Search Documents

Sort by

  • CIM
    Waste Rock Dump Closures in Cold Climates - Selection Processes and Implemented Method

    By Michel Noël

    This paper presents a partial compilation of adopted measures of waste rock dump closures at mine sites located in Canada and Alaska, where the climate includes cold winters. The paper also presents t

    Nov 1, 2008

  • SME
    How the Design is Accomplished

    By B. Pollack, L. G. Stevens

    INTRODUCTION In other chapters of this volume many of the important technical aspects in the design of concentration and dewatering circuits have been discussed. This chapter will deal with the st

    Jan 1, 1986

  • SME
    GOB Gas Analyzer System

    By Frank E. McCall, John K. Marshal, Fred Garcia

    Since the advent of longwall mining systems in the United States, mine operators are increasingly relying on methane drainage techniques to supplement the ventilation system. The most commonly used te

    Jan 1, 1995

  • CIM
    Eskay Creek Flotation Mill

    By Garry Biles, Ken Major, Raj Anand

    "Prime Resources Group Inc. (Prime) commenced the Eskay Creek Mine operations in 1994 in northern British Columbia. The ore from the underground mine is crushed and shipped to smelters in Japan and Ca

    Jan 1, 1998

  • SME
    Observations and Lessons from the International Static Database (ISD) on Neutralizing Capacity

    By Nora M. Hutt, Kevin A. Morin

    Geochemical static tests are a basic component of geochemical assessments and predictions for acidic drainage, and include acid-base accounting and total-metal contents. A key database for such inform

    Jan 1, 2000

  • AIME
    Hot Briquetting of FIOR Fines

    By N. Malakouti, R. H. Whipp, O. A. Kuby, R. M. Smailer

    A detailed description of the development of the FIOR process (Brown, Campbell, and Saxon, 1966) and, subsequently, other technical papers related to the operation and start up of the FIOR plant (Viol

    Jan 1, 1983

  • SME
    Construction Starts On The New Semmering Base Tunnel

    In April 2012, work started on one of the most ambitious construction projects of Austria?s ÖBB-Infrastruktur AG ? the New Semmering Base Tunnel. Scheduled for completion in 2024, the 27.3 km (17 mile

    Jan 1, 2013

  • IMPC
    Preparation and Mechanism of Calcium Carbonate/Titanium Dioxide Composites by Mechano-chemical Method

    By H. Ding

    Calcium carbonate/Titanium dioxide composite, characterized by coating TiO2 on the surface of CaCO3 particles, is an important substitute for titanium dioxide. This paper studies preparation method of

    Jan 1, 2014

  • SAIMM
    Evaluation of microbial amendments in a technosol produced from South African coal processing wastes, J. Weiler, J.R.Amaral Filho, M. Smart, J. Broadhurst, and S.T.L. Harrison

    By S. T. L. Harrison, J. R. Amaral Filho, M. Smart, J. Broadhurst, J. Weiler

    Technosol production from mine waste, following amendment with additional organic residues, to provide healthy and functional topsoil is an advantageous alternative to the long-term dump disposal of m

    Jan 1, 2020

  • CIM
    The Evolution of Uranium Mill Tailings Management

    By C. R. Edwards, D. G. Feasby

    "Over the last 50 years disposal of uranium mill tailings has evolved from dumping untreated tailings into the nearest depression to depositing chemically-stabilized tailings into highly engineered ma

    Jan 1, 1996

  • AUSIMM
    Open Stope Design at Normandy Golden Grove Operations

    By M P. Sandy, J B. Simpson

    The empirical stope design techniques developed by Mathews et al (1981) and refined by Potvin (1988) and others, have gained rapid acceptance in Australia in the 1990s as a simple, æfirst-passÆ means

    Jan 1, 2000

  • SME
    A GIS-Based Decision Support System For The Rehabilitation And Revegetation Of Coal Mine Spoil

    This paper presents the development of a knowledge based integrated decision support system (E.X.I.S) for the extractive industries to provide information concerning the environmental impact of extrac

    Jan 1, 2006

  • AIME
    Part X - The 1967 Howe Memorial Lecture – Iron and Steel Division - Omega Phase Precipitation and Superconducting Critical Transport Currents in Titanium-22 at. Pct Niobium (Columbium)

    By David Kramer, Cecil G. Rhodes

    Critical transport currents were measured as a function of perpendicular external magnetic field in Ti-22 at. pct Nb wire samples. These samples were heat-treated to yield w Phase precipitates at den

    Jan 1, 1968

  • ISEE
    Novel Non-Detonable Pumpable Mechanical Sensitizer and System for Emulsion Explosives for Improved Security

    By Piet Halliday, Ellina Kharatyan

    Conventionally, emulsion matrices (unsensitized) need to be sensitized to become detonable explosives. This is done either chemically or mechanically. Both methods have their advantages and disadvanta

    Jan 1, 2015

  • SME
    Wetbud – A Free Water Budget Modeling Tool for Created Wetland Design

    By Stephen Stone, Kerby Dobbs, G. Richard Whittecar, W. Lee Daniels, Zach Agioutantis, Tess Thompson

    A common result of Environmental Impact Assessments associated with mining projects is the construction of new wetlands in areas disturbed by mining operations. Where appropriate, this mitigation may

    Jan 1, 2017

  • AUSIMM
    Mineral Processing Design and Simulation Using Geostatistical Modelling of Ore Characteristics

    By Guarascio M, Massacci P

    In process simulation, more reliable prediction of industrial results and evaluation of data for design purposes and process optimisation may be attained by the combined use of: the modelling and si

    Jan 1, 1993

  • SME
    Sylvania Fossil Park: Mine Planning For The Community

    By J. Stoll

    In May 1998, Hanson Aggregates Midwest, as an outcome of mine planning, offered a 10-acre tract of land containing the famed fossil-bearing Silica formation, to the City of Sylvania, OH. in the form o

    Jan 1, 2003

  • SME
    Design And Construction Options For Surface Uranium Tailings Impoundments

    By A. MacG. Robertson

    INTRODUCTION The tailings, or solid waste, remaining after uranium has been extracted from an ore and the liquid wastes associated with it contain both radioactive and other substances which, if re

    Jan 1, 1980

  • CIM
    Heap Leaching of Gold Ores in Permafrost Conditions

    By V. I. Lakshmanan, I. G. McColl

    "Heap leaching of gold ores in permafrost conditions is feasible provided certain criteria are met. These criteria include relatively short heap leach residence time and the availability of waste heat

    Jan 1, 1987

  • NIOSH
    Part Two - Detection Range And Arrival Time Estimates - I. Summary

    By Roy Greenfield

    Estimates are given for the distance from a seismometer at which a miner can probably be detected. The procedure in making these estimates was to first establish the natural noise levels at the output

    Jan 1, 1974