Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Hishikari Gold Deposit A Case History and Present Status of Exploration

    By Ibaragi K

    High grade ores were intersected in 1981 by a scout drill carried out by the Metal Mining Agency of Japan during a reconnaissance dril ling programme. The original aim of the hole was to explore

    Jan 1, 1987

  • AUSIMM
    Developments of Pasminco Mining's South Concentrator

    At Pasminco Mining's South concentrator. which was commissioned in 1952. an expansion. modernisation and efficiency improvement program commenced in 1986 with a coarse ore stockpile and grinding

    Jan 1, 1991

  • AUSIMM
    Long Hole Rising at Mines in the Aberfoyle Group

    The application of methods using large diameter down holes has become an important facet in both the development and stoping operations of mines within the Aberfoyle group. Holes of up to 98 metres

    Jan 1, 1982

  • AUSIMM
    Heap Leaching at Camel Creek Mine

    By Menne D. M, Ladyman R

    Camel Creek Mine operated by Lynch Mining Pty Ltd is located 65 km west of inghain and 160 kin north west of Townsville in North Queensland. (Figure 1). The Camel Creek gold mineralisation was disco

    Jan 1, 1994

  • AUSIMM
    Gold, Calcite, and Other Materials on Activated Carbons from CIP Pplants

    By Woodcock J. T, Sparrow G. J

    Activated carbon particles obtained from a number of Australian CIP operations were examined with an optical and a scanning electron micro- scope and an electron microprobe. External surfaces, and po

    Jan 1, 1988

  • AUSIMM
    Progress Towards the Heap Bioleaching of Chalcopyrite

    By P D. Franzmann, D J. Readett, J Peterse

    A better connection between laboratory- and pilot-scale test results, and heap bioleaching performance can be achieved by generating reliable information on the fundamental microbial, chemical and phy

    Jan 1, 2004

  • AUSIMM
    The Educational Needs of the Mining and Minerals Industry in Western Australia with Particular Reference to the Pilbara

    By Carroll D. A

    The mining and minerals industry has had and will undoubtedly continue to have a considerable impact on the development of this State. For the first 60 years of its history the colony of Western Au

    Jan 1, 1979

  • AUSIMM
    Properties of Bricks Containing Coalwash

    In comparisons of a trial extruded brick containing 33 per cent coalwash and 67 per cent clay and a trial pressed brick containing 100 per cent coalwash with a standard extruded clay face brick, the m

    Jan 1, 1992

  • AUSIMM
    Managing Fines Generation in the Blasting and Crushing Operation at Cerro Colorado Mine

    By Veloso L, Alvarez O, David D

    Cerro Colorado operations The Cerro Colorado Mine is located 150 km east of Iquique in the Atacama desert of northern Chile. The mine is wholly owned by Rio Algom Limited of Canada and produces copp

    Jan 1, 1998

  • AUSIMM
    The Petrology and Mineralization of The Coolac Serpentine Belt East of Brungle, New South Wales

    A belt of serpentinized ultrabasic rocks intrudes a moderately folded geosynclinal sequence of fine to coarse sediments, acid, intermediate, and basic volcanics as well as a batholithic mass of granit

    Jan 1, 1969

  • AUSIMM
    Surface and Near Surface Gold at Vunda, Fiji

    Surface and near surface particulate gold occurs sporadically over an area of some60 km2 between Vunda and Navilawa on the west coast of Viti Levu, Fiji.Background grades of 0.01 ppm can be found in t

    Jan 1, 1984

  • AUSIMM
    The Stratigraphic and Metamorphic Sequence of Mount Isa, and Associated Igneous Intrusions

    The stratigraphic sequence west of Mount Isa contains the Judenan Beds, Eastern Creek Volcanics, and May Downs gneiss. It is an incomplete sequence as major north-south faults divide the area into fou

    Jan 1, 1972

  • AUSIMM
    Pipelines - The Mining Cycle Catalyst

    Both as an energy source and as a raw material, natural gas is playing an increasingly important role as a catalyst for the development, continuation and rebirth of mining projects in Australia. Pipel

    Jan 1, 1998

  • AUSIMM
    Chilean Ore Deposits and Mineral Belts

    By Lowell J. D

    This paper is an outgrowth of a continuing compilation of the geology of Chilean ore deposits by Carlos Ruiz who was the author in 1965 of Geologia y Yacimientos Metaliferos de Chile which was the def

    Jan 1, 1990

  • AUSIMM
    Resource Estimation and Three-Dimensional Modelling of Gold Mineralisation at Mt Leyshon Gold Mine, NE Queensland

    Geostatistical analysis, resource estimation and three-dimensional modelling of the gold grade distribution was undertaken using exploration drillhole data taken from the Mt Leyshon gold mine. The mai

    Jan 1, 1993

  • AUSIMM
    The Cannington Deposit

    By Thomas MJ

    The Cannington silver-lead-zinc deposit is located at latitude 21¦ 52' 9" South, longitude 140¦ 55' 10"" East, on the south-eastern margin of the Proterozoic Mount Isa Block (Figure 1), 135

    Jan 1, 1993

  • AUSIMM
    Venturi Scrubber System for Dust Control on a Longwall Face

    By Rao S. B, Baafi E. Y

    A venturi based multi-scrubber air cleaning system has been developed for dust control along a longwall face in coal mines. The system consists of a number of scrubbers. strategically placed along the

    Jan 1, 1995

  • AUSIMM
    A Potential Type on Tin Deposit in East Guangdon, China

    By Bin H

    East Guangdong tin province overlaps the southmost part of the mesozoic magmatic arcof continental margin type in Southeast China and is dominated by mesozoic syntectic magmatism,which associated to t

    Jan 1, 1990

  • AUSIMM
    Improving Flotation Plant Performance at Cadia by Controlling and Optimising the Rate of Froth Recovery Using Outokumpu FrothMaster<sup>TM</sup>

    By P Bourke, S Ronkainen

    Since the early days of flotation, process technicians have known that the speed at which the froth is recovered over the lip of the cell has a very direct and consistent influence on the grade and re

    Jan 1, 2000

  • AUSIMM
    A New Approach to Flexible Open Pit Optimisation and Scheduling

    By A Galli

    Traditionally pit optimisation and scheduling is carried out assuming that the resources, the commodity prices and production costs are all known. Once the pit contour and the mining schedule have bee

    Sep 26, 2011