Search Documents

Sort by

  • SME
    Determination Of Transition Depth Between Slope And Box-Cut Access For Near-Surface Coal Reserves (PRIPRINT 98-181)

    By B. K. Slone

    The depth at which it becomes more economical to use slope access as opposed to box-cut access for near-surface coal reserves, termed "transition depth," can be established for a given coal property b

    Jan 1, 1998

  • IIMP
    The Effect of Filter Cake Moisture Targets on Ancillary CAPEX and OPEX for Tailings Filtration

    By Ken Rahal, Chris Braun

    As head grades of mines around the world decline, generation of tailings is increasing. Along with the increased tailings generation, reduction in water availability, and recent tailings dame failures

    Sep 30, 2022

  • SME
    Design and Construction of Load Transfer System to Replace Existing 39th Street Bridge Piers with New Integral on the Track B/C Approach Structure for the East Side Access Project - RETC2021

    By Julio C. Martinez, Jeffrey L. Rice, Hayden Weschler

    This paper details the extensive underpinning required to hold up the 39th street Bridge while demolishing its massive support piers and building a 30ft deep Cut/ Cover RR tunnel beneath it. The under

    Jun 13, 2021

  • SME
    Deep Rock Wastewater Tunnel in Delco - NAT2022

    By Dafydd Chandler, Milissa Hirst, Charles Hurst, Gary Snyder, Leszek Glodkowski

    The Delaware County Regional Water Quality Control Authority (DELCORA) will be adding tunnel infrastructure to its wastewater conveyance system. This program involves the construction of a conveyance/

    Dec 1, 2022

  • SME
    Precision Drilling for the Pardee Chemical Feed Shaft Project - NAT2022

    By Emily Sing, Ashim Gajurel, Thomas Pennington, William Brown

    The Pardee Chemical Feed Shaft Project involves construction of two new chemical feed shafts to improve raw water treatment capabilities at the East Bay Municipal Utility District’s (EBMUD) Pardee Res

    Dec 1, 2022

  • SME
    Horizon Lateral: Reliability to Meet Community Needs Today and Tomorrow - NAT2022

    By Ray Brainard, Adriana Ventimiglia, Amanda Kerr

    Preliminary design is underway for a new Southern Nevada Water Authority (SNWA) project that will ensure one of America’s most reliable water systems by providing continued, reliable water service to

    Dec 1, 2022

  • AIME
    Development of the Benguet Mining District

    By CLYDE M. EYE

    THE Sub-province of Benguet is in the North Central part of the Island of Luzon. Baguio, the capital, is situated on a piateau 5000 ft. above sea level, and is the main health resort of the Philippine

    Jan 1, 1930

  • AIME
    Roof Studies and Mine Structure Stress Analysis, Rifle, Colo

    By H. L. Teicliman, E. M. Sipprelle

    ENACTMENT of Public Law 290 by the 78th Congress authorized the U. S. Department of the Interior, Bureau of Mines, to conduct an experimental program to develop the technology for obtaining oil from o

    Jan 1, 1950

  • ISEE
    Prototype of MEMS-based Accelerometric Network for Continuous Monitoring of Blasting Efficiency and Seismic Velocities

    By M. Szumny, P. Mertuszka, K. Fuławka

    Mining-induced seismicity is one of the adverse side effects of mining with the use of explosives at great depths. Disturbance of the primary stress state by the development of the network of excavati

    Jan 1, 2024

  • AUSIMM
    The application of critical chain project management to sublevel open stoping at Olympic Dam

    By J Light

    Since 2019, the mine planning team at Olympic Dam has been establishing and maturing a shift from deterministic to probabilistic scheduling techniques. This paper outlines this journey undertaken by t

    Mar 29, 2023

  • AUSIMM
    Ore quality measurement and control using GEOSCAN-M PGNAA real time elemental analysis

    By H Kurth

    Oyu Tolgoi copper and gold mine in the southern Mongolia holds mineral resources that make it one of the largest known copper and gold deposits in the world. The project is operating an open pit mine

    Mar 22, 2022

  • DFI
    Comparing The Bench Test and Field Test Results for the Deep Mixing at the Rio Puerto Nuevo Project in San Juan, PR

    By Filippo Maria Leoni, Wesley Schmutzler

    "Deep Mixing Method (DMM) for the Rio Puerto Nuevo Project in San Juan was chosen by the Corps of Engineers to improve the soils adjacent to a 90 inch forced sewer main relocation and to improve the s

    Jan 1, 2015

  • AUSIMM
    Conducting High Chrome Grinding Media Trials at NewcrestÆs Ridgeway Concentrator

    By C J. Greet, J Kinal, C Hitchen

    Following the successful completion of a marked ball test defining the potential wear benefits the high chrome alloys may offer against forged steel, as well as laboratory test work investigating chan

    Oct 29, 2012

  • SAIMM
    Support vector machines and convolutional neural networks applied to blasthole dislocation detection in open pit mines APCOM 2021

    By E. Emami, J. Valencia, J. Sattarvand

    The knowledge of the final location of a drillhole is critical in obtaining the expected blasting results. This paper proposes a new methodology to control the drilling accuracy in open-pit mines usin

    Sep 1, 2021

  • SME
    Denmark's Great Belt Fixed Link Bored Tunnel Project

    By Martin N. Kelley

    The Great Belt Link is a $3.5 billion fixed link across an 18 km (12 mile) wide body of water that separates the island of Zealand, on which Copenhagen is situated, and the main land mass of Denmark,

    Jan 1, 1991

  • CIM
    Geological Reconnaissance St. Augustin Area, North Shore, 'Gulf of St. Lawrence

    By W. E. Hale

    An area of about 7,000 square miles within the eastern part of the Grenville Sub-province is underlain chiefly by granitic gneisses. There are, however, some exposures of mafic rocks which warrant fur

    Jan 1, 1962

  • SME
    SAMARCO's 396 Km Pipeline A Major Step In Iron Ore Transportation

    By Milton E. Jennings

    On May 11, 1977, the SAMARCO 20-inch, 396-kilometer (246-mile) Pipeline was placed in service. This system represents the latest thinking in slurry pipeline design and is one of the main contributors

    Jan 1, 1978

  • SME
    Newmont's Deep Post Underground Mine: The Challenge Of Constructing And Operating An Underground Mine Within A Large, Active Open Pit

    By J. F. Barry

    Newmont Mining Corporation and Barrick Goldstrike Mines, Inc. concluded an exchange of land and reserves in an agreement signed May 3, 1999.This exchange of assets allowed Newmont to develop the Deep

    Jan 1, 2000

  • SME
    Short-Delay Blasting At Anaconda's Berkeley Open-Pit Mine, Montana

    By Lewis L. Oriard

    The authors outline the development and application of blasting methods put into use 11 years ago at the Berkeley Open-Pit Mine, Butte, Montana. The blast design uses a very short delay (5 millisecond

    Jan 1, 1980

  • CIM
    Unique construction methods employed for a ventilation raise at Petro-Canada's Kipp coal project

    By S. A. G. Poppen, J. Konopka

    "Petro-Canada's project investigative and experimental underground work in the Galt coal seam at Kipp, Alberta included the construction of an emergency egress and ventilation raise from surface.

    Jan 1, 1983