Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Back Caving Mechanism and Preventive Measures for Deep Open Stopes ? Case Studies

    By Jerry Ran

    Stope back caving in a mine using open stope mining interrupts the planned mining sequence and causes oversize muck and dilution with adverse economic implications. As many underground mines are minin

    May 1, 2004

  • CIM
    Les Mines INMET Division Troilus - Objet: Extension de la vie des godets des excavatrices DEMAG.

    Les Mines Inmet ? La Division Troilus exploite une mine d?or à ciel ouvert depuis 1996 et produit un concentré de cuivre. La Division Troilus est localisée à 175 KM au nord de la ville de Chibougama

    Feb 1, 2008

  • CIM
    Robust image segmentation technique for rock fragmentation analysis

    By G. K. Mann

    Fragmentation analysis of blast or crushed rock material is a time-consuming and costly process. During the last two decades, the mining industry has been investigating image-based analysis systems as

    Jan 1, 2006

  • CIM
    Developing Breakthrough Solutions to Complex Metallurgical Problems

    By B. K. Gorain

    "Mining of low grade deposits along with the necessity to design and operate process plants requiring high throughputs presents unique metallurgical environmental and sustainability challenges that ne

    Jan 1, 2015

  • CIM
    Updating the Lucky Friday Mill – Experiences in Revamping a Historic Milling Operation

    By Dale Dean, Bill Hancock, Raul Mondragon, Carlos Aguilar, Chris Martin

    "In 1942, commercial mining operations began in what is now the Lucky Friday Ag/Pb/Zn mine in Idaho’s Silver Valley. Wholly owned since 1962 by Hecla Mining Company, the mine has produced more than 14

    Jan 1, 2011

  • CIM
    Making money from wastes: a custom circuit within Clarabelle Mill

    By Alain Bouchard, Germain Labonté, Jim Barrett

    "Mill feed materials that are not run-of-mine ore are often a challenge for mineral processors and tend to accumulate in stockpiles, where they remain unprocessed for many years and become “slow movin

    Jan 1, 2002

  • CIM
    Overview of Lake Shore Gold’s 2012 - 2013 Bell Creek Mill Expansion

    By D. B. Felsher

    "Lakeshore Gold’s Bell Creek Mill is located in Timmins, Ontario. The mill has been in operation since 2009 and has undergone several small expansions since then. In 2012 - 2013 the first major mill

    Jan 1, 2015

  • CIM
    Mapping mining-induced subsidence from space in a hard rock mine: Example of SAR interferometry application at Kiruna mine

    By E. Henry, C. Mayer, H. Rott

    Hangingwall deformation monitoring at Kiruna mine is a major concern for Luossavaara- Kiirunavaara AB (LKAB) since underground production is deepening toward the town of Kiruna. In the quest for more

    Jan 1, 2004

  • CIM
    Coordination Guidelines for Virtual Design and Construction

    By Anoop Sattineni

    Over the past decade the use of BIM in the AEC industry has grown several fold and with it the number of standards available for implementing BIM. The ?National BIM Standard? by buildSmart Alliance, t

    Aug 1, 2013

  • CIM
    Numerical Modelling of a Brazilian Disc Test of Layered Rocks using the Combined Finite-Discrete Element Method

    By O. K. Mahabadi

    The scope of this study is to simulate the behaviour of a layered rock sample under standard laboratory Brazilian Disc test using an innovative combined finite-discrete element method (FEM/DEM) resear

    May 1, 2009

  • CIM
    Marked Ball Wear Testing

    By G. D. West, J. D. Purdue

    "Marked Ball Wear Testing (MBWT) employs identified grinding balls which are placed in an operating mill for a period of time, retrieved from the mill, and then measured to determine the amount of wea

    Jan 1, 1991

  • CIM
    Flotation as Part of Grinding Classification Circuits

    By M. Tarvainen, J. Kallioinen

    "Depressed metal prices coupled with increasing production costs have presented a great challenge for operators to control and reduce the costs of production to maintain profitability. Depleting ore r

    Jan 1, 1984

  • CIM
    Long-term planning at Raglan (b8ce356e-c666-4ad8-a03a-11ba76659079)

    By L. W. T. Weitzel

    "This paper reviews the Falconbridge- SMRQ’s Raglan project in northern Quebec and the process that was used in developing its current long-term mine plan. Challenges were many and not only limited to

    Jan 1, 2003

  • CIM
    Effluent Treatment Practice at the David Bell Mine

    By A. N. Veltmeyer

    "INTRODUCTIONTeck-Corona Operating Corporation's David Bell Mine is located 35 Km east of Marathon, Ontario. In conjunction with its 1000 tonne per day gold concentrator, the company operates an efflu

    Jan 1, 1989

  • CIM
    An Instrumented Laboratory Cell for Gold Cyanidation Modelling

    By M. Kane, B. Bissonnette, D. Hodouin

    "A laboratory cell has been designed for a careful investigation of gold ore cyanidation using mathematical modelling of the process kinetics. The cell is a stirred vessel with continuous monitoring a

    Jan 1, 1990

  • CIM
    Value Based Grinding Circuit Control

    By M. H. Moys, J. A. Finch, A. R. Laplante

    "A detailed review of ball milling circuit control practices in industry has been carried out. Based on fundamental process performance objectives, a standard system for base-level control of most bal

    Jan 1, 1988

  • CIM
    Environmental Regulation and Compliance - A Summary

    By S. W. Stogran

    "A brief summary of the environmental testing and analyses required to ensure and maintain compliance of mining properties will be discussed. Programs for new and existing properties and for propertie

    Jan 1, 1992

  • CIM
    Pebble Grinding At Bethlehem Copper Corporation

    By E. A. Lowe, J. W. Smith, C. W. Overton

    "The operations of Bethlehem Copper are situated in the south-central interior of British Columbia at an elevation of 4900 feet above sea level. Main road and rail transportation systems pass through

    Jan 1, 1975

  • CIM
    Particle Composition Distribution: Measurement and Prediction in Mineral Processing

    By G. Barbery

    "Particle composition distribution is an essential feature of materials processed by physical separation methods. The amenability to segregate a feed material in a concentrate and a tailings stream de

    Jan 1, 1986

  • CIM
    Mine-Mill Waste Water Treatment at Brunswick Mining

    By D. M. Fraser

    "Brunswick Mining and Smelting Corporation Limited operates two mines; one open pit (No. 6) and one underground (No. 12), approximately 20 miles south-west of Bathurst, New Brunswick. Both are massive

    Jan 1, 1980