Search Documents

Sort by

  • NIOSH
    RI 7365 Geometric Relationships Between Geologic Structure And Ground Stresses Near Atlanta, Ga.

    By Carl E. Norman

    An investigation of geologic structure on macroscopic, mesoscopic, and microscopic scales was conducted on near-surface igneous and metamorphic rocks in which the existing stress field was determined

    Jan 1, 1970

  • NIOSH
    Maintainability Design Checklist (f5b2eeed-9ba2-4ab7-8fe5-b6b7ade62960)

    The following is a Maintainability Design Checklist for coal mining equipment. The purpose of the checklist is to provide a summary of design review points for the maintainability assessment of new o

    Jan 1, 2000

  • NIOSH
    Maintainability Design Checklist

    The following is a Maintainability Design Checklist for coal mining equipment. The purpose of the checklist is to provide a summary of design review points for the maintainability assessment of new or

    Jan 1, 2000

  • NIOSH
    MLA 8-88 - Mineral Resources Of The Lemhi Range Study Area, Lemhi And Custer Counties, Idaho

    By Eric E. Cather

    In 1984 and 1986, at the request of the U.S. Forest Service, the U.S. Bureau of Mines conducted a mineral appraisal of the 315,000-acre Lemhi Range study area. This area is located in Lemhi and Custer

    Jan 1, 1988

  • CIM
    Evaluation of shotcrete rock support systems in underground mines by a new non-intrusive technique (33890d65-d377-415a-af90-fb1c64a61d2e)

    By F. Hassani, D. O’Donnell, M. Momayez, P. Guevremont

    Shotcrete is a practical and economical support system in many Canadian underground mines. Although shotcrete technology has gained acceptance in the mining industry, there are some problems that have

    Jan 1, 2002

  • AUSIMM
    The Influence of Mining on Sediment Geochemistry of the Waitekauri Catchment, Waihi, New Zealand

    By J G. Webster-Brown, K L. Brown

    The Waihi Region is host to many low sulphidation epithermal Au-Ag deposits. The Golden Cross mine located at the head of the Waitekauri River, eight kilometres NW of Waihi, was a gold mining operatio

    Jan 1, 2003

  • DFI
    Complex Piling Works At London Blackfriars Station

    By Jamie D. McEwan

    To cater for the future introduction of 12 car trains, London Blackfriars railway station is being extended from the north end to span across the River Thames. Following the demolition of existing bui

    Jan 1, 2011

  • SAIMM
    Friction Hydro Pillar Process As An Alternative Repair Technology For Creep Evaluation Sites On Thick-Walled 10CrMo910 Creep-Resistant Steel Structures ? Synopsis

    By D. L. H. Bulbring

    The removal of a cylindrical core from thick-wall sections for creep analysis by the relatively new Weldcore® process represents a very exciting methodology for obtaining more representative creep dam

    Jan 1, 2013

  • NIOSH
    Remote Monitoring of Mine Seismicity and Earthquakes Using Radio Telemetry, Computers, and the Internet

    By D. Denton, M. Stickney, R. Langston

    The National Institute for Occupational Safety and Health and the Stillwater Mining Company worked cooperatively with the Montana Bureau of Mines and Geology to develop a system that would collect sei

  • AUSIMM
    Empowering tailings operators through education

    By D Brett

    The Paper presents the authors thoughts on how the mining industry should be improving the education of site personnel so they can provide a greater level of effective control of tailings dam safety i

    Jul 1, 2021

  • DFI
    A Study Of Three Test Sites Comparing Theoretical Ultimate Pile Capacities, Static Pile Load Tests, And Psuedo Static Pile Load Test Results

    By Richard D. Short

    The Pseudo Static Pile Load Test, PLT, is a rapid method for determining pile capacity. Pile design is usually based on theoretical calculations of ultimate load capacity using soil data from a field

    Jan 1, 2000

  • SME
    Design And Construction Of The Exploratory Shaft Facility -A Regulatory Perspective

    By J. Peshel

    This paper presents a regulatory perspective of the design and construction of the Exploratory Shaft Facility which may become part of the future high-level waste repository. Site characterization con

    Jan 1, 1989

  • SME
    Contractual Practice in SEM/ NATM—Tunnelling in Austria and Germany - NAT2024

    By Lukas Erkurt, Wolfgang Holzer, Stefan Auderer, Richard Gradnik

    SEM/ NATM Tunnelling contracts in Austria and Germany are usually tendered applying unit price contracts. The purpose of this paper is to show how contractual problems are resolved in these countries.

    Jun 23, 2024

  • CIM
    Maintenance Engineering ? Mine Operators Conference

    Presentation Topics ? Low and Intermediate Level Waste ? Project Location and Site ? Geological Setting ? Key Features ? Project Overview ? Licensing and EIS ? Next Steps DGR Waste Package Inv

    Oct 1, 2010

  • AUSIMM
    Capital and Operating Cost Eestimation for Open Pit Mining Equipment

    Background information, formulae and a systematic set of procedures for estimating capital and operating costs for open pit mining equipment are presented in this paper. Firstly, equipment capital c

    Jan 1, 1990

  • DFI
    Once Again, Engineering And Contractor Tenacity Overcome Tough Geology

    By John E. Lens

    How much trouble can narrow vertical fissures in bedrock cause on a shallow bedrock site? Enough trouble so end-bearing H-piles range between 8 and 100 feet long in a single pile cap and tiebacks ran

    Jan 1, 2006

  • AUSIMM
    Structural Controls in the Tarnagulla Goldfield, Central Victoria: Implications for Metamorphically Derived Auriferous Fluids

    By V Morand, W R. H Ramsay

    Structural, mineralogical, and textural data from the Tarnagulla Goldfield demonstrate that the area has undergone three significant phases of deformation. The first phase of deformation (D1) predates

    Jan 1, 1995

  • SME
    Lead-Zinc Exploration At Gays River District, Nova Scotia ? Summary

    By Patrick Hannon

    In this presentation, it is intended to briefly describe some occurrences of lead-zinc mineralization in Mississippian carbonates of central Nova Scotia. Results of geophysical and geochemical prospec

    Jan 1, 1975

  • CIM
    Comparative tests of two operating procedures for the Turam electromagnetic prospecting system conducted at the McClean uranium deposits in northern Saskatchewan

    By K. Duckworth

    "Comparative tests of the conventional Turam survey configuration and an alternative configuration called the Tx-parallel configuration were conducted at the McClean uranium deposit in northern Saskat

    Jan 1, 1988

  • DFI
    Video Inspection Of Rock Sockets For A Piling Project

    By Ali Ameli

    Design loads are limited for piles relying upon toe stresses in rock due to uncertainty about the rock quality over the whole pile diameter because of rock mass properties or construction effects. Th

    Jan 1, 2006