Search Documents

Sort by

  • NIOSH
    Mineral Indicators - Aluminum (f195aca1-1f29-4192-9a0d-57071e1fa0a7)

    The London Metal Exchange began its first official session of aluminum trading on Monday, October 2, LME prices based on 3-month forward contracts opened Monday at 52.4 cents per pound, fell midway th

    Jan 1, 1978

  • AUSIMM
    Thermal Modelling and Mitigation Measures for the Bogong Power Development

    By D Wimpenny

    The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe

    Mar 8, 2011

  • CIM
    Luscar's coal mining operations

    By John Tribe

    "This paper gives the organizational history of Luscar Ltd. and its various coal producing operations. Each 0/ the operations is then described individually. They include the Bienfait Mine, the Bounda

    Jan 1, 1980

  • SME
    Surface Mine Development

    By William A. Hustrulid

    The subject of surface mine development is large. This section covers the fundamental concepts involved in both the open pit mining of thick or steeply dipping deposits as well as the strip mining of

    Jan 1, 2008

  • SME
    Industrial Minerals Review 2012

    Editor?s note: Each year, Mining Engineering features an industrial minerals review. Several people put in a fair amount of time in developing the material for this issue, all the while doing their ow

    Jul 1, 2013

  • AUSIMM
    Characterisation of Low-grade Hematite Ore Ultra-fine Size Fraction Particles by Heavy Suspension

    By S McKnight, L Koroznikova, J Begelhole

    "This paper outlines a simple methodology for iron ore characterisation. Iron ores commonly contain a range of iron oxides with varying iron content along with generally minor quantities of lighter si

    Jun 15, 2016

  • ABM
    Análise Dos Indicadores Ambientais Nos Relatórios De Sustentabilidade

    By Soraia Karolinne Castro Silva

    Com o objetivo de analisar o nível de aderência e a qualidade dos Indicadores Ambientais, divulgados pelas empresas dos setores: metalúrgico, siderúrgico e de mineração, que fazem parte da BM&Bove

    Aug 16, 2017

  • SME
    Drone-Based Applications for Tailings Dam Monitoring

    By Jose A. Gomez, Javad Sattarvand

    Failures of tailings dams have been happening lately. Due to the lack of laws on particular design criteria and stability requirements related monitoring during construction and maintenance, they are

    Jun 25, 2023

  • AUSIMM
    A waste fines cell with a multitude of concurrent activities

    By J J. Boshoff

    This iron ore mine site, located in the Pilbara region of Western Australia, commenced operations in 1998, with ore derived by mining of open-cut pits in Channel Iron Deposits (CIDs). A portion of the

    Jul 23, 2018

  • AIME
    The Geology and Petrography of the Goldfield Mining-District, Nevada

    By John B. Hastings

    THE reconnaissance of the Goldfield mining-district, described in this paper, was made in May and June, 1905, and, though this time was too short for a complete report, the work accomplished may serve

    Mar 1, 1906

  • CIM
    The Geology and Ore Deposits of the No. 8 Shaft Area, Dome Mine

    By Dean S. Rogers

    "In February 1980, Dome Mines Limited announced a $50 million expansion program which would result in a 50% increase in mill capacity from the present 1,815 tonnes per day to an eventual production ra

    Jan 1, 1982

  • AUSIMM
    Vertical and inclined raise bore performance at Dugald River mine

    By M Lee, J F. Carswell, G Reitsema

    "The increased costs of underground mining have continually challenged engineers to identify opportunities for alternatives to common approaches to underground development. Considerations to the desig

    Oct 16, 2017

  • AUSIMM
    An Appraisal of Tunnelling in the Auckland Region for Infrastructure Development

    By J St George

    Much of AucklandÆs transport infrastructure has been developed on surface with little or no consideration of underground options. Current and planned transportation routes are now facing high costs du

    Jan 1, 2008

  • AUSIMM
    Operating Performance of the Phu Kham IsaMill™

    By G Harbort, D Zoetbrood

    "The Phu Kham copper-gold operation in the Laos People’s Democratic Republic (PDR) is owned and operated by Phu Bia Mining Limited. PanAust Limited holds a 90 per cent interest in Phu Bia Mining Limit

    Oct 10, 2016

  • AUSIMM
    Geotechnical strata characterisation using geophysics and its application for coal mine design

    By T Medhurst

    Recent developments in geophysical borehole log analysis using the Geophysical Strata Rating (GSR) are now routinely used in a number Australian coal mining operations. This allows development of 3D g

    Nov 30, 2018

  • NIOSH
    RI 8492 Uranium Ion Exchange From Low-Grade Acidic Solutions in a Fluidized System

    By G. R. Palmer

    Using a fluidized, countercurrent multiple-compartment ion-exchange (MCIX) column previously developed by the Bureau of Mines, Bureau researchers have successfully extracted uranium from a simulated a

    Jan 1, 1980

  • AUSIMM
    SAG mill optimisation and increasing throughput at the Phu Kham Copper-Gold Operation – a success story

    By D Baas, J Le, R Braun, R Chandramohan, K Hollis, G Lane

    The Phu Kham Copper-Gold Operation (Phu Kham) is located in northern Laos, approximately 140 kilometres from the capital, Vientiane. The operation is a producing asset for Australian-based copper and

    Aug 29, 2018

  • AUSIMM
    Contract Considerations and Other Critical Ventilation Aspects in Achieving a New Mine Ramp Up

    By B Broad

    "Establishing ventilation in the early stages of a new mine is an essential step to achieve scheduled outcomes that ultimately drive the financial success of an operation. If the primary ventilation i

    Jul 1, 2013

  • AUSIMM
    An integrated approach to mine planning – building the integrated planning model at Tropicana gold mine

    By M Kent, D Elder, J Woodward, R Edwards, B Catto

    At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine

    Sep 20, 2017

  • CIM
    Review of Rare Earth Mineral Processing Technology

    By C. Edwards

    ABSTRACT The versatility and specificity of rare earth elements (REEs) have led to their use in an everincreasing variety of applications in new technologies; consequently, demand for REEs has increas

    Jan 1, 2013