    A Review of Automation at Kalgoorlie Nickel Smelter

    By Campain RA, Horner NJ, Limerick JM

    The review covers the different concepts of automation which are appropriate to non-ferrous smelting and the degree to which the smelter, and the furnace in particular, is amenable to total automation

    Jan 1, 1985

  • AUSIMM
    Problems of Secondary Breaking

    Experimentation with new methods, materials and machines to improve primary drilling and blasting is a continuing practice in the hard rock quarry operations of the BMI Group. These experiments wil

    Jan 1, 1978

  • AUSIMM
    The Economic Impact of Artificial Support in Open Pit Mines

    By Fuller P. G, Dugan K. J

    Artificial support can be used to improve wall stability in open pit mines. This is examined for a particular case where the factor of safety for a slope is kept constant by using artificial support

    Jan 1, 1989

  • AUSIMM
    The Preparation of Pastefill and its Use at Some Canadian Mines (6e4bc1a5-4335-470a-b421-2dd830dbe3e2)

    Two key elements in the design of a pastefill or high density hackfill system are the preparation of the backfill material and its distribution underground. This paper examines these two areas. Owin

    Jan 1, 1998

  • AUSIMM
    Effect of Weakness Planes Inclination on the Strength of Coal Pillars

    This paper presents a method for estimating the strength and stability of model coal pillars with bedding planes (weakness planes) inclination. The strength of coal relative to the angular differenc

    Jan 1, 1995

  • AUSIMM
    Coals to Newcastle the PWCS Ship Unloading System

    The design and construction of a 2.5 million tonne per annum ship unloading system at the PWCS export coal terminal in Newcastle, NSW, has further increased the flexibility and sophistication of A

    Jan 1, 1987

  • AUSIMM
    Review of the Mobile Miner at Isa Mine

    The search for an efficient and economic machine to excavate hard rock continues. Development of the Robbins Mobile Miner commenced in 1983 with the formation of a joint venture between Mount Isa

    Jan 1, 1988

  • AUSIMM
    The Thermal Decomposition of Sodium Ethyl Xanthate Adsorbed on Activated Carbon

    By Chamberlain A. C, Fisher N, Avraamides J

    The thermal decomposition of sodium ethyl xanthate (SEX) adsorbed onto activated carbon was studied by coupled thermogravimetric analysis-Fourier transform infrared spectroscopy (TG-FTIR). Two disc

    Jan 1, 1996

  • AUSIMM
    High Blow Energy Hydraulic Impactor

    The introduction of many new hydraulic ally and pneumatically powered impact breakers over the past few years demonstrates the growing interest in this technique of breaking rocklike material. The

    Jan 1, 1978

  • AUSIMM
    The Commissioning and Operation of the Carbon-in-Pulp Plant at Australis Mining N.L., Norseman, Western Australia

    Australis Mining N.L. operates a continuous mode carbon-in-pulp (CIP) gold plant, processing sand and slime tailings from previous gold mining operations in the Norseman area. Plant design is that o

    Jan 1, 1982

  • AUSIMM
    A Continuous Oxygen Probe for Non-Ferrous Smelting Slags

    By Flloyd J. M

    A continuous oxygen probe,incorporating a SIRO2 solid electrolyte oxygen sensor which measured the oxygen potential of a small volume of gas enclosed above the melt's surface,was constructed

    Jan 1, 1987

  • AUSIMM
    Liquor Filtration - Designing a Benchmark Solid Liquid Separation Process

    This paper provides a brief fundamental insight regarding the fabric media concept for liquor filtration. The subject matter will be of interest to metallurgists and engineers with professional respon

    Jan 1, 2008

  • AUSIMM
    Design Selection and Application of a Pressure Filtration System to the Dewatering of Copper and Lead Sulphide Slurries

    By Hawes GW

    Until 1980 copper, lead and zinc sulphide slurries have been success- fully dewatered for rail and sea transport for many years at the Rose- bery site of North Broken Hill Holdings Ltd. utilizing conv

    Jan 1, 1988

  • AUSIMM
    Impact of Longwall Width on Overburden Behaviour

    By Grady PO

    The longwall panels at Clarence Colliery have experienced intermittent sudden weightings on the face that have caused some production delays. These weightings have typically been more severe on the wi

    Jan 1, 1998

  • AUSIMM
    Geology, Mineralisation and Genesis of the Alkaline Dinkidi Cu-Au Porphyry, North Luzon, Philippines

    By P Joyce, D R. Cooke

    The Dinkidi Cu-Au porphyry deposit is situated in the Caraballo Range of North Luzon, Philippines. Although comparatively small, Dinkidi has unusually high gold grades with drilling by Climax-Arimco M

    Jan 1, 1999

  • AUSIMM
    Application of Block Caving System in the Tongkuangyu Copper Mine

    By Song Yongxue

    During the design and operation stages of a block caving project, a large amount of research and development work has been undertaken in the Tongkuangyu Copper Mine. This paper presents the research a

    Jan 1, 2000

  • AUSIMM
    Some Practical Problems in Running Statistically Valid Plant Trials, and Their Solution

    Operating metallurgists spend a significant part of their time running plant trials to compare two or more conditions in order to improve the process, such as a new reagent, flow sheet or piece of equ

    Jan 1, 2008

  • AUSIMM
    Tectonic Evolution of the Bowen Basin, Eastern Queensland

    The Permo-Triassic Bowen Basin developed during the final stages of the Tasman Orogenic Phase in eastern Australia. The basin has considerable economic value as a source of coal, natural gas and prec

    Jan 1, 1990

  • AUSIMM
    The Effects of Surface Mining Technology on the Economy of the Haulage Process and Mining Productivity

    In general, modern mining companies all over the world have to face the same economic circumstances as any other part of the industry: considering the tough competition, production and haulage costs m

    Jan 1, 2003

  • AUSIMM
    Recovery of Old Mine Workings in Weak Ground

    By McCarthy P. L

    With production at Olympic Dam scheduled to commence in June 1988, it has been necessary to install a complete underground ore handling system capable of removing two million tonnes of material a

    Jan 1, 1988