Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    On the Influence of Fundamental Detonics on Blasting Practice

    By A Minchinton

    With blasting, all far-field phenomena including, but not limited to, stress wave propagation, fracture, vibration and muck pile formation are intrinsically and irrevocably dependent upon near-field p

    Aug 24, 2015

  • AUSIMM
    Legume and Grass Revegetation of Mine Tailings

    By C P. C David, J P. T Domingo

    Addressing nutrient deficiency, among other factors, is vital to the growth and establishment of plants in mine spoils and tailings ponds. Although several organic amendments are available for this pu

    Jul 16, 2014

  • AUSIMM
    Thermosensitive, Hydrophobically Modified Anionic Flocculants for Dewatering Kaolin Clays

    By D R. L Vedoy, L Botha, S P. Gumfekar, J B. P Soares

    Most of the known in-place reserves of oil sands are found in Canada. These oil sands ores are mined using various processes to extract bitumen. The by-product slurry resulting from the extraction pro

    Jul 27, 2015

  • AUSIMM
    Mechanics of Rock/Tool Interaction in Disc Rock Cutting

    By M Hood, X S. L, W J. T Daniel, H Gurgenci

    It is believed that disc cutter shape affects rock fracture and therefore cutter performance and cutter life. However, the current generation of disc cutters is made of hardened steel and these cutter

    Jan 1, 1998

  • AUSIMM
    Telfer Project Process Plant Design

    By R Dunne, G Lane, S Ha, D Dreisinger

    The paper outlines the 17 Mt/a Telfer Project plant process design from sample selection to feasibility study design. The 366 Mt Telfer mine reserve consists of a diverse range of copper and gold mine

    Jan 1, 2003

  • AUSIMM
    Improving Excavation Efficiency at the St Helena Tunnel Using Best Practice Drill and Blast Techniques

    By D Miller, M Dowling, R Domotor

    "This paper is focused on blasting activities undertaken as part of the Pacific Highway Upgrade – Tintenbar to Ewingsdale – project (T2E). This is a ‘priority 1’ Pacific Highway road construction proj

    Sep 17, 2014

  • AUSIMM
    The McArthur River Mine - The First Years of Operation

    By C M. Stewart, P Bowen

    McArthur River Mine, in the Gulf Country of the Northern Territory, exploits one of worldÆs largest deposits of zinc, lead and silver. It was officially opened in September 1995, 40 years after its di

    Jan 1, 1998

  • AUSIMM
    Design and Specification of Permanent Shotcrete Tunnel Linings

    By D Mather

    Fibre reinforced shotcrete has long been accepted as temporary ground support in both mining and civil tunnel linings. Greater knowledge and understanding of shotcrete as an engineering material and a

    Mar 8, 2011

  • AUSIMM
    The role of fleet management in reducing carbon emissions from haul trucks

    By D Prior

    The Australian mining industry is a significant contributor to the nation’s greenhouse gas (GHG) emissions, and like any industry, it must make efforts to reduce these. Medium- and long-term strategie

    Jun 22, 2022

  • AUSIMM
    Characterisation and assessment of B2O3 added LF slag

    By S Kakara, A Kamaraj, S S. Varanasi, B V. R Mandalika, M B. Shaik

    The properties of top slags play a very important role in secondary steelmaking. Fluxes should be chosen based on the ladle furnace (LF) slag requirements like viscosity, melting temperature, sulfide

    Aug 21, 2024

  • AUSIMM
    Landform Design for Pilbara Mine Site – Why Plan and Design Waste Rock Dumps for Closure Based on Site-specific Conditions?

    By G Hancock, A Kemp, I Taylor

    The mine site is situated south east of Port Hedland in the Pilbara region of Western Australia. A detailed engineering design was undertaken for six irregularly shaped waste rock dumps at the site. T

    Jul 16, 2014

  • AUSIMM
    The Use of Non-destructive Testing to Identify Defective Rock Bolts – A Case Study

    By B Jones, M Chappell

    Permanent rock bolts used to support rock tunnels are required to perform for the design life of the structure as a minimum. Quality of installation is critical to the performance over the life of the

    Sep 17, 2014

  • AUSIMM
    The Roy Hill Project

    By J M. F Clout

    The Roy Hill Project is an independent integrated port, rail and mine development in the Pilbara region of Western Australia. The bankable feasibility study for the project was completed in January 20

    Jul 11, 2011

  • AUSIMM
    Developing dephosphorisation technique for iron ore with reductionprocess

    By K Higuchi, K Saito, O Ishiyama

    Iron ore in Australia is predicted to increase in its phosphorus content in the near future, which is detrimental to properties of steel product. Steelmakers are concerned by the content of phosphorus

    Sep 18, 2023

  • AUSIMM
    Supply chain approach to iron ore dust monitoring and remediation – Pilbara, WA

    By G Zhao, S Hapugoda, E R. Ramanaidou, P Hapugoda, Y Jin, G O’Brien

    In 2021 the ports of Port Hedland and Dampier in the Pilbara Region of Western Australia handled 900 Mt of iron ore. This ore was produced in the Hamersley’s mines and transported by trains to the por

    Sep 18, 2023

  • AUSIMM
    The Strength of Backfills Stabilised with Calcined Gypsum

    By R M. Anderson, S P. Pigdon

    The production of stabilised backfill at mine sites commonly uses Portland cement as the binder. Calcined gypsum has cementing properties and is cheaper to produce than cement. This paper discusses th

    Jan 1, 1998

  • AUSIMM
    Adaptation of an Open Pit Optimiser for Underground Strategic Planning

    By M Bloss, B Roberts

    BHP Billiton Olympic Dam required a well-tested software product suitable for strategic optimisation and scheduling of options for a potential underground mining project. The company has a standard so

    Nov 24, 2014

  • AUSIMM
    Estimating the Rock Mass Strength of Hawkesbury Sandstone

    By R Bertuzzi

    "This paper presents preliminary results of ongoing research being carried out at the University of New South Wales Australia (UNSW) into improved methods for estimating rock mass strength. In this pa

    Nov 5, 2014

  • AUSIMM
    Experimental Study on Extinguishing Characteristics of Coal Fire in Confined Space

    By B Wu, B W. Lei, B J. Duan

    When a coalmine fire occurs, it is crucial to judge the developing trends inside the fire area by analysing the changes of gas concentration in order to formulate the proper rescue measures. At presen

    Aug 31, 2015

  • AUSIMM
    Full-round Numerical Modelling of a Macro Synthetic Fibre Reinforced Tunnel Boring Machine Tunnel in the Shanghai Metro Extension

    By L Nagy, K P. Juhasz

    The authors were engaged to optimise a traditional rebar cage reinforced concrete segmental lining by means of finite element analysis (FEA) using macro synthetic fibres for the Shanghai metro extensi

    Sep 17, 2014