations.
Sep 8, 2021
-
Ethical and Risk Aspects of Deep Foundation SubcontractsBy Alexander Filotti, Richard Kalson
"In the last decade, the construction industry has witnessed significant changes in the project delivery systems and contractual relationships between the general contractors (GC) and Deep Foundation
Jan 1, 2016
-
Friction Loss in Tieback Anchors used for Landslide StabilizationBy John P. Turner, Benjamin J. Turner
"Tieback anchors are now used routinely for landslide stabilization in the USA and abroad. It is generally understood by design engineers that friction loss over the unbonded length of a tieback ancho