Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Risk Management and Use of a Geotechnical Baseline Report for a Competitive Alliance Procurement?ProcessBy T Ireland, S Eratne, W Newns, P Spies
The approach to risk management during the procurement of major projects often has a significant outcome on the ultimate delivery of a project. The NZ$1.4 B Waterview Connection project is the largest
Sep 17, 2014
-
The Polaris-Taku Mine, Tulsequah, B.C. Geology and DevelopmentBy D. C. Sharpstone
THE Polaris-Taku mine is a new gold property, situated in the far north-west corner of British Columbia. Production was started in November, 1937, at the rate of 150 tons a day, and recently has been
Jan 1, 1938
-
Recovery Of Platinum Group Metals From Automobile Catalytic Converters - A ReviewBy Rajesh Kumar Mishra
About 500,000 troy ounces of Platinum Group Metals (PGM) will be available for recycling each year from spent automobile catalytic converters in North America alone. Platinum Group Metals? from spent
Jan 1, 1989
-
If the Technology Fits: An Evaluation of Mobile Proximity Detection Systems in Underground Coal MinesBy J. L. Bellanca, L. R. Swanson
DISCLAIMER The findings and conclusions in this paper are those of the authors and do not necessarily represent the official position of the National Institute for Occupational Safety and Health, Cen
Jan 1, 2019
-
Automating Communications between Laboratories and Mines – A Case from the Coal IndustryBy S Mundell, J Armstrong, M Evans
"Automation is a common goal within the coal industry for reasons such as efficiency, reliability and sustainability. However, it requires standards and frameworks so business systems can communicate
Aug 18, 2014
-
Quality Control of Production Pile Installations for US-90 Replacement Bridge Over St. Louis BayBy Kevin Kuhl
With the destruction of the US-90 Bridge spanning St. Louis Bay by Hurricane Katrina, the State of Mississippi awarded its first major design-build contract in order to have a completed four-lane brid
May 11, 2007
-
Water Flow in Uncovered Waste Rock ù A Multi-Year Large Lysimeter StudyBy L Smith, R Beckie
An intermediate scale (8 m + 8 m + 5 m high) constructed waste rock pile experiment was built upon a contiguous grid of 16 gravity drainage lysimeters to investigate the flow of water in unsaturated w
Jan 1, 2003
-
Viability of Phosphogypsum as a Secondary Resource of Rare Earth ElementsBy V. Bazhko, V. Yahorava
The calcium sulphate waste stream of the wet phosphoric acid process, commonly called phosphogypsum (PG), contains the majority of rare earth elements (REE) initially present in the apatite feedstock.
Jan 1, 2016
-
Utilising Orebody Knowledge to Improve Comminution Circuit Design and Energy UtilisationBy M S. Powell
In this paper it is argued that we are entering a new mining era, based on considerably more challenging orebodies as we rapidly expand minerals production by exploiting previously uneconomic deposits
Sep 29, 2013
-
Blasting Abrasives In The United States MarketBy G. T. Austin
Every year the United States consumes millions of dollars worth of abrasive materials as blasting media. Entrained in either a gas or liquid stream or propelled by paddles or wheels, they are directed
Jan 1, 1994
-
Evaluation of Limestone Covers and Blends for Long-Term Acid Rock Drainage Control at the Grasberg Mine, Papua Province, IndonesiaBy J Andrina, D Richar, R Smart, A Neale
The Grasberg is a large copper and gold open pit mine operated by PT Freeport Indonesia and located in the high equatorial mountains of Papua Province, Indonesia. The climate is alpine/sub-alpine with
Jan 1, 2003
-
Resources and Reserve Assurance Processes – a Framework for Improved GovernanceBy L J. de Lange
As a material asset for mining entities, the resources and reserves (RR) estimation processes are surprisingly underrepresented in the assurance landscape. When press reports expose them being inaccur
Jun 22, 2016
-
The effect of rotor-stator treatments in a randomized trial at the Newmont Carlin concentrator (Phase I)By Santiago Garcia, Dariusz Lelinski, Devan Govender, Tyson Baker, Mads Jespersen
"In recent years, the scale-up of mechanical flotation machines has been attempted with greater frequency. In contrast, the development of rotor-stator designs has been subject to greater inertia. The
Jan 1, 2014
-
Surface Thermodynamics And Extended DLVO Theory Of Leptospirillum Ferrooxidans Cells? Adhesion On Sulfide MineralsBy A. Vilinska
The adhesion of Leptospirillum ferrooxidans bacterial cells onto the sulfide minerals pyrite and chalcopyrite was evaluated using two different physical-chemical approaches; thermodynamic and extended
Jan 1, 2011
-
Variability of Gravity Recoverable Gold Values in Relation to Test Sample SizeBy S C. Dominy
The gravity recoverable gold (GRG) parameter reflects liberated gold or gold-dominated composite particles that can be recovered by gravity separation. Recoveries depend upon mineralogy, in situ parti
Sep 29, 2013
-
IC 8641 Basic Estimated Capital Investment And Operating Costs For Underground Bituminous Coal Mines - Mines With Annual Production Of 1.03 To 3.09 Million Tons From A 48-Inch CoalbedBy Sidney Katell
This Bureau of Mines study estimates capital investment, operating costs, and selling prices for three underground bituminous mines producing coal with annual production ranging from 1.03 to 3.09 mill
Jan 1, 1974
-
Separation of Radioactive Components in Nuclear Waste Processing (c507603b-224d-4376-8259-118164a92062)By B. Mishra, W. A. Averill
"The application of various hydrometallurgical, pyrometallurgical and electrochemical processes in the extraction, purification and production of radioactive metals as well as the use of various mater
Jan 1, 1996
-
The Transition from Semi-autogenous to Autogenous Milling at Waihi GoldBy D Bertoldi, C Haines
"The Waihi Gold Mine (WGM) operated by OceanaGold New Zealand Limited is a wholly owned subsidiary of the OceanaGold Corporation of Australia. Traditionally WGM has stockpiled and processed separate c
Oct 10, 2016
-
Centralizing Maintenance Resources in Mining OperationBy Pedram Sahba
In today?s emerging economy, pooling resources is a growing trend to reduce overall system costs. Two important resources of every maintenance department are repair shops and spare parts. In this work
May 1, 2013
-
OFR-32-86 Revegetation Evaluation Of Coal Strip Mine Spoils In Eastern WyomingBy M. L. Wouden
In the late 1970's, the Bureau of Mines began to examine the criteria for reestablishing vegetative cover on coal strip mine spoils near Glenrock, WY. A 9-acre plot, consisting of (1) spoils cove
Jan 1, 1986