Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A new gas emission prediction model based on Australian longwall mining conditionsBy Q Qu
Reliable prediction of longwall gas emission sources and rate plays a critical role in mine ventilation and methane drainage capacity planning. Over the years, Australian longwall mines have been usin
Oct 12, 2022
-
Secondary means of egress via emergency gigBy R Austerberry, S Green
The discovery of the Cuffley Lode at Mandalay Resources Costerfield Operations provided an opportunity to extend mine life via mining the offset depth extension of the previously worked Alison Mine. A
Mar 15, 2021
-
Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning SchedulerBy D R. Seaman, R P. Tooher, B A. Seaman
"Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove
Oct 10, 2016
-
The Application of Safescape Ladders at the Cracow and Golden Grove OperationsBy B Hawkins, S Durkin, V Lawrence
The requirement for secondary egress from underground workings has long been regulated in Australia. Escape way systems have evolved from simple airleg rising ladders and timber ladders to steel galva
Mar 24, 2014
-
Application of RISKGATE to Coal Mine Tailings DamsBy M Gasparon, J Harris, T Baumgartl, D J. Williams, M Edraki, P A. Kirsch, D Rowe
RISKGATE, an Australian Coal Association Research Program-funded (ACARP) initiative, has been designed to assist the Australian coal mining industry in improving minimum standards for safety performan
Jul 16, 2014
-
Megablasts – Enabling Technologies in BHP Billiton Iron OreBy B Green
With a focus on safe productive tonnes, there has been an ongoing drive to increase the productivity of the mining fleet across BHP Billiton. In response, a team from the Iron Ore business was formed
Aug 24, 2015
-
Testing new estimation techniques – rank and replace: a stockwork case studyBy D Finn, D Kentwell
Experience has shown that the E-Type multiple indicator kriging (MIK) estimation technique often works well for resource estimation in stockwork mineralisation that contains a mixture of high and low-
Sep 20, 2017
-
An Overview of Current Planning and Production Systems at McArthur River MineBy M Gwynne
McArthur River Mine is located approximately 50 km south-east of the NT township of Borroloola and approximately 120 km from the Gulf of Carpentaria. The mine hosts a series of layered shallow dipping
Jan 1, 1998
-
A Geometallurgical Approach for Iron Ore Product EvaluationBy B J. Beven, A Vatandoost, J Young, S Campbell-Hardwick
The intrinsic value of iron ore depends on its physical and chemical characteristics. For example, silica and alumina are unwanted elements, downgrading iron grade and adversely affecting high tempera
Sep 29, 2013
-
A Geometallurgical Approach at Anglo American PlatinumÆs Mogalakwena OperationBy T Muzondo, C Prins, D De Vaux, R Schouwstra
The Mogalakwena Platinum Mine in the northern limb of the Bushveld Complex is Anglo American PlatinumÆs only open cast operation exploiting the Platreef. The Platreef, which extends along the basal co
Sep 29, 2013
-
Measuring the Effectiveness of Change through Best Practice ReconciliationBy G Pattenden, R Hargreaves, P Pettit
"Even with the cyclic nature of mining, when it comes down to it, the bottom line is that whatever direction the commodity market is going there is always a desire to improve the economics of an opera
Nov 15, 2016
-
Understanding the Role of Production Drilling and Drilled Stocks in Efficient Operation of a Sublevel Cave MineBy C Beal
Proper understanding and management of production drilling in sublevel cave (SLC) mines is essential for meeting production targets and for avoiding inefficiencies that could lead to costly bottleneck
Mar 24, 2014
-
Development Practice and Ground Support Installation at Northparkes E26 MineThe Northparkes E26 Mine is AustraliaÆs first block cave mine. This paper presents an outline of the design and construction philosophies that drove the project development and details the excavation,
Jan 1, 1999
-
Estimation of Resources and Conversion to Reserves ù Protocols for the Assessment, Reduction and Management of RiskBy G Ferguson a, P Carrasco, P P. A Dowd
International codes of practice offer broad definitions with respect to the classification of resources in terms of risk. Specific guidelines and protocols, to analyse sample data, carry out geostatis
Jan 1, 2000
-
Construction Management of Hydrogeological Aspects of Melbourne City Link ProjectBy I A. Lamb
The Melbourne City Link Project has two tunnels, the Domain and Burnley Tunnels, which have been constructed by Transfield Obayashi Joint Venture (TOJV) under a design and construct contract. The two
Jan 1, 1999
-
Controlled Blasting for Civil Construction in an Urban EnvironmentBy R Domotor
Brisbane’s Airport Link is Australia’s largest road infrastructure project, worth a total value of A$4.8 billion. The project is using surface and underground blasting to excavate hard volcanic r
Nov 8, 2011
-
Mineral Sands Resource Security – Underpinning Market Share in a Global Growth ContextBy R Kjar
Globally, it is anticipated that the mineral sands industry will enter a period of short supply. Demand for both titanium dioxide and zircon is forecast to continue increasing, with new projects neede
Oct 5, 2011
-
Breakthrough in elliptical motion screen trial delivers significant performanceBy D Teyhan, J Kirsch
Traditionally, most Australian iron ore mining operations have been surface-based. Processing plants were designed to handle dry ores. In recent years mining operations in the Pilbara have progressive
Aug 24, 2022
-
Nova-Bollinger unfolding versus DA estimateBy P M. Hetherington, M P. Murphy, K E. Crook, F Pym
Resource characterisation is critical for informed decisions in both strategic and operational space. The sources of information for resource characterisation are limited by: direct measurement of res
Mar 22, 2022
-
Preconcentration and ore processing by on-line sensorsBy I Auranen, J Raatikainen
IMA Engineering (IMA) and Mine On-Line Service (MOLS) companies have used on-line sensors for analysing ore and waste rock in mining for more than 25 years. Today IMA on-line sensors are used in vario
Nov 10, 2020