Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Installation of an Automatic Truck Despatch System at Bougainville Copper Limited

    In early 1985, Bougainville Copper Limited commissioned an automatic truck despatch system to control its fleet of 44 trucks and 9 shovels. Productivity gains in the past have been the result of i

    Jan 1, 1986

  • AUSIMM
    Balancing Competing Water Resource Demands and Mining in a Coastal Environment

    The mining of mineral sands in coastal aquifers is often constrained by other land use conflicts and inappropriate controls imposed through a lack of understanding of environmental interactions and

    Jan 1, 1988

  • AUSIMM
    Designing Flotation Cells For Optimised Flow Dynamics

    By T Niitti, J Turunen, P B, A Rinne

    In todayÆs marketplace, with high metals prices, many operations are faced with the challenge of improving recovery in the particle size ranges which are normally difficult to recover. This presentati

    Jan 1, 2006

  • AUSIMM
    One Mile Underground – Mining the N3500 Orebody at Mount Isa Mines

    By I Özen, G Chitumbura

    A paper identifying anticipated challenges in the extraction of the N3500 Orebody at Glencore Xstrata Copper’s Mount Isa Copper Operations was written in 2007. The paper identified the depth of the de

    Mar 24, 2014

  • AUSIMM
    Character of Simulation Material of Coal – Rock and Gas Solid-gas Coupling and Engineering Application

    By C Bie, S Li, P Xiao, P Zhao, H Lin

    "Based on solid simulation material research, the simulation conditions for methane and coal solid-gas coupling were obtained using solid-fluid coupling theory. Using sand as the aggregate and paraffi

    Aug 31, 2015

  • AUSIMM
    The Cenozoic Detrital Iron Deposits of the Hamersley Province of Western Australia – A Tribute to Mal Kneeshaw

    By R C. Morris

    Two major types of economic secondary iron ores occur in the banded iron formation (BIF)-rich Hamersley Province of the Pilbara, Western Australia:dominant BIF-hosted bedded iron deposits (BID)detrita

    Jul 13, 2015

  • AUSIMM
    The Median versus the Mean Fragment Size and Other Issues with the Kuz-Ram Model

    By F Ouchterlony

    Soviet precursors to Cunningham’s Kuz-Ram model from 1983 are described. They are rooted in the mean fragment size and Rosin-Rammler (RR) fits to sieving data and rely on approximations. Three version

    Aug 24, 2015

  • AUSIMM
    Investing in new process improvement technology: reducing the risk of implementation – a way forward

    By S H. Algie, E J. Knoblauch, I A. Lovatt, S G. Doig

    Mill operating teams are expected to engage in a perpetual quest for process improvement – pushing the boundaries of practical process limits and testing new technology to achieve the next step-change

    Aug 29, 2018

  • AUSIMM
    Heat Load Estimation from Conveyor Systems in Mass Mines

    By R Moreby, J Kok, L van den Berg

    The high production rates achieved from mass mining methods such as block caving, sublevel caving and longwall mining require large conveyor belts, trucking loops (diesel/electrical) and rail systems

    Aug 31, 2015

  • AUSIMM
    The Filblast Cyanidation Process

    By Bodnaras G. E, Sceresini P. A

    The Filblast Cyanidation Process incorporates the advantages of intense high shear mixing, high dissolved oxygen concentration and high pressure to achieve extremely rapid gold dissolution rates. Th

    Jan 1, 1994

  • AUSIMM
    Production Drill and Blast Practices at Ridgeway Gold Mine

    Newcrest Mining Limited (NML) owns and manages the Ridgeway Gold Mine (RGM) located outside Orange in the state of New South Wales. RGM is a new underground sublevel caving (SLC) operation that is ram

    Jan 1, 2002

  • AUSIMM
    Remote Monitoring of Rock Mass Deformation During Mining

    By M Mee, R L. Gwyther

    Accurate measurement of rock mass response during the mining of massive underground orebodies is essential, as mines become larger and deeper. These measurements enable: provision of quantitative data

    Jan 1, 2000

  • AUSIMM
    Palaeomagnetic, Tectonic, Magmatic and Mineralisation Events in the Proterozoic of Northern Australia

    By Wyborn L. A I, Idnurm M, Hinman M. C

    Comparison of the Proterozoic Apparent Polar Wander Path (APWP) for Australia with the corresponding geology of northern Australia suggests that a number of discrete interplate tectonic events, mani

    Jan 1, 1994

  • AUSIMM
    Evaluation of Complex Systems to Develop Key Water Quality Influences at the DeBeers Snap Lake Diamond Project

    By R L. Verburg, R Johnstone

    DeBeers Canada Mining Inc (DeBeers) recently submitted an Environmental Assessment (EA) for its proposed Snap Lake Diamond Mine located in Northwest Territories, Canada. As part of the EA process, a s

    Jan 1, 2003

  • AUSIMM
    Intelligent Mine Technology Program and its Implementation

    By P SSrkkS

    Mining is commonly seen as a typical basic industry with rough and even dangerous working conditions, heavy environmental load, and a low level of high-technology and automation with much manual work

    Jan 1, 2000

  • AUSIMM
    Investigation of Gas-Dynamics Processes and their Transience in Blast Furnaces

    By Ovchinnikov YN, Novikov VS, Spirin NA, Babushkin NM, Mysik AF, Shcherbatskii VB, Kukarkin AS

    Laboratory investigations were carried out to determine the resistance coefficient of the flow through beds irrigated with wetting and non-wetting liquids. A formula was obtained which may be used to

    Jan 1, 1975

  • AUSIMM
    Driving improvements to underground diamond drilling effectiveness through real-time implicit modelling at Olympic Dam

    By J Taylor, M Smith, A Tunnadine, D Nikolakopoulos

    As Olympic Dam rapidly expands into the Southern Mine Area (SMA) the Mine Geology team has concurrently ramped up underground diamond drilling to sustain rates of above 175 km/a. With >10 underground

    Mar 22, 2022

  • AUSIMM
    Practical Optimisation of the Flotation Circuit at West Cliff Washery

    By Kazis JV

    The beneficiation of fine coal has been the major problem facing the coal preparation engineer in recent years. The influence of clay slime, particle size and reagent type are but a few of the many

    Jan 1, 1984

  • AUSIMM
    Metallurgical Efficiency in the Recovery of Alluvial Gold

    The character of alluvial gold deposits presents severe difficulties, and sometimes limitations, on the extent to which metallurgical efficiency can be measured. Very little monitoring of metallurgica

    Jan 1, 1984

  • AUSIMM
    Application study of UAV technology in tailings pond monitoring

    By T Zhao, K Wang, Z Zhang

    Tailings pond safety monitoring is vital for preventing dam failures and ensuring environmental safety. Unmanned Aerial Vehicles (UAVs) can enhance tailings pond monitoring with flexible operational c

    Sep 1, 2024