Search Documents

Sort by

  • NIOSH
    IC 9142 Bureau Of Mines Cost Estimating System Handbook (In Two Parts) 1. Surface And Underground Mining

    This Bureau of Mines report and its companion report (Information Circular 9143) have been prepared to assist in the preparation of prefeasibility type estimates for capital and operating costs of min

    Jan 1, 1987

  • SME
    Practical Aspects Of Corrosion In The Wear Of Grinding Media (ebe1c47f-9c23-4521-96fe-efbad9f5616a)

    By M. J. Meulendyke

    An extensive program of marked ball wear testing (MBWT), laboratory corrosion studies, and worn ball surface analyses has been used to gain insight about the role of corrosion in the overall wear proc

    Jan 1, 1984

  • CIM
    Enabling Advanced Energy Management Practice for Minerals Operations

    By Dean L. Millar

    Measures taken by mining companies around the world to reduce their carbon footprints are becoming increasingly important in the sector securing its social licence to operate. The options for measures

    May 1, 2011

  • AUSIMM
    Inrushes and Subsidence

    By S Harvey

    An inrush of water or mud into an underground mine, or sudden subsidence above mining voids represent low probability but high impact risks in underground mining. About two such incidents involving mu

    Jan 1, 1998

  • CIM
    Battery Energy Storage As A Way To Reduce Remote Mine Electricity Costs

    By Jakob Janzen

    This paper demonstrates that the introduction of a Battery Energy Storage System (BESS) into an isolated diesel generator based grid has the potential to reduce the electricity cost and deliver a good

    Aug 1, 2013

  • SME
    Mineral Development And Land Conservation In Montana's Stillwater District (bc9f553c-0466-42ef-bf85-39ee5c04a836)

    By Timothy C. Richmond

    The Stillwater District is located in south central Montana approximately 75 miles southwest of Billings, the state's largest city. It lies along the northeast front of the Beartooth Mountains an

    Jan 1, 1974

  • DFI
    Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging Project

    By José Carlos do Amaral, Marcelo Groszownik, Jorge Beim

    "Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the

    Jan 1, 2015

  • DFI
    Slope Repairs in a Tight Footprint: Slope Stabilization Using Multiple Technologies

    By Dan Mahrt

    "In June of 2009, a slope failure occurred along River Road in Bismarck, North Dakota. The slope failure affected approximately 300 feet of River Road with vertical displacements up to 3 feet, resulti

    Jan 1, 2016

  • SME
    Use of Subsidence to Estimate Secondary Extraction of Trona

    By P. W. Conrad, C. Todd, N. West, R. Kramer

    "Surface subsidence caused by both underground room-and-pillar mining operations and solution mining operations have each been studied separately, but never combined. In 2008, FMC Minerals began using

    Jan 1, 2016

  • NIOSH
    RI 9542 - Structural Analysis of a Mechanized LHD Trench Undercut Caving System

    By C. V. Jude

    This U. S. Bureau of Mines (USBM) report presents results of stress analyses and field observations to investigate the effects of elevated trench drifts on the structural stability of rock mass zones

    Jan 1, 2010

  • NIOSH
    RI 9069 - Fugitive Dust Control for Haulage Roads and Tailing Basins

    By Keith S. Olson

    During 1982 and 1983, the Bureau of Mines concentrated its fugitive dust control research on haulage road dust suppression by newer chemi-cals relatively unknown in the mineral industry, innovative du

    Jan 1, 1987

  • SAIMM
    Geochemical and mineralogical characterization and resource potential of the Namib Pb–Zn tailings (Erongo Region, Namibia)

    By S. Lohmeier, D. Gallhofer, B. G. Lottermoser

    In Southern Africa, historic mining and mineral processing of base metal deposits have almost exclusively focussed on the extraction of major metals, leading to the loss of remaining valuable raw mate

    Sep 9, 2024

  • SME
    Broken Aro Remining/Reclamation Project

    By S. Mafi

    The Broken Aro project is associated with a 1910 abandoned underground mine complex that has been discharging aeid mine drainage from entries, seeps and springs. The Ohio Department of Natural Resourc

    Jan 1, 1998

  • NIOSH
    IC 8561 Engineering Cost Study Of Development Wells And Profitability Analysis Of Crude Oil Production

    By T. M. Garland

    This report presents a more extensive perspective of the calculated profitability of developing and producing crude oil and associated natural gas by primary methods from selected onshore areas of the

    Jan 1, 1972

  • DFI
    Route 9A Pedestrian Tunnel at the World Trade Center

    By Raymond E. Sandiford

    "The redevelopment of the World Trade Center (WTC) provided an opportunity for the Port Authority of NY and NJ to complete a long sought underground connection between all of Lower Manhattan’s transit

    Jan 1, 2012

  • SAIMM
    Elevating safety and efficiency in mining with Vision AI: From object detection to large language model-driven decision intelligence

    By Y. Zhan1, T. Moodley, M. A. H. Zahid

    Mining operations are under growing pressure to improve safety and efficiency while dealing with aging infrastructure, complex processes, and workforce constraints. Although many sites are equipped wi

    Mar 6, 2026

  • NIOSH
    OFR-2(2)-85 Cost Survey For Radon Daughter Control By Ventilation And Other Control Techniques: Radon Emissions From Underground Uranium Mines - Volume II

    By C. H. Bloomster

    This study estimated (1) radon and radon daughter emissions from underground uranium mines; (2) the reduction in radon that would be released to the surface by using control techniques such as bulkhea

    Jan 1, 1984

  • NIOSH
    OFR-73(2)-80 Topsoil Rock Removal Technology - Appendices

    By Walter W. Kaufman

    This report summarizes a study conducted to determine the state of the art of various rock removal systems and their capabilities. The Objective of the study was to determine if currently manufactured

    Jan 1, 1979

  • CIM
    Progress in Understanding of Pipeline SCC: Initiation and Propagation

    By W. Zheng

    Pipelines can develop stress corrosion cracks in either intergranular or transgranular form. Since the mid-1980s, numerous colonies of transgranular cracks have been found across Canada and many other

    Jan 1, 2005

  • AUSIMM
    Manual Control, Process Automation or Operational Performance Excellence – What is the Difference?

    By P Thwaites

    The mining industry uses many types of mineral and metallurgical plants to produce saleable product from ore mined. Plant design history has left current operations with a mixture of manual operation

    Sep 1, 2014