Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Determination Of Transition Depth Between Slope And Box-Cut Access For Near-Surface Coal Reserves (PRIPRINT 98-181)By B. K. Slone
The depth at which it becomes more economical to use slope access as opposed to box-cut access for near-surface coal reserves, termed "transition depth," can be established for a given coal property b
Jan 1, 1998
-
The Effect of Filter Cake Moisture Targets on Ancillary CAPEX and OPEX for Tailings FiltrationBy Ken Rahal, Chris Braun
As head grades of mines around the world decline, generation of tailings is increasing. Along with the increased tailings generation, reduction in water availability, and recent tailings dame failures
Sep 30, 2022
-
Design and Construction of Load Transfer System to Replace Existing 39th Street Bridge Piers with New Integral on the Track B/C Approach Structure for the East Side Access Project - RETC2021By Julio C. Martinez, Jeffrey L. Rice, Hayden Weschler
This paper details the extensive underpinning required to hold up the 39th street Bridge while demolishing its massive support piers and building a 30ft deep Cut/ Cover RR tunnel beneath it. The under
Jun 13, 2021
-
Deep Rock Wastewater Tunnel in Delco - NAT2022By Dafydd Chandler, Milissa Hirst, Charles Hurst, Gary Snyder, Leszek Glodkowski
The Delaware County Regional Water Quality Control Authority (DELCORA) will be adding tunnel infrastructure to its wastewater conveyance system. This program involves the construction of a conveyance/
Dec 1, 2022
-
Precision Drilling for the Pardee Chemical Feed Shaft Project - NAT2022By Emily Sing, Ashim Gajurel, Thomas Pennington, William Brown
The Pardee Chemical Feed Shaft Project involves construction of two new chemical feed shafts to improve raw water treatment capabilities at the East Bay Municipal Utility District’s (EBMUD) Pardee Res
Dec 1, 2022
-
Horizon Lateral: Reliability to Meet Community Needs Today and Tomorrow - NAT2022By Ray Brainard, Adriana Ventimiglia, Amanda Kerr
Preliminary design is underway for a new Southern Nevada Water Authority (SNWA) project that will ensure one of America’s most reliable water systems by providing continued, reliable water service to
Dec 1, 2022
-
Development of the Benguet Mining DistrictBy CLYDE M. EYE
THE Sub-province of Benguet is in the North Central part of the Island of Luzon. Baguio, the capital, is situated on a piateau 5000 ft. above sea level, and is the main health resort of the Philippine
Jan 1, 1930
-
Roof Studies and Mine Structure Stress Analysis, Rifle, ColoBy H. L. Teicliman, E. M. Sipprelle
ENACTMENT of Public Law 290 by the 78th Congress authorized the U. S. Department of the Interior, Bureau of Mines, to conduct an experimental program to develop the technology for obtaining oil from o
Jan 1, 1950
-
Prototype of MEMS-based Accelerometric Network for Continuous Monitoring of Blasting Efficiency and Seismic VelocitiesBy M. Szumny, P. Mertuszka, K. Fuławka
Mining-induced seismicity is one of the adverse side effects of mining with the use of explosives at great depths. Disturbance of the primary stress state by the development of the network of excavati
Jan 1, 2024
-
The application of critical chain project management to sublevel open stoping at Olympic DamBy J Light
Since 2019, the mine planning team at Olympic Dam has been establishing and maturing a shift from deterministic to probabilistic scheduling techniques. This paper outlines this journey undertaken by t
Mar 29, 2023
-
Ore quality measurement and control using GEOSCAN-M PGNAA real time elemental analysisBy H Kurth
Oyu Tolgoi copper and gold mine in the southern Mongolia holds mineral resources that make it one of the largest known copper and gold deposits in the world. The project is operating an open pit mine
Mar 22, 2022
-
Comparing The Bench Test and Field Test Results for the Deep Mixing at the Rio Puerto Nuevo Project in San Juan, PRBy Filippo Maria Leoni, Wesley Schmutzler
"Deep Mixing Method (DMM) for the Rio Puerto Nuevo Project in San Juan was chosen by the Corps of Engineers to improve the soils adjacent to a 90 inch forced sewer main relocation and to improve the s
Jan 1, 2015
-
Conducting High Chrome Grinding Media Trials at NewcrestÆs Ridgeway ConcentratorBy C J. Greet, J Kinal, C Hitchen
Following the successful completion of a marked ball test defining the potential wear benefits the high chrome alloys may offer against forged steel, as well as laboratory test work investigating chan
Oct 29, 2012
-
Support vector machines and convolutional neural networks applied to blasthole dislocation detection in open pit mines APCOM 2021By E. Emami, J. Valencia, J. Sattarvand
The knowledge of the final location of a drillhole is critical in obtaining the expected blasting results. This paper proposes a new methodology to control the drilling accuracy in open-pit mines usin
Sep 1, 2021
-
Denmark's Great Belt Fixed Link Bored Tunnel ProjectBy Martin N. Kelley
The Great Belt Link is a $3.5 billion fixed link across an 18 km (12 mile) wide body of water that separates the island of Zealand, on which Copenhagen is situated, and the main land mass of Denmark,
Jan 1, 1991
-
Geological Reconnaissance St. Augustin Area, North Shore, 'Gulf of St. LawrenceBy W. E. Hale
An area of about 7,000 square miles within the eastern part of the Grenville Sub-province is underlain chiefly by granitic gneisses. There are, however, some exposures of mafic rocks which warrant fur
Jan 1, 1962
-
SAMARCO's 396 Km Pipeline A Major Step In Iron Ore TransportationBy Milton E. Jennings
On May 11, 1977, the SAMARCO 20-inch, 396-kilometer (246-mile) Pipeline was placed in service. This system represents the latest thinking in slurry pipeline design and is one of the main contributors
Jan 1, 1978
-
Newmont's Deep Post Underground Mine: The Challenge Of Constructing And Operating An Underground Mine Within A Large, Active Open PitBy J. F. Barry
Newmont Mining Corporation and Barrick Goldstrike Mines, Inc. concluded an exchange of land and reserves in an agreement signed May 3, 1999.This exchange of assets allowed Newmont to develop the Deep
Jan 1, 2000
-
Short-Delay Blasting At Anaconda's Berkeley Open-Pit Mine, MontanaBy Lewis L. Oriard
The authors outline the development and application of blasting methods put into use 11 years ago at the Berkeley Open-Pit Mine, Butte, Montana. The blast design uses a very short delay (5 millisecond
Jan 1, 1980
-
Unique construction methods employed for a ventilation raise at Petro-Canada's Kipp coal projectBy S. A. G. Poppen, J. Konopka
"Petro-Canada's project investigative and experimental underground work in the Galt coal seam at Kipp, Alberta included the construction of an emergency egress and ventilation raise from surface.
Jan 1, 1983