Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Validation of Measurements Used to Solve Ventilation ProblemsBy Chavant G, Begis D, Gunther J
To study the ventilation of a mine (improve on the existing situation, examine extension projects) the calculation program used must take into account all the resistance values in the branches of
Jan 1, 1988
-
Target Generation by Integrated Modelling in the Limpopo Region, South AfricaBy M Surtees
The Limpopo region in southern Africa is considered to be a favourable target for the discovery of base and precious metal mineral deposits. The integration of gravity, geomagnetic, LANDSAT data and g
Jan 1, 1993
-
A Comedy of Errors: Uranium Policy in AustraliaThe word governing derives from gubernare meaningto pilot a ship. Being inclined to metaphors, one could be forgiven to think that politicians act this verb and captain the Nation's ship into som
Jan 1, 1990
-
Heavy Medium Cyclone Plants- The Choice Between a DynaWhirlpool Pump Fed of Gravoity Fed Cyclone SystemBy Carter LC
Following the perception by the Groote Eylandt Mining Company of a need to further beneficiate a fines product, and preliminary metallurgical testing to demonstrate the feasibility of such benefici
Jan 1, 1987
-
Floatation of Ok Tedi PyritePyrite is a significant gangue sulphide mineral in the Ok Tedi copper ore. Its presence in the flotation concentrate is not entirely desirable since it lowers the grade of the final copper concentra
Jan 1, 1997
-
Aspects of Design and In-Situ Testing for the Murl Rock TunnelsBy Bennet A. G
An overall review of the selection of rock strength and deformation characteris- tics for the design of the Melbourne Under- qround Rail Loop (MIJRL) rock tunnels is presented. Particular emphasis is
Jan 1, 1981
-
CaroÆs Acid Queensland Mines Plant TrialsBy Fulton E, Ring RJ, Waters DJ
Laboratory leach tests of Nabarlek uranium ore carried out by the Australian Atomic Energy Commission to compare the effectiveness of Caro's Acid1 (permonosulphuric acid) as an alternative oxi
Jan 1, 1978
-
Modification of Iron Blast Furnace Slag Using Sirosmelt TechnologyBy Floyd JM
Pilot plant trials showed the effective ness of the submerged lance SIROSMELT technology for altering the composition of iron blast furnace slags as a preliminary step to produc- tion of formed mate
Jan 1, 1979
-
The Political Dimension in Resource DevelopmentI must tell you at the outset that I come to this conference deeply disturbed at the `role of Government in international dealings in mineral and energy resources'. I am disturbed by the confu
Jan 1, 1978
-
Groundwater Management in Coal Bed Methane Projects ù Turning a Waste into a ResourceBy C M. Hill
This paper aims to provide a brief overview of the Australian Coal Bed Methane (CBM) industry and more importantly the challenges to sustainable management of the industryÆs by-product, groundwater. I
Jan 1, 2003
-
The Lows and Highs of Dense Medium SeparationThe paper describes the reasons for developing, specifically in South Africa, dense medium processes to allow baths to operate at low (about 1,35) and high (about 2,0) cut points. Low density proc
Jan 1, 1987
-
Minimising Coal Edge Losses in Dragline Blasting OperationsBy Yang RL, Bailey ML
During overburden blasting operations in dragline pits, coal edge losses along the lowwall edge of the new pit are often experienced. In tonnage terms, losses can be significant. With the thick seams
Jan 1, 1988
-
New Tailings Dam at Ardlethan Tin N.L.In May 1977 a new dam was commissioned for disposal of 600,000 metric tonnes/year of tailings. Design basis, costs and construction problems are described. Problems arose, assoc- iated with lack of
Jan 1, 1978
-
Geology of the Leigh Creek CoalfieldBy Townsend IJ
The Upper Triassic Leigh Creek Coal Measures which include a number of seams of sub-bituminous black coal are preserved in four small intramontane basins. The largest is Telford Basin, 1,000 m in
Jan 1, 1975
-
Injury Statistics - An Impoprtant toolAXTAT is a computerised system developed by the Western Australian Department of Minerals and Energy in conjunction with the local mining industry for recording and retrieving information about fata
Jan 1, 1996
-
Continuous Haulage the Coal and Allied ExperienceBy Lennox A
In an attempt to increase underground productivity Coal and Allied has introduced a continuous haulage unit into it's Moonee colliery. A second unit is planned for Nallarah colliery in the ne
Jan 1, 1988
-
Practical Reserve Estimation in a Shear-Hosted Gold Deposit, ZimbabweEvaluation of reserves on a production scale within a shear-hosted gold deposit is complicated by the nature of the mineralisation itself. The 'payable' ground seems to be confined to areas
Jan 1, 1993
-
Production Blasting Practice at Hamersley Iron Pty. LimitedBy Kaleta S, McTavish LP, Turner RD
Primary production blasting at Hamers- ley Iron began with seven inch holes at Tom Price in 1966 and has developed since then to large multiple row shots of 381 mm holes at Tom Price and 311 mm at
Jan 1, 1978
-
Water Control in Exhaust Ventilation Raises and Associated Fan WorksThe Olympic Dam Mine is a large, mechanised, underground operation currently producing 2.2 million tonnes-per-year of copper/uranium/gold ore. The mine is accessed via one shaft and one service declin
Jan 1, 1992
-
In-seam Drilling Technologies for Underground Coal MinesBy Hatherly P, Dunn P
There are- several in-seam coal research projects currently under investigation by the Cooperative Research Centre for Mining Technology and Equipment (CMTE). The overall aim of the projects is to pro
Jan 1, 1998